Search USGS⌕ Search

SEARCH · Search USGS

Results for “Monitoring and Response Plan”

Search indexed USGS publications on groundwater, aquifers, geologic maps, mineral resources and earthquakes. Explore source records by subject and place.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 recordsLinked to original sources

Monitoring plan for vegetation responses to elk management in Rocky Mountain National Park

Rocky Mountain National Park (RMNP) in north-central Colorado supports numerous species of wildlife, including several large ungulate species among which Rocky Mountain elk (Cervus elaphus) are the most abundant. Elk are native to RMNP but were extirpated from the area by the late 1800s. They were reintroduced to the area in 1913-1914, and the elk herd grew to the point that it was actively managed from 1944 until 1968. In 1969, the active control of elk was discontinued and since then the herd has increased to a high point ranging from 2,800 to 3,500 between 1997 and 2001. In recent years, there has been growing concern over the condition of vegetation in the park and conflicts between elk and humans, both inside and outside the park. In response to these concerns, RMNP implemented an Elk and Vegetation Management Plan (EVMP) in 2009 to guide management actions in the park over a 20-year time period with the goal of reducing the impacts of elk on vegetation and restoring the natural range of variability in the elk population and affected plant and animal communities. The EVMP outlines the desired future condition for three vegetation communities where the majority of elk herbivory impacts are being observed: aspen, montane riparian willow, and upland herbaceous communities. The EVMP incorporates the principle of adaptive management whereby the effectiveness of management actions is assessed and adjusted as needed to successfully achieve objectives. Determination of whether vegetation objectives are being achieved requires monitoring and evaluation of target vegetation communities. The current report describes the design and implementation of a vegetation-monitoring program to help RMNP managers assess the effectiveness of their management actions and determine when and where to alter actions to achieve the EVMP's vegetation objectives. This monitoring plan details the process of selecting variables to be monitored, overall sampling design and structure, site selection, data collection methods, and statistical analyses to be used to conduct this monitoring program in conjunction with the EVMP. We report the baseline conditions observed at the time of the establishment of monitoring sites. We include detailed field protocols for site establishment and data collection, as well as timetables for sampling, so that RMNP staff will be able to continue monitoring the sites established during this implementation stage, and continue to add new sites when necessary, as the execution of the EVMP proceeds over the next 20 years.

Colorado↗

Abstract volume for the 2016 biennial meeting of the Yellowstone Volcano Observatory

Introduction Every two years, scientists, natural resource managers, outreach specialists, and a variety of other interested parties get together for the biennial meeting of the Yellowstone Volcano Observatory (YVO). Each time, the theme varies. In past years, we have focused the meeting around topics including monitoring plans, emergency response, geodesy, and outreach. This year, we spent the first half-day devoted to recent research results, plans for upcoming studies, and geothermal monitoring. On the second day, our focus switched to eruption precursors, particularly as they apply to large caldera systems. Very few large explosive eruptions from caldera systems have taken place in recorded history. Therefore, there are few empirical data with which to characterize the nature of volcanic unrest that might precede eruptions with volcano explosivity index (VEI) of six or greater. For this reason, we set up a series of talks that explore what we know and don’t know about large eruptions. We performed an informal expert elicitation (a frequently used method to characterize expert opinion) with a small number of our colleagues, which served as the basis for a productive discussion session. This short volume of abstracts and extended abstracts provides a summary of the presentations made at the YVO meeting held in Mammoth Hot Springs, Wyoming, on May 10–11, 2016.

Open-File Report↗

Salamander chytrid fungus ( Batrachochytrium salamandrivorans ) in the United States—Developing research, monitoring, and management strategies

The recently (2013) identified pathogenic chytrid fungus, Batrachochytrium salamandrivoran s ( Bsal ), poses a severe threat to the distribution and abundance of salamanders within the United States and Europe. Development of a response strategy for the potential, and likely, invasion of Bsal into the United States is crucial to protect global salamander biodiversity. A formal working group, led by Amphibian Research and Monitoring Initiative (ARMI) scientists from the U.S. Geological Survey (USGS) Patuxent Wildlife Research Center, Fort Collins Science Center, and Forest and Rangeland Ecosystem Science Center, was held at the USGS Powell Center for Analysis and Synthesis in Fort Collins, Colorado, United States from June 23 to June 25, 2015, to identify crucial Bsal research and monitoring needs that could inform conservation and management strategies for salamanders in the United States. Key findings of the workshop included the following: (1) the introduction of Bsal into the United States is highly probable, if not inevitable, thus requiring development of immediate short-term and long-term intervention strategies to prevent Bsal establishment and biodiversity decline; (2) management actions targeted towards pathogen containment may be ineffective in reducing the long-term spread of Bsal throughout the United States; and (3) early detection of Bsal through surveillance at key amphibian import locations, among high-risk wild populations, and through analysis of archived samples is necessary for developing management responses. Top research priorities during the preinvasion stage included the following: (1) deployment of qualified diagnostic methods for Bsal and establishment of standardized laboratory practices, (2) assessment of susceptibility for amphibian hosts (including anurans), and (3) development and evaluation of short- and long-term pathogen intervention and management strategies. Several outcomes were achieved during the workshop, including development of an organizational structure with working groups for a Bsal Task Force, creation of an initial influence diagram to aid in identifying effective management actions in the face of uncertainty, and production of a list of potential management actions and key research uncertainties. Additional products under development include a Bsal Strategic Action plan, an emergency response plan, a monitoring and surveillance program, a standardized diagnostic approach, decision models for natural resource agencies, and a reporting database for salamander mortalities. This workshop was the first international meeting to address the threat of Bsal to salamander populations in the United States, with more than 30 participants from U.S. conservation and resource management agencies (U.S. Fish and Wildlife Service, U.S. Forest Service, U.S. Department of Defense, U.S. National Park Service, and Association of Fish and Wildlife Agencies) and academic research institutions in Australia, the Netherlands, Switzerland, the United Kingdom, and the United States.

Open-File Report↗

Asian carp population modeling to support an adaptive management framework

This Monitoring and Response Plan provides the Asian Carp Regional Coordinating Committee (ACRCC) with updates on FWS and USGS modeling efforts for the Spatially Explicit Asian carp Population (SEAcarP) model. For FY2020, efforts are underway to parameterize and analyze the SEAcarP model. Themes: invasive species; Asian carp; Great Lakes.

Illinois↗

Adaptive management: The U.S. Department of the Interior technical guide

The purpose of this technical guide is to present an operational definition of adaptive management, identify the conditions in which adaptive management should be considered, and describe the process of using adaptive management for managing natural resources. The guide is not an exhaustive discussion of adaptive management, nor does it include detailed specifications for individual projects. However, it should aid U.S. Department of the Interior (DOI) managers and practitioners in determining when and how to apply adaptive management. Adaptive management is framed within the context of structured decision making, with an emphasis on uncertainty about resource responses to management actions and the value of reducing that uncertainty to improve management. Though learning plays a key role in adaptive management, it is seen here as a means to an end, namely good management, and not an end in itself. The operational definition used in the guide is adopted from the National Research Council, which characterizes adaptive management as an iterative learning process producing improved understanding and improved management over time: Adaptive management [is a decision process that] promotes flexible decision making that can be adjusted in the face of uncertainties as outcomes from management actions and other events become better understood. Careful monitoring of these outcomes both advances scientific understanding and helps adjust policies or operations as part of an iterative learning process. Adaptive management also recognizes the importance of natural variability in contributing to ecological resilience and productivity. It is not a ‘trial and error’ process, but rather emphasizes learning while doing. Adaptive management does not represent an end in itself, but rather a means to more effective decisions and enhanced benefits. Its true measure is in how well it helps meet environmental, social, and economic goals, increases scientific knowledge, and reduces tensions among stakeholders. Adaptive management as defined here involves ongoing, real-time learning and knowledge creation, both in a substantive sense and in terms of the adaptive process itself. It is described in what follows in a series of 9 steps, as summarized in section 4.1, involving stakeholder involvement, management objectives, management alternatives, predictive models, monitoring plans, decision making, monitoring responses to management, assessment, and adjustment to management actions. An adaptive approach actively engages stakeholders in all phases of a project over its timeframe, facilitating mutual learning and reinforcing the commitment to learning-based management. Adaptive management in DOI is implemented within a legal context that includes statutory authorities such as the National Environmental Policy Act (NEPA), the Endangered Species Act, and the Federal Advisory Committee Act. For many important problems now facing the resource management community, adaptive management holds great promise in reducing the uncertainties that limit the effective management of natural resource systems. For many conservation and management problems, utilizing management itself in an experimental context may be the only feasible way to gain the system understanding needed to improve management. Though it is commonly thought that an adaptive approach can produce results quickly at low cost, the opposite is more likely to be true. An initial investment of time and effort will increase the likelihood of better decision making and resource stewardship in the future, but patience, flexibility, and support are needed over the life of an adaptive management project. For these reasons it is important to carefully consider the potential use of an adaptive approach, and to engage in careful planning and evaluation when adaptive management is used.

Report↗

USGS Telemetry Project

Telemetry of acoustically tagged bigheaded carp (i.e., bighead carp Hypophthalmichthys nobilis and silver carp H. molitrix ) and surrogate fish species has become an invaluable tool in management for these species in the upper Illinois Waterway Systems (i.e., upper Illinois River, lower Des Plaines River, and Chicago Area Waterway System). For example, movement probabilities between adjacent navigation pools need to be estimated to parameterize the Spatially Explicit Asian Carp Population Model (SEAcarP). SEAcarP is a population model used in scenario planning by the Monitoring and Response Workgroup (MRWG) to evaluate alternative management actions. These movement probabilities are estimated from the telemetry data obtained from a longitudinal network of strategically placed receivers that detect bigheaded carp that have been implanted with acoustic transmitters. In addition, fish removal by contracted fishers has become the primary method of controlling bigheaded carp in the upper Illinois and lower Des Plaines Rivers. Variable patterns in bigheaded carp distribution, habitat, and movement, influenced by seasonal and environmental conditions, make targeting bigheaded carp for removal and containment challenging and costly. Understanding these movement patterns for bigheaded carp through modeling and real-time telemetry applications informs removal efforts and facilitates monitoring and contingency actions based on fish movements. To develop a better understanding of fish movement dynamics to meet management objectives, an existing network of real-time and data-logging acoustic receivers in the upper Illinois Waterway Systems is collaboratively managed by a multi-agency team (see Participating Agencies section above). A Telemetry Workgroup has been established by the MRWG to ensure that the multi-agency telemetry efforts are coordinated to efficiently and effectively meet the MRWG goals. This workgroup plans and executes the placement of receivers, tagging of bigheaded carp with acoustic tags, and management of the telemetry data. Three primary objectives to meet MRWG goals identified by the Telemetry Workgroup included (1) development of a common standardized telemetry database with visualization and analysis tools, (2) transitioning from Program MARK (http://www.phidot.org/software/mark/) to a custom Bayesian multi-state model for estimating movement probabilities needed for SEAcarP and (3) deploying, maintaining, and serving data from real-time acoustic receivers to inform contingency planning and fish removal. A telemetry database and visualization tools (FishTracks) will facilitate standardization, archiving, sharing, quality assurance, visualization and analysis of the telemetry data needed for management. Modifications and additions to FishTracks will facilitate more problem-free use of the database and associated applications, as well as useful extraction of information to meet management goals. The transition to a custom Bayesian multi-state model to estimate movement probabilities will support more efficient, effective, and robust population modeling with SEAcarP by overcoming short comings of Program MARK for this purpose. These shortcomings include lack of customizability and extensibility, problems of singularities and poor-convergence, software crashes, parameter exclusion from models, an inability to consistently generate estimates of movement probability, and a lack of uncertainty estimates for movement probabilities. A real-time receiver network that is maintained and tested annually will ensure reliability and accuracy of the real-time alerts to bigheaded carp movements that can be used by management to plan contingency actions.

Illinois↗

Application of dimensionless sediment rating curves to predict suspended-sediment concentrations, bedload, and annual sediment loads for rivers in Minnesota

Consistent and reliable sediment data are needed by Federal, State, and local government agencies responsible for monitoring water quality, planning river restoration, quantifying sediment budgets, and evaluating the effectiveness of sediment reduction strategies. Heightened concerns about excessive sediment in rivers and the challenge to reduce costs and eliminate data gaps has guided Federal and State interests in pursuing alternative methods for measuring suspended and bedload sediment. Simple and dependable data collection and estimation techniques are needed to generate hydraulic and water-quality information for areas where data are unavailable or difficult to collect. The U.S. Geological Survey, in cooperation with the Minnesota Pollution Control Agency and the Minnesota Department of Natural Resources, completed a study to evaluate the use of dimensionless sediment rating curves (DSRCs) to accurately predict suspended-sediment concentrations (SSCs), bedload, and annual sediment loads for selected rivers and streams in Minnesota based on data collected during 2007 through 2013. This study included the application of DSRC models developed for a small group of streams located in the San Juan River Basin near Pagosa Springs in southwestern Colorado to rivers in Minnesota. Regionally based DSRC models for Minnesota also were developed and compared to DSRC models from Pagosa Springs, Colorado, to evaluate which model provided more accurate predictions of SSCs and bedload in Minnesota. Multiple measures of goodness-of-fit were developed to assess the effectiveness of DSRC models in predicting SSC and bedload for rivers in Minnesota. More than 600 dimensionless ratio values of SSC, bedload, and streamflow were evaluated and delineated according to Pfankuch stream stability categories of “good/fair” and “poor” to develop four Minnesota-based DSRC models. The basis for Pagosa Springs and Minnesota DSRC model effectiveness was founded on measures of goodness-of-fit that included proximity of the model(s) fitted line to the 95-percent confidence intervals of the site-specific model, Nash-Sutcliffe Efficiency values, model biases, and deviation of annual sediment loads from each model to the annual sediment loads calculated from measured data. Composite plots comparing Pagosa Springs DSRCs, Minnesota DSRCs, site-specific regression models, and measured data indicated that regionally developed DSRCs (Minnesota DSRC models) more closely approximated measured data for nearly every site. Pagosa Springs DSRC models had markedly larger exponents (slopes) when compared to the Minnesota DSRC models and the site-specific regression models, and over-represent SSC and bedload at streamflows exceeding bankfull. The Nash-Sutcliffe Efficiency values for the Minnesota DSRC model for suspended-sediment concentrations closely matched Nash-Sutcliffe Efficiency values of the site-specific regression models for 12 out of 16 sites. Nash-Sutcliffe Efficiency values associated with Minnesota DSRCs were greater than those associated with Pagosa Springs DSRCs for every site except the Whitewater River near Beaver, Minnesota site. Pagosa Springs DSRC models were less accurate than the mean of the measured data at predicting SSC values for one-half of the sites for good/fair stability sites and one-half of the sites for poor stability sites. Relative model biases were calculated and determined to be substantial (greater than 5 percent) for Pagosa Springs and Minnesota models, with Minnesota models having a lower mean model bias. For predicted annual suspended-sediment loads (SSL), the Minnesota DSRC models for good/fair and poor stream stability sites more closely approximated the annual SSLs calculated from the measured data as compared to the Pagosa Springs DSRC model. Results of data analyses indicate that DSRC models developed using data collected in Minnesota were more effective at compensating for differences in individual stream characteristics across a variety of basin sizes and flow regimes than DSRC models developed using data collected for Pagosa Springs, Colorado. Minnesota DSRC models retained a substantial portion of the unique sediment signatures for most rivers, although deviations were observed for streams with limited sediment supply and for rivers in southeastern Minnesota, which had markedly larger regression exponents. Compared to Pagosa Springs DSRC models, Minnesota DSRC models had regression slopes that more closely matched the slopes of site-specific regression models, had greater Nash-Sutcliffe Efficiency values, had lower model biases, and approximated measured annual sediment loads more closely. The results presented in this report indicate that regionally based DSRCs can be used to estimate reasonably accurate values of SSC and bedload. Practitioners are cautioned that DSRC reliability is dependent on representative measures of bankfull streamflow, SSC, and bedload. It is, therefore, important that samples of SSC and bedload, which will be used for estimating SSC and bedload at the bankfull streamflow, are collected over a range of conditions that includes the ascending and descending limbs of the event hydrograph. The use of DSRC models may have substantial limitations for certain conditions. For example, DSRC models should not be used to predict SSC and sediment loads for extreme streamflows, such as those that exceed twice the bankfull streamflow value because this constitutes conditions beyond the realm of current (2016) empirical modeling capability. Also, if relations between SSC and streamflow and between bedload and streamflow are not statistically significant, DSRC models should not be used to predict SSC or bedload, as this could result in large errors. For streams that do not violate these conditions, DSRC estimates of SSC and bedload can be used for stream restoration planning and design, and for estimating annual sediment loads for streams where little or no sediment data are available.

Minnesota↗

Coordinated bird monitoring: Technical recommendations for military lands

The Department of Defense (DoD) is subject to several rules and regulations establishing responsibilities for monitoring migratory birds. The Sikes Act requires all military installations with significant natural resources to prepare and implement Integrated Natural Resources Management Plans (INRMPs). These plans guide the conservation and long-term management of natural resources on military lands in a manner that is compatible with and sustains the military mission. An INRMP also supports compliance with all legal requirements and guides the military in fulfilling its obligation to be a good steward of public land.The management and conservation of migratory birds is addressed in installation INRMPs. The National Environmental Policy Act (NEPA) requires federal agencies to evaluate and disclose the potential environmental impacts of their proposed actions. More recently, DoD signed an MOU (http://www.dodpif.org/downloads/EO13186_MOU-DoD.pdf) for migratory birds, under Executive Order 13186, with the US Fish and Wildlife Service (USFWS) in July 2006 and a Migratory Bird Rule (http://www.dodpif.org/downloads/MigBirdFINALRule_FRFeb2007.pdf) was passed by Congress in February 2007. The Migratory Bird Rule addresses the potential impacts of military readiness activities on populations of migratory birds and establishes a process to implement conservation measures if and when a military readiness activity is expected to have a significant adverse impact on a population of migratory bird species (as determined through the NEPA process). The MOU states that for nonmilitary readiness activities, prior to initiating any activity likely to affect populations of migratory birds DoD shall (1) identify the migratory bird species likely to occur in the area of the proposed action and determine if any species of concern could be affected by the activity, and (2) assess and document, using NEPA when applicable, the effect of the proposed action on species of concern. By following these procedures, DoD will minimize the possibility for a proposed action to unintentionally take migratory birds at a level that would violate any of the migratory bird treaties and potentially impact mission activities. In addition, implementing conservation and monitoring programs for migratory birds supports the ecosystem integrity necessary to sustain DoD's natural resources for the military mission.Non-compliance with the procedural requirements of the MBTA could result in a private party lawsuit under the Administrative Procedures Act (APA). A lawsuit filed under APA involving a Navy bombing range is the basis for a court ruling that unintentional take of migratory birds applies to federal actions. Ensuring the necessary data is available to adequately assess impacts of a proposed action will help avoid lawsuits or help ensure such lawsuits have no grounds. The data gathered in a bird monitoring program will provide the best scientific data available to assess the expected impacts of a proposed action on migratory bird species through the NEPA process. This report presents recommendations developed by the U.S. Geological Survey (USGS) for the Department of Defense (DoD) on establishing a "Coordinated Bird Monitoring (CBM) Plan." The CBM Plan is intended to ensure that DoD meets its conservation and regulatory responsibilities for monitoring birds (Chapter 1). The report relies heavily on recommendations in the report, "Opportunities for improving avian monitoring" (http://www.nabci-us.org/aboutnabci/monitoringreportfinal0307.pdf), by the U.S. North American Bird Conservation Initiative (U.S. NABCI Monitoring Subcommittee, 2007) and on a review of 358 current DoD bird monitoring programs carried out as part of this project (Chapter 2). This report contains 12 recommendations which, if followed, would result in a comprehensive, efficient, and useful approach to bird monitoring. The recommendations are based on the entire report but are presented together at the end of Chapter 1. DoD has agreed to consider implementing these recommendations; however, final decisions will be based upon such factors as the availability of resources and military mission considerations. These recommendations from USGS can be summarized into 6 major themes: A major report on monitoring was released in 2007 by the U.S. North American Bird Conservation Initiative (http://www.nabci-us.org/main2.html). DoD can be consistent with this report by establishing policy that monitoring will be explicitly acknowledged as an integral element of bird management and conservation (Recommendation 1). The design of monitoring and assessment programs for birds should include the following steps: Preparation of a document describing the program's goals, objectives, and methods similar to a format we provide (Recommendation 2, Chapter 4). Selection of field methods using an "expert system" developed in this project (Recommendation 3, Chapter 5) or another well-documented system. Preparation and storage of metadata describing the monitoring program in the Natural Resources Monitoring Partnership (NRMP), and other appropriate databases Recommendation 4, Chapter 6). Entry of the survey data using eBird (http://ebird.org/content/dod) or the Coordinated Bird Monitoring Database (CBMD) and long-term storage of the data in the CBMD and the Avian Knowledge Network (AKN; Recommendation 5, Chapter 6; http://www.avianknowledge.net/). Submission of major results from the monitoring program for publication in a peer reviewed journal (Recommendation 6). The DoD Legacy Resource Management Program (Legacy; https://www.dodlegacy.org), Environmental Security Technology Certification Program (ESTCP; http://www.serdp.org/), and Strategic Environmental Research and Development Program (SERDP; http://www.serdp.org/) should be encouraged to continue their significant contributions to the foundations of bird monitoring (Recommendation 7, Chapters 1 and 3). Appropriate monitoring should be conducted to identify species of concern on installations. A year-round, one-time survey of birds on installations with habitat for migratory birds would provide the most information to assist compliance with the MOU, the Final Rule, and the NEPA analyses of proposed actions. However, less intensive survey efforts can still be conducted to yield useful information. We describe how various levels of survey effort might be organized and conducted. In addition, continuing surveys, as feasible, would further assist in documenting effects of military readiness and non-readiness activities on species of concern (SOC) (Recommendation 8, Chapter 7). Participation in well-designed, large-scale surveys [(e.g., North American Breeding Bird Survey (BBS; http://www.pwrc.usgs.gov/bbs/), Monitoring Avian Productivity and Survivorship (MAPS; http://www.birdpop.org/maps.htm)] on land that DoD manages or on lands where the results will be of high interest to DoD, will provide DoD and other NABCI members with information important to bird conservation (Recommendation 9, Chapter 8). Review and implementation of the CBM Plan should involve both higher level management and installation-level natural resources managers (Recommendation 11), be implemented through cooperative partnerships (Recommendation 12), and be followed on U.S territory lands and Army Corps of Engineers projects (Recommendation 10).Additional recommendations that pertain to implementing the DoD CBM Plan are discussed in Chapter 9.

Open-File Report↗

Conservation in the face of climate change: The roles of alternative models, monitoring, and adaptation in confronting and reducing uncertainty

The broad physical and biological principles behind climate change and its potential large scale ecological impacts on biota are fairly well understood, although likely responses of biotic communities at fine spatio-temporal scales are not, limiting the ability of conservation programs to respond effectively to climate change outside the range of human experience. Much of the climate debate has focused on attempts to resolve key uncertainties in a hypothesis-testing framework. However, conservation decisions cannot await resolution of these scientific issues and instead must proceed in the face of uncertainty. We suggest that conservation should precede in an adaptive management framework, in which decisions are guided by predictions under multiple, plausible hypotheses about climate impacts. Under this plan, monitoring is used to evaluate the response of the system to climate drivers, and management actions (perhaps experimental) are used to confront testable predictions with data, in turn providing feedback for future decision making. We illustrate these principles with the problem of mitigating the effects of climate change on terrestrial bird communities in the southern Appalachian Mountains, USA.

Southern Appalachian Mountains↗

Monitoring amphibians in Great Smoky Mountains National Park

Amphibian species have inexplicably declined or disappeared in many regions of the world, and in some instances, serious malformations have been observed. In the United States, amphibian declines frequently have occurred even in protected areas. Causes for the declines and malformations probably are varied and may not even be related. The seemingly sudden declines in widely separated areas, however, suggests a need to monitor amphibian populations as well as identify the causes when declines or malformations are discovered. In 2000, the President of the United States and Congress directed Department of the Interior (DOI) agencies to develop a plan to monitor the trends in amphibian populations on DOI lands and to conduct causes of declines. The DOI has stewardship responsibilities over vast land holdings in the United States, much of it occupied by, or potential habitat for, amphibians. The U.S. Geological Survey (USGS) was given lead responsibility for planning and organizing this program, named the Amphibian Research and Monitoring Initiative (ARMI). Authorization carried the mandate to set up a national amphibian monitoring program on Federal lands, to develop the sampling techniques and biometrical analyses necessary to determine status and trends, and to identify possible causes of amphibian declines and malformations. The biological importance of Great Smoky Mountains National Park has been recognized by its designation as an International Biosphere Reserve. As such, it is clearly the leading region of significance for amphibian research. Although no other region shares the wealth of amphibians as found in the Great Smokies (31 species of salamanders, and 13 of frogs), the entire southern and mid-section of the Appalachian Mountain chain is characterized by a high diversity of amphibians, and inventories and monitoring protocols developed in the Smokies likely will be applicable to other Appalachian National Park Service properties. From 1998 to 2001, USGS biologists carried out a pilot inventory and monitoring research project in Great Smoky Mountains National Park. A variety of inventory, sampling, and monitoring techniques were employed and tested. These included wide-scale visual encounter surveys of amphibians at terrestrial and aquatic sites, intensive monitoring of selected plots, randomly placed small-grid plot sampling, litterbag sampling in streams, monitoring nesting females of selected species, call surveys, and monitoring specialized habitats, such as caves. Coupled with information derived from amphibian surveys on Federal lands using various other techniques (automated frog call data loggers, PVC pipes, drift fences, terrestrial and aquatic traps), an amphibian monitoring program was designed to best meet the needs of biologists and natural resource managers after taking into consideration the logistics, terrain, and life histories of the species found within Great Smoky Mountains National Park. This report provides an overview of the Park’s amphibians, the factors affecting their distribution, a review of important areas of biodiversity, and a summary of amphibian life history in the Southern Appalachians. In addition, survey techniques are described as well as examples of how the techniques are set up, a critique of what the results tell the observer, and a discussion of the limitations of the techniques and the data. The report reviews considerations for site selection, outlines steps for biosecurity and for processing diseased or dying animals, and provides resource managers with a decision tree on how to monitor the Park’s amphibians based on different levels of available resources. It concludes with an extensive list of references for inventorying and monitoring amphibians. USGS and Great Smoky Mountains National Park biologists need to establish cooperative efforts and training to ensure that congressionally mandated amphibian surveys are performed in a statistically rigorous and biologically meaningful manner, and that amphibian populations on Federal lands are monitored to ensure their long-term survival. The research detailed in this report will aid these cooperative efforts.

North Carolina, Tennessee↗

Statistical identification of hydrochemical response units for hydrologic monitoring and modeling in Maryland

In support of Maryland's efforts to develop statewide water-quality management plans, a statistical analysis was performed to identify a set of representative and relatively homogeneous areas referred to as Hydrochemical Response Units (HRUs). The State intends to select representative areas within each hydrochemical response unit for monitoring and model development, and then apply the model to the entire unit. To identify hydrochemical response units, cluster analysis was applied to 1,136 digitally defined watershed units. Basin characteristics including land cover, soil type, slope, and geology were determined for each watershed unit and a clustering algorithm was applied to the data sets. A total of 11 hydrochemical response units were identified by the analysis. Major features that were important in distinguishing different areas of the state include: 1) upland and lowland Coastal Plain settings, 2) igneous, shale, and carbonate geology; and 3) urban land cover. The hydrochemical response units described in this report are considered to be an initial classification of watersheds in Maryland that can be refined as geographic data sets are improved and additional hydrologic data are collected.

Water-Resources Investigations Report↗

Monitoring bald eagles using lists of nests: Response to Watts and Duerr

The post-delisting monitoring plan for bald eagles ( Haliaeetus leucocephalus ) roposed use of a dual-frame sample design, in which sampling of known nest sites in combination with additional area-based sampling is used to estimate total number of nesting bald eagle pairs. Watts and Duerr (2010) used data from repeated observations of bald eagle nests in Virginia, USA to estimate a nest turnover rate and used this rate to simulate decline in number of occupied nests in list nests over time. Results of Watts and Duerr suggest that, given the rates of loss of nests from the list of known nest sites in Virginia, the list information will be of little value to sampling unless lists are constantly updated. Those authors criticize the plan for not placing sufficient emphasis on updating and maintaining lists of bald eagle nests. Watts and Duerr's metric of turnover rate does not distinguish detectability or temporary nonuse of nests from permanent loss of nests and likely overestimates turnover rate. We describe a multi-state capture–recapture model that allows appropriate estimation of rates of loss of nests, and we use the model to estimate rates of loss from a sample of nests from Maine, USA. The post-delisting monitoring plan addresses the need to maintain and update the lists of nests, and we show that dual frame sampling is an effective approach for sampling nesting bald eagle populations.

Virginia↗

Volcano hazards program in the United States

Volcano monitoring and volcanic-hazards studies have received greatly increased attention in the United States in the past few years. Before 1980, the Volcanic Hazards Program was primarily focused on the active volcanoes of Kilauea and Mauna Loa, Hawaii, which have been monitored continuously since 1912 by the Hawaiian Volcano Observatory. After the reawakening and catastrophic eruption of Mount St. Helens in 1980, the program was substantially expanded as the government and general public became aware of the potential for eruptions and associated hazards within the conterminous United States. Integrated components of the expanded program include: volcanic-hazards assessment; volcano monitoring; fundamental research; and, in concert with federal, state, and local authorities, emergency-response planning. In 1980 the David A. Johnston Cascades Volcano Observatory was established in Vancouver, Washington, to systematically monitor the continuing activity of Mount St. Helens, and to acquire baseline data for monitoring the other, presently quiescent, but potentially dangerous Cascade volcanoes in the Pacific Northwest. Since June 1980, all of the eruptions of Mount St. Helens have been predicted successfully on the basis of seismic and geodetic monitoring. The largest volcanic eruptions, but the least probable statistically, that pose a threat to western conterminous United States are those from the large Pleistocene-Holocene volcanic systems, such as Long Valley caldera (California) and Yellowstone caldera (Wyoming), which are underlain by large magma chambers still potentially capable of producing catastrophic caldera-forming eruptions. In order to become better prepared for possible future hazards associated with such historically unpecedented events, detailed studies of these, and similar, large volcanic systems should be intensified to gain better insight into caldera-forming processes and to recognize, if possible, the precursors of caldera-forming eruptions.

Journal of Geodynamics↗

Design of Cycle 3 of the National Water-Quality Assessment Program, 2013-23: Part 2: Science plan for improved water-quality information and management

This report presents a science strategy for the third decade of the National Water-Quality Assessment (NAWQA) Program, which since 1991, has been responsible for providing nationally consistent information on the quality of the Nation's streams and groundwater; how water quality is changing over time; and the major natural and human factors that affect current water quality conditions and trends. The strategy is based on an extensive evaluation of the accomplishments of NAWQA over its first two decades, the current status of water-quality monitoring activities by USGS and its partners, and an updated analysis of stakeholder priorities. The plan is designed to address priority issues and national needs identified by NAWQA stakeholders and the National Research Council (2012) irrespective of budget constraints. This plan describes four major goals for the third decade (Cycle 3), the approaches for monitoring, modeling, and scientific studies, key partnerships required to achieve these goals, and products and outcomes that will result from planned assessment activities. The science plan for 2013–2023 is a comprehensive approach to meet stakeholder priorities for: (1) rebuilding NAWQA monitoring networks for streams, rivers, and groundwater, and (2) upgrading models used to extrapolate and forecast changes in water-quality and stream ecosystem condition in response to changing climate and land use. The Cycle 3 plan continues approaches that have been central to the Program’s long-term success, but adjusts monitoring intensities and study designs to address critical information needs and identified data gaps. Restoration of diminished monitoring networks and new directions in modeling and interpretative studies address growing and evolving public and stakeholder needs for water-quality information and improved management, particularly in the face of increasing challenges related to population growth, increasing demands for water, and changing land use and climate. However, a combination of funding growth and extensive collaboration with other USGS programs and other Federal, State, and local agencies, public interest groups, professional and trade associations, academia, and private industry will be needed to fully realize the monitoring and modeling goals laid out in this plan (USGS Fact Sheet 2013-3008).

Open-File Report↗

Monitoring nesting waterbirds for the South Bay Salt Pond Restoration Project—2022 breeding season

The San Francisco Bay supports thousands of breeding waterbirds annually and hosts large populations of American avocets ( Recurvirostra americana ), black-necked stilts ( Himantopus mexicanus ), and Forster’s terns ( Sterna forsteri ). These three species have relied largely on former commercial salt ponds in South San Francisco Bay, which provide wetland foraging habitat and island nesting habitat. The South Bay Salt Pond Restoration Project is in the process of restoring 50–90 percent of 15,100 acres of these former salt ponds to tidal marsh and tidal mudflats. Although this restoration is expected to have numerous benefits, including providing habitat for tidal wetland-dependent species, improving water quality, buffering against storm surge, and protecting inland areas from sea level rise, the reduction in former salt pond habitat and nesting islands may negatively affect breeding waterbirds. To address the reduction in former salt pond habitat available to waterbirds, the South Bay Salt Pond Restoration Project also includes enhancements to remaining pond habitat, such as the construction of new islands for nesting. Moreover, the South Bay Salt Pond Restoration Project follows an adaptive management plan in which waterbird response to the changing landscape is monitored over time to ensure that existing breeding waterbird populations are maintained. In this report, we provide results of waterbird nest monitoring in South San Francisco Bay during the 2022 breeding season and present these results in the context of annual nest monitoring in South San Francisco Bay since 2005. Overall, nest abundance in 2022 remained at or near 18-year lows for American avocets (176 nests) and black-necked stilts (97 nests), but Forster’s tern nest abundance (1,727 nests) was at an 18-year high, reversing historically low abundance observed during 2015–2017. In 2022, there were only 6 American avocet, 4 black-necked stilt, and 4 Forster’s tern major colony nesting sites, which is down from annual averages of 12.4, 6.6, and 6.6 observed during 2005–2009. Nest success (30 percent for American avocets, 29 percent for black-necked stilt, and 53 percent for Forster’s terns) was below the 2005–2007 baseline values established for the South Bay Salt Pond Restoration Project. Average egg-hatching success (98 percent, 100 percent, and 90 percent), and clutch sizes (3.68, 3.70, and 2.63 eggs) of American avocets, black-necked stilts, and Forster’s terns, respectively, were similar to values observed during 2005–2010. All three species displayed notable shifts in nest initiation dates in 2022, with American avocets and Forster’s terns nesting 10–11 days earlier and black-necked stilts nesting 10 days later than during 2005–2010. Finally, the enhanced, managed ponds with newly constructed islands (Ponds A16 and SF2) supported 86 percent of all the Forster’s tern nests recorded in South San Francisco Bay in 2022, which is the first time these managed ponds have hosted such a substantial number of tern nests.

California↗