A stream-gaging network analysis for the 7-day, 10-year annual low flow in New Hampshire streams

The 7-day, 10-year (7Q10) low-flow-frequency statistic is a widely used measure of surface-water availability in New Hampshire. Regression equations and basin-characteristic digital data sets were developed to help water-resource managers determine surface-water resources during periods of low flow in New Hampshire streams. These regression equations and data sets were developed to estimate streamflow statistics for the annual and seasonal low-flow-frequency, and period-of-record and seasonal period-of-record flow durations. generalized-least-squares (GLS) regression methods were used to develop the annual 7Q10 low-flow-frequency regression equation from 60 continuous-record stream-gaging stations in New Hampshire and in neighboring States. In the regression equation, the dependent variables were the annual 7Q10 flows at the 60 stream-gaging stations. The independent (or predictor) variables were objectively selected characteristics of the drainage basins that contribute flow to those stations. In contrast to ordinary-least-squares (OLS) regression analysis, GLS-developed estimating equations account for differences in length of record and spatial correlations among the flow-frequency statistics at the various stations. A total of 93 measurable drainage-basin characteristics were candidate independent variables. On the basis of several statistical parameters that were used to evaluate which combination of basin characteristics contribute the most to the predictive power of the equations, three drainage-basin characteristics were determined to be statistically significant predictors of the annual 7Q10: (1) total drainage area, (2) mean summer stream-gaging station precipitation from 1961 to 90, and (3) average mean annual basinwide temperature from 1961 to 1990. To evaluate the effectiveness of the stream-gaging network in providing regional streamflow data for the annual 7Q10, the computer program GLSNET (generalized-least-squares NETwork) was used to analyze the network by application of GLS regression between streamflow and the climatic and basin characteristics of the drainage basin upstream from each stream-gaging station. Improvement to the predictive ability of the regression equations developed for the network analyses is measured by the reduction in the average sampling-error variance, and can be achieved by collecting additional streamflow data at existing stations. The predictive ability of the regression equations is enhanced even further with the addition of new stations to the network. Continued data collection at unregulated stream-gaging stations with less than 14 years of record resulted in the greatest cost-weighted reduction to the average sampling-error variance of the annual 7Q10 regional regression equation. The addition of new stations in basins with underrepresented values for the independent variables of the total drainage area, average mean annual basinwide temperature, or mean summer stream-gaging station precipitation in the annual 7Q10 regression equation yielded a much greater cost-weighted reduction to the average sampling-error variance than when more data were collected at existing unregulated stations. To maximize the regional information obtained from the stream-gaging network for the annual 7Q10, ranking of the streamflow data can be used to determine whether an active station should be continued or if a new or discontinued station should be activated for streamflow data collection. Thus, this network analysis can help determine the costs and benefits of continuing the operation of a particular station or activating a new station at another location to predict the 7Q10 at ungaged stream reaches. The decision to discontinue an existing station or activate a new station, however, must also consider its contribution to other water-resource analyses such as flood management, water quality, or trends in land use or climatic change.

Water-Resources Investigations Report↗

Level II scour analysis for Bridge 33 (WWINTH00300033) on Town Highway 30, crossing Mill Brook, West Windsor, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WWINTH00300033 on Town Highway 30 crossing Mill Brook, West Windsor, Vermont (Figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the New England Upland section of the New England physiographic province in east-central Vermont. The 24.9-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream of the bridge while the immediate banks have dense woody vegetation. Downstream of the bridge is forested. In the study area, Mill Brook has an incised, sinuous channel with a slope of approximately 0.004 ft/ft, an average channel top width of 58 ft and an average bank height of 5 ft. The channel bed material ranges from sand to boulder with a median grain size (D 50 ) of 65.7 mm (0.215 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 5, 1996, indicated that the reach was stable. The Town Highway 30 crossing of the Mill Brook is a 46-ft-long, one-lane covered bridge consisting of a 40-foot wood-beam span (Vermont Agency of Transportation, written communication, March 23, 1995). The opening length of the structure parallel to the bridge face is 36.3 ft. The bridge is supported by vertical, concrete capped laid-up stone abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is zero degrees. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the upstream right bank, the upstream right wingwall, the right abutment and the downstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was analyzed since it had the potential of being the worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.1 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 6.0 to 16.0 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 46 (FFIETH00470046) on Town Highway 47, crossing Black Creek, Fairfield, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure FFIETH00470046 on Town Highway 47 crossing Black Creek, Fairfield, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gathered from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Green Mountain section of the New England physiographic province in northwestern Vermont. The 37.8 mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream and downstream of the bridge while the immediate banks have dense woody vegetation. In the study area, Black Creek has a meandering channel with a slope of approximately 0.0005 ft/ft, an average channel top width of 51 ft and an average bank height of 6 ft. The channel bed material ranges from sand to bedrock with a median grain size (D 50 ) of 0.189 mm (0.00062 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 12, 1995, indicated that the reach was stable. The Town Highway 47 crossing of Black Creek is a 35-ft-long, one-lane bridge consisting of one 31-ft steel-stringer span (Vermont Agency of Transportation, written communication, March 8, 1995). The opening length of the structure parallel to the bridge face is 28.0 ft. The bridge is supported by vertical, laid-up stone abutments with wingwalls. The channel is skewed approximately zero degrees to the opening and the opening-skew-toroadway is zero degrees. A scour hole 6.0 ft deeper than the mean thalweg depth was observed just downstream of the bridge during the Level I assessment. Scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) along the left abutment. Type-2 stone fill (less than 36 inches diameter) extended along the upstream left and right banks, the upstream left and right wingwalls, the downstream left wingwall, and the downstream left bank. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.4 to 8.2 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 5.8 to 15.6 ft. At the left abutment, the worst-case abutment scour occurred at the 100-year discharge, and at the right abutment the worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results.” Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 92 (WSTOVT01000092) on State Highway 100, crossing the West River, Weston, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WSTOVT01000092 on Vermont Highway 100 crossing the West River, Weston, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in south-central Vermont. The 32.7-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover upstream of the bridge is primarily forest with pasture on the upstream left overbank. Upstream and downstream, the immediate banks have brush and dense forest cover. Downstream of the bridge is forested. In the study area, the West River has an incised, sinuous channel with a slope of approximately 0.006 ft/ft, an average channel top width of 111 ft and an average channel depth of 3 ft. The predominant channel bed material is very coarse gravel and cobbles with a median grain size (D 50 ) of 67.7 mm (0.222 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 19, 1996 indicated that the reach was laterally unstable based on the fine bank material, sinuosity of the stream, point bars and cutbanks. The state highway 100 crossing of the West River is a 113-ft-long, two-lane bridge consisting of one 110-foot steel-beam span (Vermont Agency of Transportation, written communication, March 31, 1995). The bridge is supported by vertical, concrete abutments without wingwalls. The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 25 degrees. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the entire base length of the left and right abutments. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.4 to 2.1 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 8.4 to 30.7 ft. The worst-case abutment scour occurred at the 500-year discharge along the left abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 125 (MIDBUS00070125) on U.S. Route 7 crossing the Middlebury River, Middlebury, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure MIDBUS00070125 on U.S. Route 7 crossing the Middlebury River, Middlebury, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in west-central Vermont. The 46.8-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover consists of row crops on the right overbank upstream and downstream, and trees on the left overbank. In the study area, the Middlebury River has a straight channel with a slope of approximately 0.005 ft/ft, an average channel top width of 77 ft and an average channel depth of 4 ft. The predominant channel bed materials are sand and cobbles with a median grain size (D 50 ) of 59.4 mm (0.195 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 18, 1996, indicated that the reach was stable. The U.S. Route 7 crossing of the Middlebury River is a 202-ft-long, two-lane bridge consisting of one 91-foot, and two 55-foot steel-beam spans (Vermont Agency of Transportation, written communication, December 14, 1995). The bridge is supported by vertical, concrete abutment walls with spill-through embankments. The channel is skewed approximately 45 degrees to the opening while the opening-skew-to-roadway is 45 degrees. The scour protection measures at the site were type-2 stone fill (less than 36 inches diameter) on the spill-through embankments of each abutment and type-1 stone fill (less than 12 inches diameter) on the right bank upstream. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.2 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 7.5 to 11.0 ft. The worst-case abutment scour occurred at the 500-year discharge at the left abutment. Pier scour ranged from 8.3 to 15.9 ft. for each modeled discharge. The worst-case pier scour occurred at the 500-year discharge. In this report, piers are numerically designated “1” and “2” for the left and right piers respectively. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 13 (PFRDTH00030013) on Town Highway 3, crossing Furnace Brook, Pittsford, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure PFRDTH00030013 on Town Highway 3 crossing Furnace Brook, Pittsford, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Taconic section of the New England physiographic province in western Vermont. The 17.1-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is grass along the downstream right bank while the remaining banks are primarily forested. In the study area, Furnace Brook has an incised, sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 49 ft and an average channel depth of 4 ft. The predominant channel bed material ranges from gravel to bedrock with a median grain size (D 50 ) of 70.2 mm (0.230 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 20, 1995, indicated that the reach was stable. The Town Highway 3 crossing of Furnace Brook is a 75-ft-long, two-lane bridge consisting of one 72-ft-long steel stringer span (Vermont Agency of Transportation, written communication, March 14, 1995). The bridge is supported by vertical, concrete abutments with spill-through slopes. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is 35 degrees. The opening-skew-to-roadway was determined from surveyed data collected at the bridge although, information provided from the VTAOT files, indicates that the opening-skew-to-roadway is 30 degrees (Appendix D). The scour protection measures at the site included type-2 stone fill (less than 36 inches diameter) on the spill-through slope along each abutment. Type-2 stone fill scour protection was also found along the upstream left wingwall and downstream right wingwall. Type-1 (less than 12 inches diameter) stone fill scour protection was found along the upstream right wingwall and downstream left wingwall. No bank protection was observed downstream or upstream. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.2 to 2.0 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 7.8 to 13.1 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution although, bedrock outcropping is apparent both upstream and downstream of this bridge. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 49 (WALLVT01030049) on State Highway 103, crossing Freeman Brook, Wallingford, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WALLVT01030049 on State Highway 103 crossing Freeman Brook, Wallingford, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in south-central Vermont. The 11.7-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture with trees and brush on the immediate banks except for the upstream left overbank which is tree covered. A levee composed of stone fill was constructed along the upstream left bank in order to keep flow from reaching the flood plain left (south) of the brook. In the study area, Freeman Brook has an incised, straight channel with a slope of approximately 0.02 ft/ft, an average channel top width of 56 ft and an average channel depth of 6 ft. The predominant channel bed materials are gravel and cobbles with a median grain size (D 50 ) of 62.9 mm (0.206 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 10, 1995, indicated that the reach was stable. The State Highway 103 crossing of the Freeman Brook is a 54-ft-long, two-lane bridge consisting of one 50-foot concrete T-beam span (Vermont Agency of Transportation, written communication, March 15, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 25 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 0.5 ft deeper than the mean thalweg depth was observed along the downstream end of the left abutment and downstream left wingwall during the Level I assessment. The scour protection measures at the site included type-2 stone fill (less than 36 inches diameter) along the entire base length of the upstream left and downstream right wingwall and type-1 stone fill (less than 12 inches diameter) along the upstream end of the upstream right wingwall. Type-4 stone fill (less than 60 inches diameter) was found along the upstream left and right banks. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.4 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 7.6 to 21.4 ft. The worst-case abutment scour was predicted at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 12 (SUNDFLR0030012) on Forest Land Road 3, crossing Roaring Branch Brook, Sunderland, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure SUNDFLR0030012 on Forest Land Road (FLR) 3 (FAS 114) crossing Roaring Branch Brook, Sunderland, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in southwestern Vermont. The 4.93-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is dense forest along the left bank and primarily shrubs and trees along the right bank, both upstream and downstream of the bridge. In the study area, Roaring Branch Brook has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 33 ft and an average bank height of 4 ft. The channel bed material ranges from cobble to bedrock with a median grain size (D 50 ) of 139 mm (0.457 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 30, 1996, indicated that the reach was stable. Forest Land Road 3 (FAS 114) crossing of Roaring Branch Brook is a 37-ft-long, two-lane bridge consisting of one 35-foot steel-beam span (Vermont Agency of Transportation, written communication, December 14, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 30 degrees to the opening while the opening-skew-to-roadway is 15 degrees. The scour protection measures at the site included type-3 stone fill (less than 48 inches diameter) along the left and right abutments, along the upstream left and downstream right wing walls and along the downstream right bank. Type-4 (less than 60 inches diameter) stone fill was found along the upstream right and downstream left wingwalls and along the downstream left bank. Type-2 (less than 36 inches diameter) stone fill scour protection was found along the upstream left and right banks. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was calculated to be 0.0 ft. Abutment scour ranged from 4.3 to 10.4 ft. The worst-case abutment scour occurred at the 500-year discharge along the right abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 7 (ANDOTH00010007) on Town Highway 1, crossing Andover Brook, Andover, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure ANDOTH00010007 on Town Highway 1 crossing Andover Branch, Andover, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in southern Vermont. The 7.21-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream of the bridge while the immediate banks have dense woody vegetation. Downstream of the bridge, the banks and overbanks are forested. In the study area, Andover Branch has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 45 ft and an average bank height of 5 ft. The channel bed material ranges from gravel to boulder with a median grain size (D 50 ) of 58.0 mm (0.19 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 28, 1996, indicated that the reach was laterally unstable due to evidence of lateral movement of the channel 200 feet upstream along the left bank and near the bridge along the right bank. The Town Highway 1 crossing of Andover Branch is a 32-ft-long, two-lane bridge consisting of one 29-foot concrete slab span (Vermont Agency of Transportation, written communication, March 28, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is 0 degrees. The scour protection measures at the site included type-2 stone fill (less than 36 inches diameter) along the entire base length of the upstream wingwalls and type-3 stone fill (less than 48 inches diameter) along the entire base length of the downstream wingwalls and the right abutment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.6 ft. The worst-case contraction scour occurred at the 100-year discharge. Abutment scour ranged from 7.1 to 10.7 ft at the right abutment with the worst-case abutment scour occurring at the 500-year discharge. Abutment scour ranged from 7.5 to 8.3 ft at the left abutment with the worst-case abutment scour occurring at the incipient road overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 6 (STAMVT01000006) on State Route 100, crossing the North Branch of the Hoosic River, Stamford, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure STAMVT01000006 on Vermont Highway 100 crossing the North Branch of the Hoosic River, Stamford, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in southern Vermont. The 8.61-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is grass with forest along the immediate banks throughout the reach. In the study area, the North Branch of the Hoosic River has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 44 ft and an average bank height of 4 ft. The channel bed material ranges from sand to boulder with a median grain size (D 50 ) of 97.4 mm (0.320 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 31, 1996, indicated that the reach was stable. The Vermont Highway 100 crossing of the North Branch of the Hoosic River is a 99-ft-long, two-lane bridge consisting of one 97-foot steel-beam span (Vermont Agency of Transportation, written communication, September 28, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 60 degrees to the opening and the opening-skew-to-roadway is also 60 degrees. The scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) along the downstream left bank. Type-2 (less than 36 inches diameter) stone fill was found along the upstream left bank and the downsteam right bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.7 to 2.1 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 18.8 to 19.7 ft along the right abutment and from 2.8 to 6.8 ft along the left abutment. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 12 (CHESVT01030012) on State Highway 103, crossing the Williams River, Chester, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure CHESVT01030012 on State Route 103 crossing the Williams River, Chester, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in eastern Vermont. The 23.9-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture on the downstream right and upstream left overbank areas and short grass on the downstream left and upstream right overbank areas. The surface cover along the upstream and downstream immediate banks consists of trees and brush. In the study area, the the Williams River has an incised, sinuous channel with a slope of approximately 0.0054 ft/ft, an average channel top width of 75 ft and an average bank height of 4 ft. The predominant channel bed material is gravel with a median grain size (D 50 ) of 52.4 mm (0.172 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 18, 1996, indicated that the reach was laterally unstable. The State Route 103 crossing of the Williams River is a 99-ft-long, two-lane bridge consisting of three concrete T-beam spans (Vermont Agency of Transportation, written communication, March 29, 1995). The bridge is supported by two piers and vertical, concrete abutments with wingwalls and spill-through slopes. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is 0 degrees. Downstream of the bridge are the remains of a dam which is acting as a drop structure. A scour hole, approximately 3 ft deeper than the mean thalweg depth, was observed along the upstream left bank extending from 78 ft upstream of the upstream bridge face to 25 ft downstream of the downstream bridge face during the Level I assessment. Lateral migration of the channel has resulted in flow being directed at an angle to the piers, which has resulted in increased local scour at the bridge. The scour protection measures at the site included type-2 stone fill (less than 36 inches diameter) under the bridge along the entire base length of the left and right spill-through slopes and extending up to the abutments. Type-2 stone fill (less than 36 inches diameter) scour protection was also found along the upstream left bank from the bridge to 46 ft upstream and along the downstream right bank from the bridge to 70 ft downstream. Rock walls were found along the left bank from 88 ft to 200 ft downstream and along the right bank from 124 ft to 224 ft downstream. There are two wood pile drop structures located at 47 ft and 61 ft downstream of the bridge. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.2 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 4.0 to 12.4 ft along the right spill-through abutment and from 8.4 to 10.7 ft along the left spill- through abutment. The worst-case abutment scour occurred at the 500-year discharge. Pier scour ranged from 7.1 to 8.9 ft along Pier 1 ( northerly pier) and from 13.5 to 17.1 ft along Pier 2 (southerly pier). The worst case pier scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured -streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 25 (ANDOTH00230025) on Town Highway 23, crossing Andover Branch, Andover, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure ANDOTH00230025 on Town Highway 23 crossing the Andover Branch, Andover, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in south-central Vermont. The 6.74-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture on the right overbank and forest on the left overbank while the immediate banks, both upstream and downstream, are forested. In the study area, the Andover Branch has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 55 ft and an average bank height of 9 ft. The channel bed material ranges from gravel to boulder with a median grain size (D 50 ) of 78.4 mm (0.257 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 27, 1996, indicated that the reach was stable. The Town Highway 23 crossing of the Andover Branch is a 25-ft-long, two-lane structure consisting of a multi-plate corrugated steel arch culvert with concrete footings (Vermont Agency of Transportation, written communication, March 29, 1995). The culvert is mitered at the inlet and outlet. The channel is skewed approximately zero degrees to the opening while the opening-skew-to-roadway is zero degrees. The footings are exposed approximately 1.25 ft, with the exception of the downstream end of the right footing which is exposed approximately 0.5 ft. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the upstream left bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for modelled flows ranged from 1.6 to 2.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 10.0 to 11.7 ft along the left footing and from 11.8 to 16.7 along the right footing. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A crosssection of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 8 (ANDOTH00010008) on Town Highway 1, crossing Andover Branch, Andover, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure ANDOTH00010008 on Town Highway 1 crossing the Andover Branch, Andover , Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in south-central Vermont. The 5.30-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover along the immediate banks, both upstream and downstream of the bridge, is grass while farther upstream and downstream, the surface cover is primarily forest. In the study area, the Andover Branch has an incised, straight channel with a slope of approximately 0.01 ft/ft, an average channel top width of 35 ft and an average bank height of 3 ft. The channel bed material ranges from gravel to boulder with a median grain size (D 50 ) of 63.6 mm (0.209 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 27, 1996, indicated that the reach was stable. The Town Highway 1 crossing of the Andover Branch is a 54-ft-long, two-lane bridge consisting of one 51-foot steel-beam span (Vermont Agency of Transportation, written communication, March 28, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 45 degrees to the opening while the opening-skew-to-roadway is 30 degrees. A scour hole 0.7 ft deeper than the mean thalweg depth was observed approximately 52 feet downstream of the downstream face of the bridge during the Level I assessment. Scour countermeasures at the site include type-2 stone fill (less than 36 inches diameter) along the entire base length of the left and right abutments and along the left bank from 65 ft to 89 ft upstream. Type-1 stone fill was found along the right bank from the bridge to 47 ft upstream and along the left bank from 40 ft to 65 ft upstream. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.1 ft. The worst case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 5.0 to 8.1 ft along the left abutment and from 2.1 to 4.6 ft along the right abutment. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 63 (CHESTH00090063) on Town Highway 9, crossing the Williams River, Chester, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure CHESTH00090063 on Town Highway 9 crossing the Williams River, Chester, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in eastern Vermont. The 24.0-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is grass with trees and brush along the immediate banks. In the study area, the the Williams River has an incised, sinuous channel with a slope of approximately 0.005 ft/ft, an average channel top width of 64 ft and an average bank height of 6 ft. The channel bed material ranges from gravel to boulder with a median grain size (D 50 ) of 57.7 mm (0.189 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 18, 1996, indicated that the reach was stable. The Town Highway 9 crossing of the Williams River is a 45-ft-long, two-lane bridge consisting of one 35-foot steel-beam span with a timber deck (Vermont Agency of Transportation, written communication, April 6, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 5 degrees to the opening while the opening-skew-to-roadway is 0 degrees. A scour hole 1.8 ft deeper than the mean thalweg depth was observed along the left abutment during the Level I assessment. The scour hole undermines the left abutment and extends from 50 ft upstream of the upstream bridge face to 50 ft downstream of the downstream bridge face. The scour protection measures at the site included type-3 stone fill (less than 48 inches diameter) under the bridge along the entire base length of the right abutment and along the right bank from 50 to 88 ft upstream. Type-2 (less than 36 inches diameter) stone fill scour protection was observed along the downstream left bank from 18 ft to 115 ft, along the downstream right bank from 8 ft to 25 ft and along the upstream left bank from 50 to 75 ft. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was computed to be 0.0 ft. Abutment scour ranged from 10.1 ft to 11.0 ft along the left abutment and from 14.1 ft to 15.1 ft along the right abutment. The worst-case abutment scour for the left abutment occurred at the 500-year discharge while the worst-case abutment scour for the right abutment occurred at the 100- year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 48 (FFIETH00300048) on Town Highway 30, crossing Wanzer Brook, Fairfield, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure FFIETH00300048 on Town Highway 30 crossing Wanzer Brook, Fairfield, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in northwestern Vermont. The 6.78-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover upstream of the bridge and on the downstream right bank is primarily pasture. The downstream left bank is forested. In the study area, Wanzer Brook has an incised, straight channel with a slope of approximately 0.03 ft/ft, an average channel top width of 65 ft and an average bank height of 5 ft. The channel bed material is cobble with a median grain size (D 50 ) of 111 mm (0.364 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 11, 1995, indicated that the reach was stable. The Town Highway 30 crossing of Wanzer Brook is a 31-ft-long, two-lane bridge consisting of one 28-foot steel-beam span (Vermont Agency of Transportation, written communication, March 8, 1995). The opening length of the structure parallel to the bridge face is 26 ft.The bridge is supported by vertical stone wall abutments with concrete caps and “kneewall” footings. The channel is skewed approximately 25 degrees to the opening while the measured opening-skew-to-roadway is 20 degrees. A scour hole 1.5 ft deeper than the mean thalweg depth was observed along the downstream left retaining wall (extended concrete footing) during the Level I assessment. It was also observed that the right abutment is undermined with a scour depth of 0.5 ft. The scour protection at the site was limited to four large boulders (type-4, less than 60 inches diameter) along the downstream right retaining wall. The channel under the bridge is a “corduroy” log mat floor composed of 13 logs which are parallel to the bridge face and extend from 5 ft under the bridge to the downstream bridge face. The most downstream log is approximately 0.3 to 0.4 ft higher than the other logs and controls flow at lower flows. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.3 to 0.6 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 14.1 to 16.0 ft at the left abutment and from 6.8 to 7.6 ft at the right abutment. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 29 (HUNTTH00290029) on Town Highway 29, crossing Cobb Brook, Huntington, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure HUNTTH00290029 on Town Highway 29 crossing Cobb Brook, Huntington, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in northwestern Vermont. The 4.16-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest upstream and downstream of the bridge. In the study area, Cobb Brook has an incised, straight channel with a slope of approximately 0.024 ft/ft, an average channel top width of 53 ft and an average bank height of 4 ft. The channel bed material ranges from gravel to bedrock with a median grain size (D 50 ) of 112.0 mm (0.367 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 25, 1996, indicated that the reach was stable. The Town Highway 29 crossing of Cobb Brook is a 36-ft-long, one-lane bridge consisting of one 30-foot steel-beam span (Vermont Agency of Transportation, written communication, December 11, 1995) and a wooden deck. The opening length of the structure parallel to the bridge face is 27 ft.The bridge is supported by vertical, concrete abutments. The channel is skewed approximately 25 degrees to the opening while the opening-skew-to-roadway was measured to be 20 degrees. VTAOT records indicate an opening-skew-to-roadway of zero degrees. A scour hole 1.5 ft deeper than the mean thalweg depth was observed extending from 12 ft upstream of the upstream end of the left abutment to 10 ft under the bridge in the center of the channel during the Level I assessment. Another scour hole approximately 1.2 ft deeper than the mean thalweg depth was observed along the downstream end of the right abutment during the Level I assessment. The scour protection measures at the site included type-2 stone fill (less than 36 inches diameter) along the upstream end of the right abutment and type-3 stone fill (less than 48 inches diameter) along the upstream end of the upstream left retaining wall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was computed to be zero ft. Abutment scour ranged from 9.9 to 12.5 ft along the left abutment and from 6.2 to 8.6 ft along the right abutment. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 25 (REDSTH00360025) on Town Highway 36, crossing the West Branch Deerfield River, Readsboro, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure REDSTH00360025 on Town Highway 36 crossing the West Branch Deerfield River, Readsboro, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in south-central Vermont. The 14.5-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture on the upstream right bank and forest on the upstream left bank. The surface cover on the downstream right and left banks is primarily grass, shrubs and brush. In the study area, the West Branch Deerfield River has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 65 ft and an average bank height of 4 ft. The channel bed material ranges from gravel to boulders, with a median grain size (D 50 ) of 117 mm (0.383 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 1, 1996, indicated that the reach was stable. The Town Highway 36 crossing of the West Branch Deerfield River is a 59-ft-long, two-lane bridge consisting of one 57-foot concrete T-beam span (Vermont Agency of Transportation, written communication, September 28, 1995). The opening length of the structure parallel to the bridge face is 54 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 50 degrees to the opening while the opening-skew-to-roadway is 30 degrees. During the Level I assessment, a scour hole approximately 2 ft deeper than the mean thalweg depth was observed along the upstream right wingwall and a scour hole approximately 1 ft deeper than the mean thalweg depth was observed along the downstream left wingwall. The scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) at the downstream end of the downstream left wingwall, at the upstream end of the upstream right wingwall, at the downstream end of the right abutment, along the entire base length of the downstream right wingwall, along the upstream right bank and along the downstream left bank. A stone wall was noted along the upstream left bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.6 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge. Abutment scour ranged from 15.1 to 16.3 ft along the left abutment and from 7.4 to 9.2 ft along the right abutment. The worst-case abutment scour occurred at the incipient-overtopping and 500-year discharges for the left abutment and at the 500-year discharge for the right abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 31 (HUNTTH00220031) on Town Highway 22, crossing Brush Brook, Huntington, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure HUNTTH00220031 on Town Highway 22 crossing Brush Brook, Huntington, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, obtained from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in west-central Vermont. The 5.01-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover consists of trees and brush. In the study area, Brush Brook has an incised, straight channel with a slope of approximately 0.06 ft/ft, an average channel top width of 44 ft and an average bank height of 4 ft. The channel bed material ranges from boulder to gravel with a median grain size (D 50 ) of 107.0 mm (0.352 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 25, 1996, indicated that the reach was stable. The Town Highway 22 crossing of Brush Brook is a 34-ft-long, one-lane bridge consisting of one 30-foot steel I-beam span (Vermont Agency of Transportation, written communication, November 30, 1995). The opening length of the structure parallel to the bridge face is 31.2 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 15 degrees to the opening while the computed opening-skew-to-roadway is 10 degrees. The VTAOT computed opening-skewto-roadway is 2 degrees. A scour hole 1.0 ft deeper than the mean thalweg depth was observed at the downstream end of the left abutment during the Level I assessment. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the upstream right bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was computed to be zero ft. Abutment scour ranged from 7.0 to 10.5 ft. The worst-case abutment scour occurred at the 500-year discharge for the left abutment and at the incipient-overtopping discharge for the right abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.