Search USGSSearch

SEARCH · Search USGS

Results for “Engineering Analysis”

Search indexed USGS publications on groundwater, aquifers, geologic maps, mineral resources and earthquakes. Explore source records by subject and place.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11Linked to original sources

Simulation of a proposed emergency outlet from Devils Lake, North Dakota

From 1993 to 2001, Devils Lake rose more than 25 feet, flooding farmland, roads, and structures around the lake and causing more than $400 million in damages in the Devils Lake Basin. In July 2001, the level of Devils Lake was at 1,448.0 feet above sea level 1 , which was the highest lake level in more than 160 years. The lake could continue to rise to several feet above its natural spill elevation to the Sheyenne River (1,459 feet above sea level) in future years, causing extensive additional flooding in the basin and, in the event of an uncontrolled natural spill, downstream in the Red River of the North Basin as well. The outlet simulation model described in this report was developed to determine the potential effects of various outlet alternatives on the future lake levels and water quality of Devils Lake. Lake levels of Devils Lake are controlled largely by precipitation on the lake surface, evaporation from the lake surface, and surface inflow. For this study, a monthly water-balance model was developed to compute the change in total volume of Devils Lake, and a regression model was used to estimate monthly water-balance data on the basis of limited recorded data. Estimated coefficients for the regression model indicated fitted precipitation on the lake surface was greater than measured precipitation in most months, fitted evaporation from the lake surface was less than estimated evaporation in most months, and ungaged inflow was about 2 percent of gaged inflow in most months. Dissolved sulfate was considered to be the key water-quality constituent for evaluating the effects of a proposed outlet on downstream water quality. Because large differences in sulfate concentrations existed among the various bays of Devils Lake, monthly water-balance data were used to develop detailed water and sulfate mass-balance models to compute changes in sulfate load for each of six major storage compartments in response to precipitation, evaporation, inflow, and outflow from each compartment. The storage compartments--five for Devils Lake and one for Stump Lake--were connected by bridge openings, culverts, or natural channels that restricted mixing between compartments. A numerical algorithm was developed to calculate inflow and outflow from each compartment. Sulfate loads for the storage compartments first were calculated using the assumptions that no interaction occurred between the bottom sediments and the water column and no wind- or buoyancy-induced mixing occurred between compartments. However, because the fitted sulfate loads did not agree with the estimated sulfate loads, which were obtained from recorded sulfate concentrations, components were added to the sulfate mass-balance model to account for the flux of sulfate between bottom sediments and the lake and for mixing between storage compartments. Mixing between compartments can occur during periods of open water because of wind and during periods of ice cover because of water-density differences between compartments. Sulfate loads calculated using the sulfate mass-balance model with sediment interaction and mixing between compartments closely matched sulfate loads computed from historical concentrations. The water and sulfate mass-balance models were used to calculate potential future lake levels and sulfate concentrations for Devils Lake and Stump Lake given potential future values of monthly precipitation, evaporation, and inflow. Potential future inputs were generated using a scenario approach and a stochastic approach. In the scenario approach, historical values of precipitation, evaporation, and inflow were repeated in the future for a particular sequence of historical years. In the stochastic approach, a statistical time-series model was developed to randomly generate potential future inputs. The scenario approach was used to evaluate the effectiveness of various outlet alternatives, and the stochastic approach was used to evaluate the hydrologic and water-quality effects of the potential outlet alternatives that were selected on the basis of the scenario analysis. Given potential future lake levels and sulfate concentrations generated using either the scenario or stochastic approach and potential future ambient flows and sulfate concentrations for the Sheyenne River receiving waters, daily outlet discharges could be calculated for virtually any outlet alternative. For the scenario approach, future ambient flows and sulfate concentrations for the Sheyenne River were generated using the same sequence of years used for generating water-balance data for Devils Lake. For the stochastic approach, a procedure was developed for generating daily Sheyenne River flows and sulfate concentrations that were "in-phase" with the generated water-balance data for Devils Lake. Simulation results for the scenario approach indicated that neither of the West Bay outlet alternatives provided effective flood-damage reduction without exceeding downstream water-quality constraints. However, both Pelican Lake outlet alternatives provided significant flood-damage reduction with only minor downstream water-quality changes. The most effective alternative for controlling rising lake levels was a Pelican Lake outlet with a 480-cubic-foot-per-second pump capacity and a 250-milligram-per-liter downstream sulfate constraint. However, this plan is costly because of the high pump capacity and the requirement of a control structure on Highway 19 to control the level of Pelican Lake. A less costly, though less effective for flood-damage reduction, plan is a Pelican Lake outlet with a 300-cubic-foot-per-second pump capacity and a 250-milligram-per-liter downstream sulfate constraint. The plan is less costly because the pump capacity is smaller and because the control structure on Highway 19 is not required. The less costly Pelican Lake alternative with a 450-milligramper- liter downstream sulfate constraint rather than a 250-milligram-per-liter downstream sulfate constraint was identified by the U.S. Army Corps of Engineers as the preferred alternative for detailed design and engineering analysis. Simulation results for the stochastic approach indicated that the geologic history of lake-level fluctuations of Devils Lake for the past 2,500 years was consistent with a climatic history that consisted of two climate states--a wet state, similar to conditions during 1980-99, and a normal state, similar to conditions during 1950-78. The transition times between the wet and normal climatic periods occurred randomly. The average duration of the wet climatic periods was 20 years, and the average duration of the normal climatic periods was 120 years. The stochastic approach was used to generate 10,000 independent sequences of lake levels and sulfate concentrations for Devils Lake for water years 2001-50. Each trace began with the same starting conditions, and the duration of the current wet cycle was generated randomly for each trace. Each trace was generated for the baseline (natural) condition and for the Pelican Lake outlet with a 300-cubic-foot-per-second pump capacity and a 450-milligram-per-liter downstream sulfate constraint. The outlet significantly lowered the probabilities of future lake-level increases within the next 50 years and did not substantially increase the probabilities of reaching low lake levels or poor water-quality conditions during the same period.

Water-Resources Investigations Report

Preliminary evaluation of the feasibility of artificial recharge in northern Qater

Fresh ground water in northern Qatar occurs as a lens in limestone and dolomite of Eocene age. Natural recharge from precipitation averages 17x106 cubic metres per year whereas current discharge averages 26.6x106 cubic metres per year. Depletion of storage is accompanied by a deterioration in quality due to encroachment of salty water from the Gulf and from underlying formations. Artificial recharge with desalted sea water to permit additional agricultural development appears technically feasible but its practicability needs to be examined further. A hydrogeological appraisal including test drilling, geophysical logging, pumping tests, and a recharge test, coupled with engineering analysis of direct surface storage/distribution of desalted sea water versus aquifer storage/distribution, is recommended.

Open-File Report

Comment on "How can seismic hazard around the New Madrid seismic zone be similar to that in California?" by Arthur Frankel

A recent paper in the September/October 2004 issue of Seismological Research Letters, “How Can Seismic Hazard around the New Madrid Seismic Zone Be Similar to That in California?”, by Arthur Frankel, concludes “I have demonstrated how probabilistic seismic hazard for New Madrid can be greater than that at San Francisco at low probabilities for PGA and similar at low probabilities for 5 Hz S.A. By low probabilities, I mean annual probabilities less than the reciprocal of the return time of the New Madrid characteristic source, that is, 1/500. This is a consequence of the higher ground motions, for PGA and 5 Hz S.A. (and other high-frequency measures), expected for large New Madrid characteristic earthquakes compared to San Andreas earthquakes with similar magnitudes.” His conclusion is confusing and not necessarily true. The fundamental differences in assessing seismic hazard between San Francisco and the New Madrid seismic zone are the uncertainties, especially the uncertainties associated with the ground-motion attenuation relationship. The larger ground-motion uncertainties in both the median and its standard deviation derive a higher hazard in the New Madrid area. The larger standard deviation, in particular, derives a higher hazard at low annual probabilities of exceedance. Moreover, Frankel also equated the hazard (annual probability of exceedance) defined in probabilistic seismic hazard analysis (PSHA) with the average recurrence rate defined in engineering risk analysis. There is a fundamental difference in defining risk between PSHA and the engineering risk analysis. The risks—10%, 5%, and 2% probability of exceedance (PE) in 50 years—defined in PSHA are not interchangeable with those defined in engineering risk analysis. Hence, though Frankel's stated intention was to improve understanding of PSHA among nonpractitioners, the paper may cause more confusion and problems for users of the U.S. Geological Survey national seismic hazard maps.

Seismological Research Letters

Hydrologic, Hydraulic, and Flood Analyses of the Blackberry Creek Watershed, Kendall County, Illinois

Results of the hydrologic model, flood-frequency, hydraulic model, and flood-hazard analysis of the Blackberry Creek watershed in Kendall County, Illinois, indicate that the 100-year and 500-year flood plains cover approximately 3,699 and 3,762 acres of land, respectively. On the basis of land-cover data for 2003, most of the land in the flood plains was cropland and residential land. Although many acres of residential land were included in the flood plain, this land was mostly lawns, with 25 homes within the 100-year flood plain, and 41 homes within the 500-year flood plain in the 2003 aerial photograph. This report describes the data collection activities to refine the hydrologic and hydraulic models used in an earlier study of the Kane County part of the Blackberry Creek watershed and to extend the flood-frequency analysis through water year 2003. The results of the flood-hazard analysis are presented in graphical and tabular form. The hydrologic model, Hydrological Simulation Program - FORTRAN (HSPF), was used to simulate continuous water movement through various land-use patterns in the watershed. Flood-frequency analysis was applied to an annual maximum series to determine flood quantiles in subbasins for flood-hazard analysis. The Hydrologic Engineering Center- River Analysis System (HEC-RAS) hydraulic model was used to determine the 100-year and 500-year flood elevations, and the 100-year floodway. The hydraulic model was calibrated and verified using observations during three storms at two crest-stage gages and the U.S. Geological Survey streamflowgaging station near Yorkville. Digital maps of the 100-year and 500-year flood plains and the 100-year floodway for each tributary and the main stem of Blackberry Creek were compiled.

Scientific Investigations Report

Engineering geologic and geotechnical analysis of paleoseismic shaking using liquefaction effects: Field examples

The greatest impediments to the widespread acceptance of back-calculated ground motion characteristics from paleoliquefaction studies typically stem from three uncertainties: (1) the significance of changes in the geotechnical properties of post-liquefied sediments (e.g., "aging" and density changes), (2) the selection of appropriate geotechnical soil indices from individual paleoliquefaction sites, and (3) the methodology for integration of back-calculated results of strength of shaking from individual paleoliquefaction sites into a regional assessment of paleoseismic strength of shaking. Presented herein are two case studies that illustrate the methods outlined by Olson et al. [Engineering Geology, this issue] for addressing these uncertainties. The first case study is for a site near Memphis, Tennessee, wherein cone penetration test data from side-by-side locations, one of liquefaction and the other of no liquefaction, are used to readily discern that the influence of post-liquefaction "aging" and density changes on the measured in situ soil indices is minimal. In the second case study, 12 sites that are at scattered locations in the Wabash Valley and that exhibit paleoliquefaction features are analyzed. The features are first provisionally attributed to the Vincennes Earthquake, which occurred around 6100 years BP, and are used to illustrate our proposed approach for selecting representative soil indices of the liquefied sediments. These indices are used in back-calculating the strength of shaking at the individual sites, the results from which are then incorporated into a regional assessment of the moment magnitude, M, of the Vincennes Earthquake. The regional assessment validated the provisional assumption that the paleoliquefaction features at the scattered sites were induced by the Vincennes Earthquake, in the main, which was determined to have M ??? 7.5. The uncertainties and assumptions used in the assessment are discussed in detail. ?? 2004 Elsevier B.V. All rights reserved.

Engineering Geology

Preliminary analysis of lineaments and engineering properties of bedrock, Penobscot Bay area, Maine

A remote sensing study of coastal and near coastal Maine was undertaken to identify bedrock features of possible importance to construction. Major lineaments were identified that separate the region into four distinct terrains. Within each terrain, smaller lineaments and other physiographic features show distinctive and consistent patterns, reflecting similarities in bedrock lithology and structure. The major linear features are given the following provisional geographic names: I. Lewiston line 2. Merrymeeting lineament 3. Dover-Foxcroft line 4. Orland lineament 5. Union lineament These linear or curvilinear trends are caused by lithologic contrasts, joints, faults, or foliation in the middle and lower Paleozoic phyllites, schists, gneisses, and granite intrusives. Initial field and laboratory results from a pilot study of bedrock engineering conditions indicate that variations in rock strength and fracture spacing are controlled by lithology, intensity of structural deformation, and alteration. At several locations in the study area faults and major joints are alined with a major lineament. Strength anisotropy ratios are as high as 10 in the foliated rocks but near 1 in the granites. The higher compressive strength direction commonly is perpendicular to foliation and to lineament trends which, in turn, are parallel to faults, major joints, or foliation. Fracture spacing in rocks in the field study area averages 0.5 m for granite and ranges from 0.2 cm to 0.75 m, with an average of 0.15 m, in metamorphic rocks. Diagnostic indications useful for estimating certain construction conditions are shown by point-load and uniaxial compressive strengths. Values for fresh rock range from less than 30 MN/m 2 for weakly bonded phyllite to more than 350 MN/m 2 for dense andesite and metasiltstone. Rock workability is directly related to compressive strength and spacing of joints.

Open-File Report

Estimated permeabilities for soils in the Sacramento Valley, California

Analysis of engineering and hydrologic data from 15 previous soil studies, analysis of particle-size distribution, and analysis of descriptions of soil profiles show that 50 percent of the Sacramento Valley area has soils having permeabilities characterized by infiltration rates of less than 2 feet per day (0.6 meter per day). Consolidated barriers that could impede vertical flow were found in 30 percent of the area.

California

Continuous hydrologic simulation and flood-frequency, hydraulic, and flood-hazard analysis of the Blackberry Creek watershed, Kane County, Illinois

Results of hydrologic model, flood-frequency, hydraulic model, and flood-hazard analysis of the Blackberry Creek watershed in Kane County, Illinois, indicate that the 100-year and 500-year flood plains range from approximately 25 acres in the tributary F watershed (a headwater subbasin at the northeastern corner of the watershed) to almost 1,800 acres in Blackberry Creek main stem. Based on 1996 land-cover data, most of the land in the 100-year and 500-year flood plains was cropland, forested and wooded land, and grassland. A relatively small percentage of urban land was in the flood plains. The Blackberry Creek watershed has undergone rapid urbanization in recent decades. The population and urbanized lands in the watershed are projected to double from the 1990 condition by 2020. Recently, flood-induced damage has occurred more frequently in urbanized areas of the watershed. There are concerns about the effect of urbanization on flood peaks and volumes, future flood-mitigation plans, and potential effects on the water quality and stream habitats. This report describes the procedures used in developing the hydrologic models, estimating the flood-peak discharge magnitudes and recurrence intervals for flood-hazard analysis, developing the hydraulic model, and the results of the analysis in graphical and tabular form. The hydrologic model, Hydrological Simulation Program-FORTRAN (HSPF), was used to perform the simulation of continuous water movements through various patterns of land uses in the watershed. Flood-frequency analysis was applied to an annual maximum series to determine flood quantiles in subbasins for flood-hazard analysis. The Hydrologic Engineering Center-River Analysis System (HEC-RAS) hydraulic model was used to determine the 100-year and 500-year flood elevations, and to determine the 100-year floodway. The hydraulic model was calibrated and verified using high water marks and observed inundation maps for the July 17-18, 1996, flood event. Digital maps of the 100-year and 500-year flood plains and the 100-year floodway for each tributary and the main stem of Blackberry Creek were compiled.

Scientific Investigations Report

Broadening benefits and anticipating tradeoffs with a proposed ecosystem service analysis framework for the US Army Corps of Engineers

Would-be adopters of ecosystem service analysis frameworks might ask, ‘Do such frameworks improve ecosystem service provision or social benefits sufficiently to compensate for any extra effort?’ Here we explore that question by retrospectively applying an ecosystem goods and services (EGS) analysis framework to a large river restoration case study conducted by the US Army Corps of Engineers (USACE) and comparing potential time costs and outcomes of traditional versus EGS-informed planning. USACE analytic methods can have a large influence on which river and wetland restoration projects are implemented in the United States because they affect which projects or project elements are eligible for federal cost-share funding. A new framework is designed for the USACE and is primarily distinguished from current procedures by adding explicit steps to document and compare tradeoffs and complementarity among all affected EGS, rather than the subset that falls within project purposes. Further, it applies economic concepts to transform ecological performance indicators into social benefit indicators, even if changes cannot be valued. We conclude that, for large multi-partner restoration projects like our case study, using the framework provides novel information on social outcomes that could be used to enhance project design, without substantially increasing scoping costs. The primary benefits of using the framework in the case study appeared to stem from early comprehensive identification of stakeholder interests that might have prevented project delays late in the process, and improving the communication of social benefits and how tradeoffs among EGS benefits were weighed during planning.

Missouri

Locating CVBEM collocation points for steady state heat transfer problems

The Complex Variable Boundary Element Method or CVBEM provides a highly accurate means of developing numerical solutions to steady state two-dimensional heat transfer problems. The numerical approach exactly solves the Laplace equation and satisfies the boundary conditions at specified points on the boundary by means of collocation. The accuracy of the approximation depends upon the nodal point distribution specified by the numerical analyst. In order to develop subsequent, refined approximation functions, four techniques for selecting additional collocation points are presented. The techniques are compared as to the governing theory, representation of the error of approximation on the problem boundary, the computational costs, and the ease of use by the numerical analyst.

Engineering Analysis

Practical guidelines to select and scale earthquake records for nonlinear response history analysis of structures

Earthquake engineering practice is increasingly using nonlinear response history analysis (RHA) to demonstrate performance of structures. This rigorous method of analysis requires selection and scaling of ground motions appropriate to design hazard levels. Presented herein is a modal-pushover-based scaling (MPS) method to scale ground motions for use in nonlinear RHA of buildings and bridges. In the MPS method, the ground motions are scaled to match (to a specified tolerance) a target value of the inelastic deformation of the first-'mode' inelastic single-degree-of-freedom (SDF) system whose properties are determined by first-'mode' pushover analysis. Appropriate for first-?mode? dominated structures, this approach is extended for structures with significant contributions of higher modes by considering elastic deformation of second-'mode' SDF system in selecting a subset of the scaled ground motions. Based on results presented for two bridges, covering single- and multi-span 'ordinary standard' bridge types, and six buildings, covering low-, mid-, and tall building types in California, the accuracy and efficiency of the MPS procedure are established and its superiority over the ASCE/SEI 7-05 scaling procedure is demonstrated.

Open-File Report

Estimated Flood Discharges and Map of Flood-Inundated Areas for Omaha Creek, near Homer, Nebraska, 2005

Repeated flooding of Omaha Creek has caused damage in the Village of Homer. Long-term degradation and bridge scouring have changed substantially the channel characteristics of Omaha Creek. Flood-plain managers, planners, homeowners, and others rely on maps to identify areas at risk of being inundated. To identify areas at risk for inundation by a flood having a 1-percent annual probability, maps were created using topographic data and water-surface elevations resulting from hydrologic and hydraulic analyses. The hydrologic analysis for the Omaha Creek study area was performed using historical peak flows obtained from the U.S. Geological Survey streamflow gage (station number 06601000). Flood frequency and magnitude were estimated using the PEAKFQ Log-Pearson Type III analysis software. The U.S. Army Corps of Engineers' Hydrologic Engineering Center River Analysis System, version 3.1.3, software was used to simulate the water-surface elevation for flood events. The calibrated model was used to compute streamflow-gage stages and inundation elevations for the discharges corresponding to floods of selected probabilities. Results of the hydrologic and hydraulic analyses indicated that flood inundation elevations are substantially lower than from a previous study.

Scientific Investigations Report

Using sensitivity analysis in model calibration efforts

In models of natural and engineered systems, sensitivity analysis can be used to assess relations among system state observations, model parameters, and model predictions. The model itself links these three entities, and model sensitivities can be used to quantify the links. Sensitivities are defined as the derivatives of simulated quantities (such as simulated equivalents of observations, or model predictions) with respect to model parameters. We present four measures calculated from model sensitivities that quantify the observation-parameter-prediction links and that are especially useful during the calibration and prediction phases of modeling. These four measures are composite scaled sensitivities (CSS), prediction scaled sensitivities (PSS), the value of improved information (VOII) statistic, and the observation prediction (OPR) statistic. These measures can be used to help guide initial calibration of models, collection of field data beneficial to model predictions, and recalibration of models updated with new field information. Once model sensitivities have been calculated, each of the four measures requires minimal computational effort. We apply the four measures to a three-layer MODFLOW-2000 (Harbaugh et al., 2000; Hill et al., 2000) model of the Death Valley regional ground-water flow system (DVRFS), located in southern Nevada and California. D’Agnese et al. (1997, 1999) developed and calibrated the model using nonlinear regression methods. Figure 1 shows some of the observations, parameters, and predictions for the DVRFS model. Observed quantities include hydraulic heads and spring flows. The 23 defined model parameters include hydraulic conductivities, vertical anisotropies, recharge rates, evapotranspiration rates, and pumpage. Predictions of interest for this regional-scale model are advective transport paths from potential contamination sites underlying the Nevada Test Site and Yucca Mountain.

California, Nevada