Search USGS⌕ Search

SEARCH · Search USGS

Results for “Engineering Structures”

Search indexed USGS publications on groundwater, aquifers, geologic maps, mineral resources and earthquakes. Explore source records by subject and place.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49Linked to original sources

Seismic Station Installation Orientation Errors at ANSS and IRIS/USGS Stations

Many seismological studies depend on the published orientations of sensitive axes of seismic instruments relative to north (e.g., Li et al., 2011). For example, studies of the anisotropic structure of the Earth’s mantle through SKS‐splitting measurements (Long et al., 2009), constraints on core–mantle electromagnetic coupling from torsional normal‐mode measurements (Dumberry and Mound, 2008), and models of three‐dimensional (3D) velocity variations from surface waves (Ekström et al., 1997) rely on accurate sensor orientation. Unfortunately, numerous results indicate that this critical parameter is often subject to significant error (Laske, 1995; Laske and Masters, 1996; Yoshizawa et al., 1999; Schulte‐Pelkum et al., 2001; Larson and Ekström, 2002). For the Advanced National Seismic System (ANSS; ANSS Technical Integration Committee, 2002), the Global Seismographic Network (GSN; Butler et al., 2004), and many other networks, sensor orientation is typically determined by a field engineer during installation. Successful emplacement of a seismic instrument requires identifying true north, transferring a reference line, and measuring the orientation of the instrument relative to the reference line. Such an exercise is simple in theory, but there are many complications in practice. There are four commonly used methods for determining true north at the ANSS and GSN stations operated by the USGS Albuquerque Seismological Laboratory (ASL), including gyroscopic, astronomical, Global Positioning System (GPS), and magnetic field techniques. A particular method is selected based on site conditions (above ground, below ground, availability of astronomical observations, and so on) and in the case of gyroscopic methods, export restrictions. Once a north line has been determined, it must be translated to the sensor location. For installations in mines or deep vaults, this step can include tracking angles through the one or more turns in the access tunnel leading to the vault (e.g., GSN station WCI in Wyandotte Cave, Indiana). Finally, the third source of error comes from the ability of field engineers to orient the sensor relative to the reference line. In order to quantify bounds on the errors in each step in the orientation process, we conducted a series of tests at the ASL using twelve GSN and ANSS field engineers. The results from this exercise allow us to estimate upper bounds on the precision of our ability to orient instruments, as well as identify the sources of error in the procedures. We are also able to identify systematic bias of various true‐north‐finding methods relative to one another. Although we are unable to estimate the absolute accuracy of our orientation measurements due to our inability to identify true north without some error, the agreement between independent methods for finding true north provides confidence in the different approaches, assuming no systematic bias. Finally, our study neglects orientation errors that are beyond the control of the field engineer during a station visit. These additional errors can arise from deviations in the sensitive axes of the instruments relative to the case markings, processing errors (Holcomb, 2002) when comparing horizontal orientations relative to other sensors (e.g., borehole installations), and deviations of the sensitive axes of instruments from true orthogonality (e.g., instruments with separate modules such as the Streckeisen STS‐1).

Seismological Research Letters↗

Hydrologic data and groundwater flow simulations in the vicinity of Long Lake, Indiana Dunes National Lakeshore, near Gary, Indiana

The U.S. Geological Survey (USGS) collected data and simulated groundwater flow to increase understanding of the hydrology and the effects of drainage alterations to the water table in the vicinity of Long Lake, near Gary, Indiana. East Long Lake and West Long Lake (collectively known as Long Lake) make up one of the largest interdunal lakes within the Indiana Dunes National Lakeshore. The National Park Service is tasked with preservation and restoration of wetlands in the Indiana Dunes National Lakeshore along the southern shoreline of Lake Michigan. Urban development and engineering have modified drainage and caused changes in the distribution of open water, streams and ditches, and groundwater abundance and flow paths. A better understanding of the effects these modifications have on the hydrologic system in the area will help the National Park Service, the Gary Sanitary District (GSD), and local stakeholders manage and protect the resources within the study area. This study used hydrologic data and steady-state groundwater simulations to estimate directions of groundwater flow and the effects of various engineering controls and climatic conditions on the hydrology near Long Lake. Periods of relatively high and low groundwater levels were examined and simulated by using MODFLOW and companion software. Simulated hydrologic modifications examined the effects of (1) removing the beaver dams in US-12 ditch, (2) discontinuing seepage of water from the filtration pond east of East Long Lake, (3) discontinuing discharge from US-12 ditch to the GSD sewer system, (4) decreasing discharge from US-12 ditch to the GSD sewer system, (5) connecting East Long Lake and West Long Lake, (6) deepening County Line Road ditch, and (7) raising and lowering the water level of Lake Michigan. Results from collected hydrologic data indicate that East Long Lake functioned as an area of groundwater recharge during October 2002 and a “flow-through” lake during March 2011, with the groundwater divide south of US-12. Wetlands to the south of West Long Lake act as points of recharge to the surficial aquifer in both dry- and wet-weather conditions. Among the noteworthy results from a dry-weather groundwater flow model simulation are (1) US-12 ditch does not receive water from East Long Lake or West Long Lake, (2) the filtration pond at the east end of East Long Lake, when active, contributed approximately 10 percent of the total water entering East Long Lake, and (3) County Line Road ditch has little effect on simulated water level. Among the noteworthy results from a wet-weather groundwater flow simulation are (1) US-12 ditch does not receive water from East Long Lake or West Long Lake, (2) when the seepage from the filtration pond to the surficial aquifer is not active, sources of inflow to East Long Lake are restricted to only precipitation (46 percent of total) and inflow from the surficial aquifer (54 percent of total), and (3) County Line Road ditch bisects the groundwater divide and creates two water-table mounds south of US-12. The results from a series of model scenarios simulating certain engineering controls and changes in Lake Michigan levels include the following: (1) The simulated removal of beaver dams in US-12 ditch during a wet-weather simulation increased discharge from the ditch to the Gary Sanitary system by 13 percent. (2) Discontinuation of seepage from the filtration pond east of East Long Lake decreased discharge from US-12 ditch to the Gary Sanitary system by 2.3 percent. (3) Simulated discontinuation of discharge from the US-12 ditch to the GSD sewer system increased the area where the water table was estimated to be above the land surface beyond the inundated area in the initial wet-weather simulation. (4) Simulated modifications to the control structure at the discharge point of US-12 ditch to the GSD sewer system can decrease discharge by as much as 61 percent while increasing the simulated inundated area during dry weather and decrease discharge as much as 6 percent while increasing the simulated inundated area during wet weather. (5) Deepening of County Line Road ditch can decrease the discharge from US-12 ditch by 26 percent during dry weather and 24 percent during wet weather, as well as decrease the extent of flooded areas south and east of the filtration pond near Ogden Dunes. (7) The increase of the Lake Michigan water level to match the historical maximum can increase the discharge from US-12 ditch by 14 percent during dry weather and by 9.6 percent during wet weather. (8) The decrease of the Lake Michigan water level to match the historical minimum can decrease the discharge from US-12 ditch by 7.4 percent during dry weather and by 3.1 percent during wet weather. The results of this study can be used by water-resource managers to understand how surrounding ditches affect water levels in East and West Long Lake and in the surrounding wetlands and residential areas. The groundwater model developed in this study can be applied in the future to answer questions about how alterations to the drainage system in the area will affect water levels in East and West Long Lake and surrounding areas. The modeling methods developed in this study provide a template for other studies of groundwater flow and groundwater/surface-water interactions within the shallow surficial aquifer in northern Indiana, and in similar hydrologic settings that include surficial sand aquifers in coastal settings.

Indiana↗

Ozone-induced changes in natural organic matter (NOM) structure

Hydrophobic organic acids (combined humic and fulvic acids), obtained from an Antarctic Lake with predominantly microbially derived organic carbon sources and two US river systems with terrestrial organic carbon sources, were ozonated. Several analyses, including 13 C‐NMR, UV absorbance, fluorescence, hydrophobic/transphilic classification, and potentiometric titrations, were performed before and after ozonation. Ozonation reduced aromatic carbon content, selectively reducing phenolic carbon content. Ozonation of the samples resulted in increased aliphatic, carboxyl, plus acetal and ketal anomeric carbon content and shifted towards less hydrophobic compounds.

Ozone: Science and Engineering↗

Flood Study of Warren Brook in Alstead and Cold River in Alstead, Langdon, and Walpole, New Hampshire, 2005

This report presents water-surface elevations and profiles as determined using the U.S. Army Corps of Engineers (USACE) one-dimensional Hydrologic Engineering Center River Analysis System, also known as HEC-RAS. Steady flow water-surface profiles were developed for two stream reaches: the Cold River from its confluence with the Connecticut River in Walpole, through Alstead to the McDermott Bridge in Langdon, NH, and Warren Brook from its confluence with the Cold River to Warren Lake in Alstead, NH. Flood events of a magnitude, which are expected to be equaled or exceeded once on the average during any 10-, 50-, 100-, or 500-year period (recurrence interval), were modeled using HEC-RAS as these flood events are recognized as being significant for flood-plain management, determination of flood insurance rates, and design of structures such as bridges and culverts. These flood events are referred to as the 10-, 50-, 100-, and 500-year floods and have a 10-, 2-, 1-, and 0.2-percent chance, respectively, of being equaled or exceeded during any year. The recurrence intervals represent the long-term average between floods of a specific magnitude. The risk of experiencing rare floods at short intervals or within the same year increases when periods greater than one year are considered. The analyses in this study reflect the flooding potentials based on conditions existing in the communities of Walpole, Alstead and Langdon at the time of completion of this study.

Open-File Report↗

Effect of uncertainty of discharge data on uncertainty of discharge simulation for the Lake Michigan Diversion, northeastern Illinois and northwestern Indiana

Simulation models of watershed hydrology (also referred to as “rainfall-runoff models”) are calibrated to the best available streamflow data, which are typically published discharge time series at the outlet of the watershed. Even after calibration, the model generally cannot replicate the published discharges because of simplifications of the physical system embedded in the model structure and uncertainties of the input data and of the estimated model parameters, which, although optimized for the given calibration data, remain uncertain. The input data errors are caused by uncertainties in the forcing data, such as precipitation and other climatological data, and in the published discharges used for calibration. In the numerical algorithms used for calibration, the published discharges are often assumed to be without error, but they are themselves uncertain, typically having been computed using ratings, which are models fitted to uncertain discharge measurements. In this study, uncertainty of published daily discharge data and how the discharge uncertainty is transmitted to the parameter values of the Hydrological Simulation Program–FORTRAN (HSPF) rainfall-runoff model and to the simulated discharge at both calibration and prediction locations were investigated for the Lake Michigan diversion in northeastern Illinois and northwestern Indiana. The HSPF model used in this study is used by the U.S. Army Corps of Engineers as part of quantifying the diversion of water from Lake Michigan by the State of Illinois. In this study, the model is calibrated jointly at two watersheds in the study area; the resulting model is considered the base model in this study. Seven other gaged watersheds in the study area are used for testing predictive simulations. A Bayesian rating curve estimation (BaRatin) approach, the BaRatin stage-period-discharge (SPD) method, was used to estimate the uncertainty of the published discharge from the calibration watersheds. To characterize the effect of the discharge uncertainty on parameter values, the HSPF model parameters were recalibrated to 17 nonrandomly selected pairs of discharge series from the BaRatin SPD analysis. To provide an indicator of the effect of parameter uncertainty to compare to the effect of discharge uncertainty, 1,000 parameter sets also were randomly generated from the estimated parameter covariance matrix of the base model. The recalibrated and random parameter sets were then used in HSPF simulations of discharge at the two calibration watersheds and at the seven prediction watersheds. Selected discharge summary statistics—the period-of-study (POS, water years 1997 to 2015) mean discharge, selected flow-duration curve (FDC) quantiles, and water year mean discharges—are used to characterize the variability between simulated and published discharge. A normalized variability index ( V N ) is used as a measure of the uncertainty of flow statistics arising from the uncertainty of the sources considered in this study. When this index is at least 1, the variability of the simulations is large enough to explain the median error between simulated and published values, although offsetting errors from other sources are also likely. When the index is appreciably less than 1, the variability of the simulations is clearly insufficient to explain the median error between simulated and published values. At the two calibration watersheds and for results of the two simulation sets considered together, the V N values ranged from 0.2 to 0.8 for POS mean discharge, from 0.3 to 0.6 in the median for a set of FDC quantiles, and from 0.1 to 0.2 in the median for water year mean discharges. These values indicate that substantial uncertainty remains unexplained. Even though two watersheds were used in calibration, that calibration was highly constrained because it was applied to the watersheds simultaneously and was subject to parameter regularization that constrained the adjustment of the parameters from their initial values. These constraints were applied to avoid overfitting to the calibration watersheds and thus to increase the likelihood that the resulting parameters would give accurate results at watersheds not used in the calibration, but they created a parameter transfer error in the calibration watershed results shown by the balancing of errors between the two watersheds. Additional remaining error sources include model structural error and meteorological forcing error to the degree that the calibration was unable to adjust the parameters to account for these errors. At the prediction watersheds, the corresponding V N values were almost always substantially lower than those values at the calibration watersheds. This result is expected because the prediction watersheds have additional uncertainty, including parameter transfer error. The work described in this report provides preliminary estimates of a limited range of sources of error in predicted discharge uncertainty. Future work would be beneficial to obtain a better statistical characterization of the effect of the uncertainty of calibration discharge series and to address additional sources of uncertainty, such as from precipitation input data used in calibration and prediction and from structural (model) errors.

Illinois, Indiana↗

Front Range Infrastructure Resources Project--Biological Resources

Riparian (streamside) vegetation communities are of interest in the context of the Front Range Infrastructure Resources Project (FRIRP) because they are often a focal point for conflicting societal demands. The cottonwoods and willows comprising these communities are structurally complex compared to the surrounding landscape and support diverse assemblages of mammals, birds, reptiles, and amphibians. However, riparian areas are also primary sites for water development, agriculture, grazing, sand and gravel mining, and recreation, each of which may limit other uses. Direct and indirect impacts of these activities have led to exploration of new opportunities and techniques for restoring disturbed riparian habitats and to greater concern for some of the scarce species that inhabit them.

Colorado, Wyoming↗

Sediment cores and chemistry for the Kootenai River White Sturgeon Habitat Restoration Project, Boundary County, Idaho

The Kootenai Tribe of Idaho, in cooperation with local, State, Federal, and Canadian agency co-managers and scientists, is assessing the feasibility of a Kootenai River habitat restoration project in Boundary County, Idaho. This project is oriented toward recovery of the endangered Kootenai River white sturgeon (Acipenser transmontanus) population, and simultaneously targets habitat-based recovery of other native river biota. Projects currently (2010) under consideration include modifying the channel and flood plain, installing in-stream structures, and creating wetlands to improve the physical and biological functions of the ecosystem. River restoration is a complex undertaking that requires a thorough understanding of the river. To assist in evaluating the feasibility of this endeavor, the U.S. Geological Survey collected and analyzed the physical and chemical nature of sediment cores collected at 24 locations in the river. Core depths ranged from 4.6 to 15.2 meters; 21 cores reached a depth of 15.2 meters. The sediment was screened for the presence of chemical constituents that could have harmful effects if released during restoration activities. The analysis shows that concentrations of harmful chemical constituents do not exceed guideline limits that were published by the U.S. Army Corps of Engineers in 2006.

Idaho↗

Use of surrogate technologies to estimate suspended sediment in the Clearwater River, Idaho, and Snake River, Washington, 2008-10

Elevated levels of fluvial sediment can reduce the biological productivity of aquatic systems, impair freshwater quality, decrease reservoir storage capacity, and decrease the capacity of hydraulic structures. The need to measure fluvial sediment has led to the development of sediment surrogate technologies, particularly in locations where streamflow alone is not a good estimator of sediment load because of regulated flow, load hysteresis, episodic sediment sources, and non-equilibrium sediment transport. An effective surrogate technology is low maintenance and sturdy over a range of hydrologic conditions, and measured variables can be modeled to estimate suspended-sediment concentration (SSC), load, and duration of elevated levels on a real-time basis. Among the most promising techniques is the measurement of acoustic backscatter strength using acoustic Doppler velocity meters (ADVMs) deployed in rivers. The U.S. Geological Survey, in cooperation with the U.S. Army Corps of Engineers, Walla Walla District, evaluated the use of acoustic backscatter, turbidity, laser diffraction, and streamflow as surrogates for estimating real-time SSC and loads in the Clearwater and Snake Rivers, which adjoin in Lewiston, Idaho, and flow into Lower Granite Reservoir. The study was conducted from May 2008 to September 2010 and is part of the U.S. Army Corps of Engineers Lower Snake River Programmatic Sediment Management Plan to identify and manage sediment sources in basins draining into lower Snake River reservoirs. Commercially available acoustic instruments have shown great promise in sediment surrogate studies because they require little maintenance and measure profiles of the surrogate parameter across a sampling volume rather than at a single point. The strength of acoustic backscatter theoretically increases as more particles are suspended in the water to reflect the acoustic pulse emitted by the ADVM. ADVMs of different frequencies (0.5, 1.5, and 3 Megahertz) were tested to target various sediment grain sizes. Laser diffraction and turbidity also were tested as surrogate technologies. Models between SSC and surrogate variables were developed using ordinary least-squares regression. Acoustic backscatter using the high frequency ADVM at each site was the best predictor of sediment, explaining 93 and 92 percent of the variability in SSC and matching sediment sample data within +8.6 and +10 percent, on average, at the Clearwater River and Snake River study sites, respectively. Additional surrogate models were developed to estimate sand and fines fractions of suspended sediment based on acoustic backscatter. Acoustic backscatter generally appears to be a better estimator of suspended sediment concentration and load over short (storm event and monthly) and long (annual) time scales than transport curves derived solely from the regression of conventional sediment measurements and streamflow. Changing grain sizes, the presence of organic matter, and aggregation of sediments in the river likely introduce some variability in the model between acoustic backscatter and SSC.

Idaho;Washington↗

U.S. Geological Survey Activities Related to American Indians and Alaska Natives: Fiscal Year 2005

Introduction This report describes the activities that the U.S. Geological Survey (USGS) conducted with American Indian and Alaska Native governments, educational institutions, and individuals during Federal fiscal year (FY) 2005. Most of these USGS activities were collaborations with Tribes, Tribal organizations, or professional societies. Others were conducted cooperatively with the Bureau of Indian Affairs (BIA) or other Federal entities. The USGS is the earth and natural science bureau within the U.S. Department of the Interior (DOI). The USGS does not have regulatory or land management responsibilities. As described in this report, there are many USGS activities that are directly relevant to American Indians, Alaska Natives, and to Native lands. A USGS website, dedicated to making USGS more accessible to American Indians, Alaska Natives, their governments, and institutions, is available at www.usgs.gov/indian. This website includes information on how to contact USGS American Indian/Alaska Native Liaisons, training opportunities, and links to other information resources. This report and previous editions are also available through the website. The USGS realizes that Native knowledge and cultural traditions of living in harmony with nature result in unique Native perspectives that enrich USGS studies. USGS seeks to increase the sensitivity and openness of its scientists to the breadth of Native knowledge, expanding the information on which their research is based. USGS scientific studies include data collection, mapping, natural resource modeling, and research projects. These projects typically last 2 or 3 years, although some are parts of longer-term activities. Some projects are funded cooperatively, with USGS funds matched or supplemented by individual Tribal governments, or by the BIA. These projects may also receive funding from the U.S. Environmental Protection Agency (USEPA), the Indian Health Service (part of the Department of Health and Human Services), or other Federal agencies. The USGS routinely works with its sister bureaus in the Department of the Interior to provide the scientific information and expertise needed to meet the Department's science priorities. Some USGS activities described in this report are conducted as collateral tasks that result from USGS employees identifying and responding to perceived needs. These endeavors are usually prompted by employee interests and frequently involve educational activities. The education is often a reciprocal learning and teaching experience for USGS employees and for Native participants. Through these activities, USGS employees help to fulfill a mission of the USGS - to demonstrate scientific relevance - while helping their fellow citizens. Increasingly, some of the educational activities are becoming parts of formal USGS projects. USGS employees also take initiative in assisting American Indians and Alaska Natives by participating in several organizations that promote awareness of science career opportunities among Native peoples and help build support and communication networks. One such group is the American Indian Science and Engineering Society (AISES). USGS employees join this organization on a voluntary basis, bringing the benefits of this expanded network to the USGS, as many employees do with other professional organizations. The studies briefly described in this report span subsistence issues, wildlife health, water quality, mineral resources, monitoring and modeling to gather information and predict what may happen in the future. Although each project description relates to Native Americans in some way, the projects vary widely, including who conducted the work, the goals and products, the duration of the study, and whether it was local or covered a broad area. Each major organizational unit of the USGS has identified an American Indian/Alaska Native liaison. The USGS has a regional organizational structure, with Western, Central,

Circular↗

Beacon Hill end moraine, Boston: new explanation of an important urban feature

The usefulness of geology to engineers is in direct proportion to how well it helps us predict the subsurface; these predictions, in turn, depend on our knowledge of the geomorphic processes that molded the terrain. The uncertainties of interpretation are particularly great in glaciated terrain because our understanding of both glacial processes and history is so incomplete, a fact well illustrated in Beacon Hill. Recent construction activities in the eastern part of the hill, until now classified as a drumlin, have shown that it is better interpreted as an end moraine formed by a Wisconsonian glacial readvance. Instead of the firm till that was anticipated as foundation material, excavations exposed a complex of sand, gravel, and clay, with only minor zones of till. The structure of these deposits strongly suggests that originally they were plates of the glacial bed that froze to the glacier and were transported englacially. Thrust faulting and other deformations are glacial structures formed within the ice in the glacier's terminal zone. In spite of the complex englacial history, these deposits lost little of their original appearance and intergranular relationships. Upon deglaciation, the frozen moraine thawed, and slumping formed complex secondary structures on the ridge's lower flanks.

Massachusetts↗

Mercury adsorption properties of sulfur-impregnated adsorbents

Carbonaceous and noncarbonaceous adsorbents were impregnated with elemental sulfur to evaluate the chemical and physical properties of the adsorbents and their equilibrium mercury adsorption capacities. Simulated coal combustion flue gas conditions were used to determine the equilibrium adsorption capacities for Hg0 and HgCl2 gases to better understand how to remove mercury from gas streams generated by coal-fired utility power plants. Sulfur was deposited onto the adsorbents by monolayer surface deposition or volume pore filling. Sulfur impregnation increased the total sulfur content and decreased the total and micropore surface areas and pore volumes for all of the adsorbents tested. Adsorbents with sufficient amounts of active adsorption sites and sufficient microporous structure had mercury adsorption capacities up to 4,509 ??g Hg/g adsorbent. Elemental sulfur, organic sulfur, and sulfate were formed on the adsorbents during sulfur impregnation. Correlations were established with R2>0.92 between the equilibrium Hg0/HgCl2 adsorption capacities and the mass concentrations of elemental and organic sulfur. This result indicates that elemental and organic sulfur are important active adsorption sites for Hg0 and HgCl2.

Journal of Environmental Engineering↗

Designing a multi-objective, multi-support accuracy assessment of the 2001 National Land Cover Data (NLCD 2001) of the conterminous United States

The database design and diverse application of NLCD 2001 pose significant challenges for accuracy assessment because numerous objectives are of interest, including accuracy of land-cover, percent urban imperviousness, percent tree canopy, land-cover composition, and net change. A multi-support approach is needed because these objectives require spatial units of different sizes for reference data collection and analysis. Determining a sampling design that meets the full suite of desirable objectives for the NLCD 2001 accuracy assessment requires reconciling potentially conflicting design features that arise from targeting the different objectives. Multi-stage cluster sampling provides the general structure to achieve a multi-support assessment, and the flexibility to target different objectives at different stages of the design. We describe the implementation of two-stage cluster sampling for the initial phase of the NLCD 2001 assessment, and identify gaps in existing knowledge where research is needed to allow full implementation of a multi-objective, multi-support assessment. ?? 2008 American Society for Photogrammetry and Remote Sensing.

Photogrammetric Engineering and Remote Sensing↗

Assessing the effectiveness of riparian restoration projects using Landsat and precipitation data from the cloud-computing application ClimateEngine.org

Riparian vegetation along streams provides a suite of ecosystem services in rangelands and thus is the target of restoration when degraded by over-grazing, erosion, incision, or other disturbances. Assessments of restoration effectiveness depend on defensible monitoring data, which can be both expensive and difficult to collect. We present a method and case study to evaluate the effectiveness of restoration of riparian vegetation using a web-based cloud-computing and visualization tool (ClimateEngine.org) to access and process remote sensing and climate data. Restoration efforts on an Eastern Oregon ranch were assessed by analyzing the riparian areas of four creeks that had in-stream restoration structures constructed between 2008 and 2011. Within each study area, we retrieved spatially and temporally aggregated values of summer (June, July, August) normalized difference vegetation index (NDVI) and total precipitation for each water year (October-September) from 1984 to 2017. We established a pre-restoration (1984–2007) linear regression between total water year precipitation and summer NDVI for each study area, and then compared the post-restoration (2012–2017) data to this pre-restoration relationship. In each study area, the post-restoration NDVI-precipitation relationship was statistically distinct from the pre-restoration relationship, suggesting a change in the fundamental relationship between precipitation and NDVI resulting from stream restoration. We infer that the in-stream structures, which raised the water table in the adjacent riparian areas, provided additional water to the streamside vegetation that was not available before restoration and reduced the dependence of riparian vegetation on precipitation. This approach provides a cost-effective, quantitative method for assessing the effects of stream restoration projects on riparian vegetation.

Oregon↗

Nitrous oxide emissions from cropland: a procedure for calibrating the DayCent biogeochemical model using inverse modelling

DayCent is a biogeochemical model of intermediate complexity widely used to simulate greenhouse gases (GHG), soil organic carbon and nutrients in crop, grassland, forest and savannah ecosystems. Although this model has been applied to a wide range of ecosystems, it is still typically parameterized through a traditional “trial and error” approach and has not been calibrated using statistical inverse modelling (i.e. algorithmic parameter estimation). The aim of this study is to establish and demonstrate a procedure for calibration of DayCent to improve estimation of GHG emissions. We coupled DayCent with the parameter estimation (PEST) software for inverse modelling. The PEST software can be used for calibration through regularized inversion as well as model sensitivity and uncertainty analysis. The DayCent model was analysed and calibrated using N2O flux data collected over 2 years at the Iowa State University Agronomy and Agricultural Engineering Research Farms, Boone, IA. Crop year 2003 data were used for model calibration and 2004 data were used for validation. The optimization of DayCent model parameters using PEST significantly reduced model residuals relative to the default DayCent parameter values. Parameter estimation improved the model performance by reducing the sum of weighted squared residual difference between measured and modelled outputs by up to 67 %. For the calibration period, simulation with the default model parameter values underestimated mean daily N2O flux by 98 %. After parameter estimation, the model underestimated the mean daily fluxes by 35 %. During the validation period, the calibrated model reduced sum of weighted squared residuals by 20 % relative to the default simulation. Sensitivity analysis performed provides important insights into the model structure providing guidance for model improvement.

Water, Air, & Soil Pollution↗

Management of fluid mud in estuaries, bays, and lakes. II: Measurement, modeling, and management

Techniques for measurement, modeling, and management of fluid mud are available, but research is needed to improve them. Fluid mud can be difficult to detect, measure, or sample, which has led to new instruments and new ways of using existing instruments. Multifrequency acoustic fathometers sense neither density nor viscosity and are, therefore, unreliable in measuring fluid mud. Nuclear density probes, towed sleds, seismic, and drop probes equipped with density meters offer the potential for accurate measurements. Numerical modeling of fluid mud requires solving governing equations for flow velocity, density, pressure, salinity, water surface, plus sediment submodels. A number of such models exist in one-, two-, and three-dimensional form, but they rely on empirical relationships that require substantial site-specific validation to observations. Management of fluid mud techniques can be classified as those that accomplish: Source control, formation control, and removal. Nautical depth, a fourth category, defines the channel bottom as a specific fluid mud density or alternative parameter as safe for navigation. Source control includes watershed management measures to keep fine sediment out of waterways and in-water measures such as structures and traps. Formation control methods include streamlined channels and structures plus other measures to reduce flocculation and structures that train currents. Removal methods include the traditional dredging and transport of dredged material plus agitation that contributes to formation control and/or nautical depth. Conditioning of fluid mud by dredging and aerating offers the possibility of improved navigability. Two examples—the Atchafalaya Bar Channel and Savannah Harbor—illustrate the use of measurements and management of fluid mud.

Journal of Hydraulic Engineering↗

Mississippi River streamflow measurement techniques at St. Louis, Missouri

Streamflow measurement techniques of the Mississippi River at St. Louis have changed through time (1866–present). In addition to different methods used for discrete streamflow measurements, the density and range of discrete measurements used to define the rating curve (stage versus streamflow) have also changed. Several authors have utilized published water surface elevation (stage) and streamflow data to assess changes in the rating curve, which may be attributed to be caused by flood control and/or navigation structures. The purpose of this paper is to provide a thorough review of the available flow measurement data and techniques and to assess how a strict awareness of the limitations of the data may affect previous analyses. It is concluded that the pre-1930s discrete streamflow measurement data are not of sufficient accuracy to be compared with modern streamflow values in establishing long-term trends of river behavior.

Missouri↗

Using high sample rate lidar to measure debris-flow velocity and surface geometry

Debris flows evolve in both time and space in complex ways, commonly starting as coherent failures but then quickly developing structures such as roll waves and surges. These processes are readily observed but difficult to study or quantify because of the speed at which they evolve. Many methods for studying debris flows consist of point measurements (e.g., flow height or basal stresses), which are inherently limited in spatial coverage and cannot fully characterize the spatiotemporal evolution of a flow. In this study, we use terrestrial lidar to measure debris-flow profiles at high sampling rates to examine debris-flow movement with high temporal and spatial precision and accuracy. We acquired measurements during gate-release experiments at the U.S. Geological Survey debris-flow flume, a unique experimental facility where debris flows can be artificially generated at a large scale. A lidar scanner was used to record repeat topographic profiles of the moving debris flows along the length of the flume with a narrow swath width (∼1 mm) at a rate of 60 Hz. The high-resolution lidar profiles enabled us to quantify flow front velocity of the debris flows and provided an unprecedented record of the development and evolution of the flow structure with a sub-second time resolution. The findings of this study demonstrate how to obtain quantitative measurements of debris-flow movement. In addition, the data help us to quantitatively define the development of a saltating debris-flow front and roll waves behind the debris-flow front. Such measurements may help constrain future modeling efforts.

Environmental and Engineering Geoscience↗

Seismic response analysis of a 13-story steel moment-framed building in Alhambra, California

The seismic performance of steel moment-framed buildings has been of particular interest since brittle fractures were discovered at the beam-column connections of some frames following the M6.7 1994 Northridge earthquake. This report presents an investigation of the seismic behavior of an instrumented 13-story steel moment frame building located in the greater Los Angeles area of California. An extensive strong motion dataset, ambient vibration data, engineering drawings and earthquake damage reports are available for this building. The data are described and subsequently analyzed. The results of the analyses show that the building response is more complex than would be expected from its highly symmetrical geometry. The building's response is characterized by low damping in the fundamental mode, larger peak accelerations in the intermediate stories than at the roof, extended periods of vibration after the cessation of strong input shaking, beating in the response, and significant torsion during strong shaking at the top of the concrete piers which extend from the basement to the second floor. The analyses of the data and all damage detection methods employed except one method based on system identification indicate that the response of the structure was elastic in all recorded earthquakes. These findings are in general agreement with the results of intrusive inspections (meaning fireproofing and architectural finishes were removed) conducted on approximately 5 percent of the moment connections following the Northridge earthquake, which found no earthquake damage.

Open-File Report↗