Level II scour analysis for Bridge 46 (CHELTH00680046) on Town Highway 68, crossing the First Branch of the White River, Chelsea, Vermont

Abstract

This report provides the results of a detailed Level II analysis of scour potential at structure CHELTH00680046 on town highway 68 crossing the First Branch of the White River, Chelsea, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province of central Vermont in the town of Chelsea. The 58.2-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the banks have dense woody vegetation coverage. In the study area, the First Branch of the White River has a sinuous channel with a slope of approximately 0.0054 ft/ft, an average channel top width of 92 ft and an average channel depth of 4 ft. The predominant channel bed material is gravel and cobble (D 50 is 52.7 mm or 0.173 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 16, 1994, indicated that the reach was stable. The town highway 68 crossing of the First Branch of the White River is a 61-ft-long, onelane covered bridge with a 52-foot clear-span (Vermont Agency of Transportation, written commun., August 26, 1994). The bridge is supported by vertical, stone abutments with a concrete wingwall on the downstream right. The left abutment is laid-up stone supported by concrete at the upstream and downstream ends of the laid-up stone abutment. The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 1.5 ft deeper than the mean thalweg depth was observed under the bridge during the Level I assessment. The scour protection measures in place at the site were type- 2 stone fill (less than 36 inches diameter) at the road approach embankments except the downstream left embankment which had no protection. The upstream right road embankment, impacted by the channel bend, has an extensive covering of stone fill for erosion protection. Type-3 stone fill (less than 48 inches diameter) was noted along the right abutment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.9 to 2.6 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 14.3 to 24.0 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The left abutment sits atop a bedrock outcrop. The results of the calculated scour depths will be limited by the bedrock. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Explore related subjects

90° N90° S · 180° W ← longitude → 180° E
Source-reported bounding extent: 43.875° to 44° latitude; -72.5° to -72.375° longitude. This indicates report coverage, not an exact sampling location. View area on OpenStreetMap.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Michael A. Ivanoff, Donald L. Song. 1996. Level II scour analysis for Bridge 46 (CHELTH00680046) on Town Highway 68, crossing the First Branch of the White River, Chelsea, Vermont. https://doi.org/10.3133/ofr96406

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

ECCOE Landsat quarterly calibration and validation report—Quarter 2, 2026

Executive Summary The U.S. Geological Survey Earth Resources Observation and Science Calibration and Validation (Cal/Val) Center of Excellence (ECCOE) focuses on improving the accuracy, precision, calibration, and product quality of remote-sensing data, leveraging years of multiscale optical system geometric and radiometric calibration and characterization experience. The ECCOE Landsat Cal/Val Team continually monitors the geometric and radiometric performance of active Landsat missions and makes calibration adjustments, as needed, to maintain data quality at the highest level. This report provides observed geometric and radiometric analysis results for Landsats 8 and 9 for quarter 2 (April–June), 2026. All data used to compile the Cal/Val analysis results presented in this report are freely available from the U.S. Geological Survey EarthExplorer website: https://earthexplorer.usgs.gov.

Open-File Report↗

ECCOE Landsat quarterly calibration and validation report—Quarter 1, 2026

Executive Summary The U.S. Geological Survey Earth Resources Observation and Science Calibration and Validation (Cal/Val) Center of Excellence (ECCOE) focuses on improving the accuracy, precision, calibration, and product quality of remote-sensing data, leveraging years of multiscale optical system geometric and radiometric calibration and characterization experience. The ECCOE Landsat Cal/Val Team continually monitors the geometric and radiometric performance of active Landsat missions and makes calibration adjustments, as needed, to maintain data quality at the highest level. This report provides observed geometric and radiometric analysis results for Landsats 8 and 9 for quarter 1 (January–March) of 2026. All data used to compile the Cal/Val analysis results presented in this report are freely available from the U.S. Geological Survey EarthExplorer website: https://earthexplorer.usgs.gov . One specific activity that the ECCOE Landsat Cal/Val Team closely monitored was a Landsat 8 Thermal Infrared Sensor encoder alerts anomaly. On March 18, 2026, the Thermal Infrared Sensor instrument’s mechanism control electronics board reset, driving several parameters to default power-on values. Subsequent telemetry and analysis determined that no persistent hardware misconfiguration was present and no radiometric or geometric degradation was observed.

Open-File Report↗

Floods of June 20–July 6, 2024, in the Big Sioux River, Rock River, Little Sioux River, Ocheyedan River, and Floyd River Basins, northwestern Iowa

Major flooding occurred on June 20–July 6, 2024, in northwestern Iowa affecting the Big Sioux, Rock, Little Sioux, Ocheyedan, and Floyd River Basins. Heavy rain fell in northwestern Iowa, southwestern Minnesota, and southeastern South Dakota on June 20–22, 2024. Parts of northwestern Iowa recorded 2–6 inches of rainfall and localized amounts exceeding 12 inches. A maximum peak-of-record streamflow of 175,000 cubic feet per second at the U.S. Geological Survey streamgage Big Sioux River at Akron, Iowa (06485500), was recorded on June 22, 2024, and had an annual exceedance probability range of 0.2–0.49 percent. High-water marks were measured at four locations along the Big Sioux River between U.S. Interstate 29 at Sioux City, Iowa, upstream to Iowa Highway 10 north of Hawarden, Iowa, a distance of 75.7 river miles. A maximum peak-of-record streamflow of 157,000 cubic feet per second at the U.S. Geological Survey streamgage Rock River near Rock Valley, Iowa (06483500), was recorded on June 22, 2024, and had an annual exceedance probability of less than 0.2 percent. High-water marks were measured at eight locations along the Rock River between County Road B30 east of Hudson, South Dakota, upstream to Iowa Highway 9 at Rock Rapids, Iowa, a distance of 39.3 river miles. A maximum peak-of-record streamflow of 63,000 cubic feet per second at the U.S. Geological Survey streamgage Little Sioux River at Correctionville, Iowa (06606600), was recorded on June 24, 2024, and had an annual exceedance probability range of 0.2–0.49 percent. High-water marks were measured at 11 locations along the Little Sioux River between Iowa Highway 31 west of Correctionville, Iowa, upstream to U.S. Highway 18 north of Spencer, Iowa, a distance of 134.8 river miles. A maximum streamflow of 24,500 cubic feet per second at the U.S. Geological Survey streamgage Ocheyedan River near Spencer, Iowa (06605000), was recorded on June 22, 2024, and had an annual exceedance probability range of 0.2–0.49 percent. High-water marks were measured at three locations along the Ocheyedan River between County Road M38 west of Spencer, Iowa, upstream to U.S. Highway 18 west of Everly, Iowa, a distance of 12.8 river miles. A maximum streamflow of 41,000 cubic feet per second at the U.S. Geological Survey streamgage Floyd River at Alton, Iowa (06600100), was recorded on June 22, 2024, and had an annual exceedance probability range of 1–1.99 percent. High-water marks were measured at six locations along the Floyd River between Iowa Highway 3 at Le Mars, Iowa, upstream to Iowa Highway 10 at Alton, Iowa, a distance of 27.5 river miles. The high-water marks were used to develop flood profiles for the Big Sioux, Rock, Little Sioux, Ocheyedan, and Floyd Rivers.

Iowa, Minnesota, South Dakota↗