Search USGS⌕ Search

SEARCH · Search USGS

Results for “River Systems”

Search indexed USGS publications on groundwater, aquifers, geologic maps, mineral resources and earthquakes. Explore source records by subject and place.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69Linked to original sources

Demographics and run timing of adult Lost River ( Deltistes luxatus ) and shortnose ( Chasmistes brevirostris ) suckers in Upper Klamath Lake, Oregon, 2011

Executive Summary Data from a long-term capture-recapture program were used to assess the status and dynamics of populations of two long-lived, federally endangered catostomids in Upper Klamath Lake, Oregon. Lost River suckers ( Deltistes luxatus ) and shortnose suckers ( Chasmistes brevirostris ) have been captured and tagged with passive integrated transponder (PIT) tags during their spawning migrations in each year since 1995. In addition, beginning in 2005, individuals that had been previously PIT-tagged were re-encountered on remote underwater antennas deployed throughout sucker spawning areas. Captures and remote encounters during spring 2011 were used to describe the spawning migrations in that year and also were incorporated into capture-recapture analyses of population dynamics. Cormack-Jolly-Seber (CJS) open population capture-recapture models were used to estimate annual survival probabilities, and a reverse-time analog of the CJS model was used to estimate recruitment of new individuals into the spawning populations. In addition, data on the size composition of captured fish was examined to provide corroborating evidence of recruitment. Survival and recruitment estimates were used to derive estimates of changes in population size over time and to determine the status of the populations in 2010. Separate analyses were conducted for each species and also for each subpopulation of Lost River suckers (LRS). One subpopulation of LRS migrates into tributaries to spawn, similar to shortnose suckers (SNS), whereas the other subpopulation spawns at upwelling areas along the eastern shoreline of the lake. In 2011, we captured, tagged, and released 806 LRS at four lakeshore spawning areas and recaptured an additional 1,006 individuals that had been tagged in previous years. Across all four areas, the remote antennas detected 6,547 individual LRS during the spawning season. Spawning activity peaked in April and most individuals were encountered at Sucker Springs and Cinder Flats. In the Williamson River, we captured, tagged, and released 2,742 LRS and 123 SNS, and recaptured 376 LRS and 58 SNS that had been tagged in previous years. Remote PIT tag antennas in the traps at the weir on the Williamson River and remote antenna systems that spanned the river at four different locations on the Williamson and Sprague Rivers detected a total of 16,494 LRS and 5,450 SNS. Most LRS passed upstream between mid-April and mid-May when water temperatures were rising and near or greater than 10 °C. In contrast, the largest peaks in upstream passage of SNS occurred in early and mid-May when water temperatures were rising and near or greater than 12 °C. Finally, an additional 875 LRS and 1,600 SNS were captured in trammel net sampling at pre-spawn staging areas in the northeastern portion of the lake. Of these, 191of the LRS and 571 of the SNS had been PIT-tagged in previous years. For LRS, encounter histories showed that more than 90 percent of the fish captured at the staging areas were members of the subpopulation that spawns in the tributaries. Capture-recapture analyses for the LRS subpopulation that spawns at the shoreline areas included encounter histories for more than 10,500 individuals, and analyses for the subpopulation that spawns in the tributaries included more than 22,000 encounter histories. With a few exceptions, the survival of males and females in both subpopulations was high (greater than 0.9) between 1999 and 2009. Notably lower survival occurred for both sexes from the tributaries in 2000, for both sexes from the shoreline areas in 2002, and for males from the tributaries in 2006. Between 2001 and 2010, the abundance of males in the lakeshore spawning subpopulation decreased by 50–60 percent and the abundance of females decreased by 29–44 percent. Capture-recapture models suggested that the abundance of the river spawning subpopulation of LRS has increased substantially since 2006. The increase over this period was largely due to large estimated recruitment events in 2003, 2006, and 2008. We know that the estimate in 2006 is substantially biased in favor of recruitment due to a sampling issue. We are skeptical of the magnitude of recruitment indicated by the 2003 and 2008 estimates as well because very few small individuals that would indicate the presence of new recruits were captured in those years. If we assume that little or no recruitment has occurred, the abundance of both sexes in the river spawning subpopulation decreased by more than 40 percent between 2002 and 2010. Capture-recapture analyses for SNS included encounter histories for more than 15,500 individuals. The majority of annual survival estimates between 2001 and 2009 were high (greater than 0.8), but SNS did experience more years of low survival than either LRS subpopulation. The survival of both sexes was particularly low in both 2001 and 2004, and male survival also was somewhat low in 2002 and 2006. Capture-recapture models and size composition data indicated that recruitment of new individuals into the SNS spawning population was trivial in nearly all years between 2001 and 2009. As a result, the abundance of males decreased by 64–82 percent and the abundance of females decreased by 62–76 percent between 2001 and 2010. Despite relatively high survival in most years, both species have experienced substantial declines in the abundance of spawning fish because losses from mortality have not been balanced by recruitment of new individuals. Although capture-recapture data indicate substantial recruitment of new individuals into the adult spawning populations for SNS and river spawning LRS in some years, size data do not corroborate these estimates. In fact, fork length data indicate that all populations are largely comprised of fish that were present in the late 1990s and early 2000s. As a result, the status of the endangered sucker populations in Upper Klamath Lake remains worrisome, and the situation is most dire for shortnose suckers. Future investigations should explore the connections between sucker recruitment and survival and various environmental factors, such as water quality and disease. Our monitoring program provides a robust platform for estimating vital population parameters, evaluating the status of the populations, and assessing the effectiveness of conservation and recovery efforts.

California, Oregon↗

Demographics and run timing of adult Lost River ( Deltistes luxatus ) and short nose ( Chasmistes brevirostris ) suckers in Upper Klamath Lake, Oregon, 2012

Data from a long-term capture-recapture program were used to assess the status and dynamics of populations of two long-lived, federally endangered catostomids in Upper Klamath Lake, Oregon. Lost River suckers ( Deltistes luxatus ) and shortnose suckers ( Chasmistes brevirostris ) have been captured and tagged with passive integrated transponder (PIT) tags during their spawning migrations in each year since 1995. In addition, beginning in 2005, individuals that had been previously PIT-tagged were re-encountered on remote underwater antennas deployed throughout sucker spawning areas. Captures and remote encounters during spring 2012 were used to describe the spawning migrations in that year and also were incorporated into capture-recapture analyses of population dynamics. Cormack-Jolly-Seber (CJS) open population capture-recapture models were used to estimate annual survival probabilities, and a reverse-time analog of the CJS model was used to estimate recruitment of new individuals into the spawning populations. In addition, data on the size composition of captured fish were examined to provide corroborating evidence of recruitment. Model estimates of survival and recruitment were used to derive estimates of changes in population size over time and to determine the status of the populations in 2011. Separate analyses were conducted for each species and also for each subpopulation of Lost River suckers (LRS). Shortnose suckers (SNS) and one subpopulation of LRS migrate into tributary rivers to spawn, whereas the other LRS subpopulation spawns at groundwater upwelling areas along the eastern shoreline of the lake. In 2012, we captured, tagged, and released 749 LRS at four lakeshore spawning areas and recaptured an additional 969 individuals that had been tagged in previous years. Across all four areas, the remote antennas detected 6,578 individual LRS during the spawning season. Spawning activity peaked in April and most individuals were encountered at Cinder Flats and Sucker Springs. In the Williamson River, we captured, tagged, and released 3,376 LRS and 299 SNS, and recaptured 551 LRS and 125 SNS that had been tagged in previous years. Remote PIT tag antennas in the traps at the weir on the Williamson River and remote antenna systems that spanned the river at four different locations on the Williamson and Sprague Rivers detected a total of 19,321 LRS and 6,124 SNS. Most LRS passed upstream between late April and mid-May when water temperatures were increasing and greater than 10 °C. In contrast, most upstream passage for SNS occurred in early and mid-May when water temperatures were increasing and near or greater than 12 °C. Finally, an additional 1,188 LRS and 1,665 SNS were captured in trammel net sampling at pre-spawn staging areas in the northeastern part of the lake. Of these, 291 of the LRS and 653 of the SNS had been PIT-tagged in previous years. For LRS captured at the staging areas that had encounter histories that were informative about their spawning location, over 90 percent of the fish were members of the subpopulation that spawns in the rivers. Capture-recapture analyses for the LRS subpopulation that spawns at the shoreline areas included encounter histories for more than 12,150 individuals, and analyses for the subpopulation that spawns in the rivers included more than 29,500 encounter histories. With a few exceptions, the survival of males and females in both subpopulations was high (greater than 0.9) between 1999 and 2010. Notably lower survival occurred for both sexes from the rivers in 2000, for both sexes from the shoreline areas in 2002, and for males from the rivers in 2006. Between 2001 and 2011, the abundance of males in the lakeshore spawning subpopulation decreased by 53–65 percent and the abundance of females decreased by 36–48 percent. Capture-recapture models suggested that the abundance of both sexes in the river spawning subpopulation of LRS had increased substantially since 2006; increases were due to large estimated recruitment events in 2006 and 2008. We know that the estimates in 2006 are substantially biased in favor of recruitment because of a sampling issue. We are skeptical of the magnitude of recruitment indicated by the 2008 estimates as well because (1) few small individuals that would indicate the presence of new recruits were captured in that year, and (2) recapture probabilities in recruitment models based on just physical recaptures were lower than desired for robust inferences from capture-recapture models. If we assume that little or no recruitment occurred in 2006 or 2008, the abundance of both sexes in the river spawning subpopulation likely has decreased at rates similar to the rates for the lakeshore spawning subpopulation between 2002 and 2011. Capture-recapture analyses for SNS included encounter histories for more than 17,700 individuals. Most annual survival estimates between 2001 and 2010 were high (greater than 0.8), but SNS experienced more years of low survival than either LRS subpopulation. Annual survival of both sexes was particularly low in 2001, 2004, and 2010. In addition, male survival was somewhat low in 2002. Capture-recapture models and size composition data indicate that recruitment of new individuals into the SNS spawning population was trivial between 2001 and 2005. Models indicate substantial recruitment of new individuals into the SNS spawning population in 2006, 2008, and 2009. As a result, capture-recapture modeling suggests that the abundance of adult spawning SNS was relatively stable between 2006 and 2010. We are skeptical of the estimated recruitment in 2006, 2008, and 2009 because few small individuals that would indicate the presence of new recruits were captured in any of those years, and recapture probabilities in recruitment models were low. The best-case scenario for SNS, based on capture-recapture recruitment modeling, indicates that the abundance of males in the spawning population decreased by 71 percent and the abundance of females decreased by 69 percent between 2001 and 2011. The worst-case scenario, which assumes no recruitment and seems more likely, suggests an 86 percent decrease for males and an 81 percent decrease for females. Despite relatively high survival in most years, we conclude that both species have experienced substantial declines in the abundance of spawning fish because losses from mortality have not been balanced by recruitment of new individuals. Although capture-recapture data indicate substantial recruitment of new individuals into the adult spawning populations for SNS and river spawning LRS in some years, size data do not corroborate these estimates. In fact, fork length data indicate that all populations are largely comprised of fish that were present in the late 1990s and early 2000s. As a result, the status of the endangered sucker populations in Upper Klamath Lake remains worrisome, and the situation is especially dire for shortnose suckers. Future investigations should explore the connections between sucker recruitment and survival and various environmental factors, such as water quality and disease. Our monitoring program provides a robust platform for estimating vital population parameters, evaluating the status of the populations, and assessing the effectiveness of conservation and recovery efforts.

Oregon↗

Status and trends of adult Lost River ( Deltistes luxatus ) and shortnose ( Chasmistes brevirostris ) sucker populations in Upper Klamath Lake, Oregon, 2014

Executive Summary Data from a long-term capture-recapture program were used to assess the status and dynamics of populations of two long-lived, federally endangered catostomids in Upper Klamath Lake, Oregon. Lost River suckers ( Deltistes luxatus ) and shortnose suckers ( Chasmistes brevirostris ) have been captured and tagged with passive integrated transponder (PIT) tags during their spawning migrations in each year since 1995. In addition, beginning in 2005, individuals that had been previously PIT-tagged were re-encountered on remote underwater antennas deployed throughout sucker spawning areas. Captures and remote encounters during the spawning season in spring 2014 were incorporated into capture-recapture analyses of population dynamics. Cormack-Jolly-Seber (CJS) open population capture-recapture models were used to estimate annual survival probabilities, and a reverse-time analog of the CJS model was used to estimate recruitment of new individuals into the spawning populations. In addition, data on the size composition of captured fish were examined to provide corroborating evidence of recruitment. Model estimates of survival and recruitment were used to derive estimates of changes in population size over time and to determine the status of the populations through 2013. Separate analyses were conducted for each species and also for each subpopulation of Lost River suckers (LRS). Shortnose suckers (SNS) and one subpopulation of LRS migrate into tributary rivers to spawn, whereas the other LRS subpopulation spawns at groundwater upwelling areas along the eastern shoreline of the lake. In 2014, we captured, tagged, and released 496 LRS at four lakeshore spawning areas and recaptured an additional 970 individuals that had been tagged in previous years. Across all four areas, the remote antennas detected 6,370 individual LRS during the spawning season. Spawning activity peaked in April and most individuals were encountered at Cinder Flats and Sucker Springs. In the Williamson River, we captured, tagged, and released 3,038 LRS and 267 SNS, and recaptured 762 LRS and 156 SNS that had been tagged in previous years. Remote PIT tag antennas in the traps at the weir on the Williamson River and remote antenna systems that spanned the river at three different locations on the Williamson and Sprague Rivers detected a total of 23,446 LRS and 6,259 SNS. Most LRS passed upstream in the first and second weeks of April when water temperatures were increasing and greater than 10 °C. In contrast, upstream passage for SNS occurred in two pulses, one in early April and one in late April to early May, when water temperatures were increasing and near or greater than 12 °C. Finally, an additional 375 LRS and 884 SNS were captured in trammel net sampling at pre-spawn staging areas in the northeastern part of the lake. Of these, 111 of the LRS and 390 of the SNS had been PIT-tagged in previous years. For LRS captured at the staging areas that had encounter histories that were informative about their spawning location, 79 percent of the fish were members of the subpopulation that spawns in the rivers. Capture-recapture analyses for the LRS subpopulation that spawns at the shoreline areas included encounter histories for more than 13,200 individuals, and analyses for the subpopulation that spawns in the rivers included more than 36,400 encounter histories. With a few exceptions, the survival of males and females in both subpopulations was high (greater than 0.88) between 1999 and 2012. Notably lower survival occurred for both sexes from the rivers in 2000, for males from the shoreline areas in 2002, and for males from the rivers in 2006 and 2012. Between 2001 and 2013, the abundance of males in the lakeshore spawning subpopulation decreased by at least 55 percent and the abundance of females decreased by at least 42 percent. Capture-recapture models suggested that the abundance of both sexes in the river spawning subpopulation of LRS had increased substantially since 2006; increases were mostly due to large estimated recruitment events in 2006 and 2008. We know that the estimates in 2006 are substantially biased in favor of recruitment because of a sampling issue. We are skeptical of the magnitude of recruitment indicated by the 2008 estimates as well because (1) few small individuals that would indicate the presence of new recruits were captured in that year, and (2) recapture probabilities in recruitment models based on just physical recaptures of fish were lower than desired for robust inferences from capture-recapture models. If we assume instead that little or no recruitment occurred for this subpopulation, the abundance of both sexes in the river spawning subpopulation likely has decreased at rates similar to the rates for the lakeshore spawning subpopulation between 2002 and 2013. Capture-recapture analyses for SNS included encounter histories for more than 19,200 individuals. Most annual survival estimates between 2001 and 2012 were high (greater than 0.80), but SNS experienced more years of low survival than either LRS subpopulation. Annual survival of both sexes was relatively low in 2004, 2010, and 2012. In addition, male survival was low in 2002. Capture-recapture models and size composition data indicate that recruitment of new individuals into the SNS spawning population was trivial between 2001 and 2005. Models indicate that more than 10 percent of the population was new recruits in a number of more recent years. As a result, capture-recapture modeling suggests that the abundance of adult spawning SNS was relatively stable between 2006 and 2010. We are skeptical of the estimated recruitment in 2006 because of the known sampling issue. We also are skeptical of the estimated recruitment in other recent years because few small individuals that would indicate the presence of new recruits were captured in any of those years, and recapture probabilities in recruitment models were low. The best-case scenario for SNS, based on capture-recapture recruitment modeling, indicates that the abundance of males in the spawning population decreased by 77 percent and the abundance of females decreased by 73 percent between 2001 and 2013. Decreases in abundance for both sexes likely are greater than these estimates indicate. Despite relatively high survival in most years, we conclude that both species have experienced substantial decreases in the abundance of spawning adults because losses from mortality have not been balanced by recruitment of new individuals. Although capture-recapture data indicate substantial recruitment of new individuals into the spawning populations for SNS and river spawning LRS in some years, size data do not corroborate these estimates. As a result, the status of the endangered sucker populations in Upper Klamath Lake remains worrisome, especially for shortnose suckers. Our monitoring program provides a robust platform for estimating vital population parameters, evaluating the status of the populations, and assessing the effectiveness of conservation and recovery efforts.

Oregon↗

Evaluation of flood inundation in Crystal Springs Creek, Portland, Oregon

Efforts to improve fish passage have resulted in the replacement of six culverts in Crystal Springs Creek in Portland, Oregon. Two more culverts are scheduled to be replaced at Glenwood Street and Bybee Boulevard (Glenwood/Bybee project) in 2016. Recently acquired data have allowed for a more comprehensive understanding of the hydrology of the creek and the topography of the watershed. To evaluate the impact of the culvert replacements and recent hydrologic data, a Hydrologic Engineering Center-River Analysis System hydraulic model was developed to estimate water-surface elevations during high-flow events. Longitudinal surface-water profiles were modeled to evaluate current conditions and future conditions using the design plans for the culverts to be installed in 2016. Additional profiles were created to compare with the results from the most recent flood model approved by the Federal Emergency Management Agency for Crystal Springs Creek and to evaluate model sensitivity. Model simulation results show that water-surface elevations during high-flow events will be lower than estimates from previous models, primarily due to lower estimates of streamflow associated with the 0.01 and 0.002 annual exceedance probability (AEP) events. Additionally, recent culvert replacements have resulted in less ponding behind crossings. Similarly, model simulation results show that the proposed replacement culverts at Glenwood Street and Bybee Boulevard will result in lower water-surface elevations during high-flow events upstream of the proposed project. Wider culverts will allow more water to pass through crossings, resulting in slightly higher water-surface elevations downstream of the project during high-flows than water-surface elevations that would occur under current conditions. For the 0.01 AEP event, the water-surface elevations downstream of the Glenwood/Bybee project will be an average of 0.05 ft and a maximum of 0.07 ft higher than current conditions. Similarly, for the 0.002 AEP event, the water-surface elevations will be an average of 0.04 ft and a maximum of 0.19 ft higher than current conditions.

Oregon↗

Hydrologic investigations in the Araguaia-Tocantins River basin (Brazil)

The Araguaia-Tocantins River basin system of central and northern Brazil drains an area of about 770,000 square kilometers and has the potential for supporting large-scale developments. During a short visit to the headquarters of the Interstate Commission for the Araguaia-Tocantins Valley and to several stream-gaging stations in June 1964, the author reviewed the status of the streamflow and meteorological data-collection programs in relation to the streamflow and meteorological data-collection programs in relation to the pressing needs of development project studies. To provide data for areal and project-site studies and for main-stream sites, an initial network of 33 stream gaging stations was proposed, including the 7 stations then in operation. Suggestions were made in regard to operations, staffing and equipment. Organizational responsibilities for operations were found to be divided uncertainly. The Brazilian Meteorological Service had 15 synoptic stations in operation in and near the basin, some in need of reconditioning. Plans were at hand for the addition of 15 sites to the synoptic network and for limited data collection at 27 other sites. The author proposed collection of precipitation data at about 50 other locations to achieve a more representative areal distribution. Temperature, evaporation, and upper-air data sites were suggested to enhance the prospective hydrometeorological studies. (USGS)

Open-File Report↗

Hydrologic and geomorphic studies of the Platte River basin

The channels of the Platte River and its major tributaries, the South Platte and North Platte Rivers in Colorado, Wyoming, and Nebraska, have undergone major changes in hydrologic regime and morphology since about 1860, when the water resources of the basin began to be developed for agricultural, municipal, and industrial uses. These water uses have continued to increase with growth in population and land development. Diversion of flow from channels, storage of water in reservoirs, and increased use of ground water have affected the distribution and timing of streamflows and the transport of fluvial sediments. All these factors have contributed to changes in channel geometry and the riverine environment. In 1979, the U.S. Geological Survey began investigations in the Platte River basin to determine the effects of water use on the hydrology and morphology of the Platte River and its major tributaries. These investigations also considered the relationship of hydrologic regime to factors that control or affect the habitat of migratory waterfowl in the Platte River valley. This volume brings together the results of several research studies on historical changes in channel morphology, surface-water hydrology, hydraulic geometry, sediment-transport and bedform processes, ground-water and surface-water relations, stochastic models of streamflow and precipitation, and methods for estimating discharge required to maintain channel width. In each of the studies, data on some segment of the Platte River hydrologic system were collected and interpreted. All the studies are interrelated; together they provide some degree of understanding of regime changes that are occurring. The hydrologic research described in the following chapters will be useful in decision-making pertaining to the management of water resources and migratory waterfowl habitats.

Colorado, Nebraska, Wyoming↗

Summary and Comparison of Multiphase Streambed Scour Analysis at Selected Bridge Sites in Alaska

The U.S. Geological Survey and the Alaska Department of Transportation and Public Facilities undertook a cooperative multiphase study of streambed scour at selected bridges in Alaska beginning in 1994. Of the 325 bridges analyzed for susceptibility to scour in the preliminary phase, 54 bridges were selected for a more intensive analysis that included site investigations. Cross-section geometry and hydraulic properties for each site in this study were determined from field surveys and bridge plans. Water-surface profiles were calculated for the 100- and 500-year floods using the Hydrologic Engineering Center?s River Analysis System and scour depths were calculated using methods recommended by the Federal Highway Administration. Computed contraction-scour depths for the 100- and 500-year recurrence-interval discharges exceeded 5 feet at six bridges, and pier-scour depths exceeded 10 feet at 24 bridges. Complex pier-scour computations were made at 10 locations where the computed contraction-scour depths would expose pier footings. Pressure scour was evaluated at three bridges where the modeled flood water-surface elevations intersected the bridge structure. Site investigation at the 54 scour-critical bridges was used to evaluate the effectiveness of the preliminary scour analysis. Values for channel-flow angle of attack and approach-channel width were estimated from bridge survey plans for the preliminary study and were measured during a site investigation for this study. These two variables account for changes in scour depths between the preliminary analysis and subsequent reanalysis for most sites. Site investigation is needed for best estimates of scour at bridges with survey plans that indicate a channel-flow angle of attack and for locations where survey plans did not include sufficient channel geometry upstream of the bridge.

Scientific Investigations Report↗

Hydrology, geomorphology, and flood profiles of Lemon Creek, Juneau, Alaska

Lemon Creek near Juneau, Alaska has a history of extensive gravel mining, which straightened and deepened the stream channel in the lower reaches of the study area. Gravel mining and channel excavation began in the 1940s and continued through the mid-1980s. Time sequential aerial photos and field investigations indicate that the channel morphology is reverting to pre-disturbance conditions through aggradation of sediment and re-establishment of braided channels, which may result in decreased channel conveyance and increased flooding potential. Time sequential surveys of selected channel cross sections were conducted in an attempt to determine rates of channel aggradation/degradation throughout three reaches of the study area. In order to assess flooding potential in the lower reaches of the study area the U.S. Army Corps of Engineers Hydrologic Engineering Center River Analysis System model was used to estimate the water-surface elevations for the 2-, 10-, 25-, 50-, and 100-year floods. A regionally based regression equation was used to estimate the magnitude of floods for the selected recurrence intervals. Forty-two cross sections were surveyed to define the hydraulic characteristics along a 1.7-mile reach of the stream. High-water marks from a peak flow of 1,820 cubic feet per second, or about a 5-year flood, were surveyed and used to calibrate the model throughout the study area. The stream channel at a bridge in the lower reach could not be simulated without violating assumptions of the model. A model without the lower bridge indicates flood potential is limited to a small area.

Scientific Investigations Report↗

Continuous hydrologic simulation and flood-frequency, hydraulic, and flood-hazard analysis of the Blackberry Creek watershed, Kane County, Illinois

Results of hydrologic model, flood-frequency, hydraulic model, and flood-hazard analysis of the Blackberry Creek watershed in Kane County, Illinois, indicate that the 100-year and 500-year flood plains range from approximately 25 acres in the tributary F watershed (a headwater subbasin at the northeastern corner of the watershed) to almost 1,800 acres in Blackberry Creek main stem. Based on 1996 land-cover data, most of the land in the 100-year and 500-year flood plains was cropland, forested and wooded land, and grassland. A relatively small percentage of urban land was in the flood plains. The Blackberry Creek watershed has undergone rapid urbanization in recent decades. The population and urbanized lands in the watershed are projected to double from the 1990 condition by 2020. Recently, flood-induced damage has occurred more frequently in urbanized areas of the watershed. There are concerns about the effect of urbanization on flood peaks and volumes, future flood-mitigation plans, and potential effects on the water quality and stream habitats. This report describes the procedures used in developing the hydrologic models, estimating the flood-peak discharge magnitudes and recurrence intervals for flood-hazard analysis, developing the hydraulic model, and the results of the analysis in graphical and tabular form. The hydrologic model, Hydrological Simulation Program-FORTRAN (HSPF), was used to perform the simulation of continuous water movements through various patterns of land uses in the watershed. Flood-frequency analysis was applied to an annual maximum series to determine flood quantiles in subbasins for flood-hazard analysis. The Hydrologic Engineering Center-River Analysis System (HEC-RAS) hydraulic model was used to determine the 100-year and 500-year flood elevations, and to determine the 100-year floodway. The hydraulic model was calibrated and verified using high water marks and observed inundation maps for the July 17-18, 1996, flood event. Digital maps of the 100-year and 500-year flood plains and the 100-year floodway for each tributary and the main stem of Blackberry Creek were compiled.

Scientific Investigations Report↗

Hydrology and Flood Profiles of Duck Creek and Jordan Creek Downstream from Egan Drive, Juneau, Alaska

Hydrologic and hydraulic updates for Duck Creek and the lower part of Jordan Creek in Juneau, Alaska, included computation of new estimates of peak streamflow magnitudes and new water-surface profiles for the 10-, 50-, 100-, and 500-year floods. Computations for the 2-, 5-, 10-, 25-, 50-, 100-, 200-, and 500-year recurrence interval flood magnitudes for both streams used data from U.S. Geological Survey stream-gaging stations weighted with regional regression equations for southeast Alaska. The study area for the hydraulic model consisted of three channels: Duck Creek from Taku Boulevard near the stream's headwaters to Radcliffe Road near the end of the Juneau International Airport runway, an unnamed tributary to Duck Creek from Valley Boulevard to its confluence with Duck Creek, and Jordan Creek from a pedestrian bridge upstream from Egan Drive to Crest Street at Juneau International Airport. Field surveys throughout the study area provided channel geometry for 206 cross sections, and geometric and hydraulic characteristics for 29 culverts and 15 roadway, driveway, or pedestrian bridges. Hydraulic modeling consisted of application of the U.S. Army Corps of Engineers' Hydrologic Engineering Center River Analysis System (HEC-RAS) for steady-state flow at the selected recurrence intervals using an assumed high tide of 20 feet and roughness coefficients refined by calibration to measured water-surface elevations from a 2- to 5-year flood that occurred on November 21, 2005. Model simulation results identify inter-basin flow from Jordan Creek to the southeast at Egan Drive and from Duck Creek to Jordan Creek downstream from Egan Drive at selected recurrence intervals.

Scientific Investigations Report↗

Hydrologic, Hydraulic, and Flood Analyses of the Blackberry Creek Watershed, Kendall County, Illinois

Results of the hydrologic model, flood-frequency, hydraulic model, and flood-hazard analysis of the Blackberry Creek watershed in Kendall County, Illinois, indicate that the 100-year and 500-year flood plains cover approximately 3,699 and 3,762 acres of land, respectively. On the basis of land-cover data for 2003, most of the land in the flood plains was cropland and residential land. Although many acres of residential land were included in the flood plain, this land was mostly lawns, with 25 homes within the 100-year flood plain, and 41 homes within the 500-year flood plain in the 2003 aerial photograph. This report describes the data collection activities to refine the hydrologic and hydraulic models used in an earlier study of the Kane County part of the Blackberry Creek watershed and to extend the flood-frequency analysis through water year 2003. The results of the flood-hazard analysis are presented in graphical and tabular form. The hydrologic model, Hydrological Simulation Program - FORTRAN (HSPF), was used to simulate continuous water movement through various land-use patterns in the watershed. Flood-frequency analysis was applied to an annual maximum series to determine flood quantiles in subbasins for flood-hazard analysis. The Hydrologic Engineering Center- River Analysis System (HEC-RAS) hydraulic model was used to determine the 100-year and 500-year flood elevations, and the 100-year floodway. The hydraulic model was calibrated and verified using observations during three storms at two crest-stage gages and the U.S. Geological Survey streamflowgaging station near Yorkville. Digital maps of the 100-year and 500-year flood plains and the 100-year floodway for each tributary and the main stem of Blackberry Creek were compiled.

Scientific Investigations Report↗

Estimated Flood Discharges and Map of Flood-Inundated Areas for Omaha Creek, near Homer, Nebraska, 2005

Repeated flooding of Omaha Creek has caused damage in the Village of Homer. Long-term degradation and bridge scouring have changed substantially the channel characteristics of Omaha Creek. Flood-plain managers, planners, homeowners, and others rely on maps to identify areas at risk of being inundated. To identify areas at risk for inundation by a flood having a 1-percent annual probability, maps were created using topographic data and water-surface elevations resulting from hydrologic and hydraulic analyses. The hydrologic analysis for the Omaha Creek study area was performed using historical peak flows obtained from the U.S. Geological Survey streamflow gage (station number 06601000). Flood frequency and magnitude were estimated using the PEAKFQ Log-Pearson Type III analysis software. The U.S. Army Corps of Engineers' Hydrologic Engineering Center River Analysis System, version 3.1.3, software was used to simulate the water-surface elevation for flood events. The calibrated model was used to compute streamflow-gage stages and inundation elevations for the discharges corresponding to floods of selected probabilities. Results of the hydrologic and hydraulic analyses indicated that flood inundation elevations are substantially lower than from a previous study.

Scientific Investigations Report↗

Dam-breach analysis and flood-inundation mapping for Lakes Ellsworth and Lawtonka near Lawton, Oklahoma

Dams provide beneficial functions such as flood control, recreation, and reliable water supplies, but they also entail risk: dam breaches and resultant floods can cause substantial property damage and loss of life. The State of Oklahoma requires each owner of a high-hazard dam, which the Federal Emergency Management Agency defines as dams for which failure or misoperation probably will cause loss of human life, to develop an emergency action plan specific to that dam. Components of an emergency action plan are to simulate a flood resulting from a possible dam breach and map the resulting downstream flood-inundation areas. The resulting flood-inundation maps can provide valuable information to city officials, emergency managers, and local residents for planning the emergency response if a dam breach occurs. Accurate topographic data are vital for developing flood-inundation maps. This report presents results of a cooperative study by the city of Lawton, Oklahoma, and the U.S. Geological Survey (USGS) to model dam-breach scenarios at Lakes Ellsworth and Lawtonka near Lawton and to map the potential flood-inundation areas of such dam breaches. To assist the city of Lawton with completion of the emergency action plans for Lakes Ellsworth and Lawtonka Dams, the USGS collected light detection and ranging (lidar) data that were used to develop a high-resolution digital elevation model and a 1-foot contour elevation map for the flood plains downstream from Lakes Ellsworth and Lawtonka. This digital elevation model and field measurements, streamflow-gaging station data (USGS streamflow-gaging station 07311000, East Cache Creek near Walters, Okla.), and hydraulic values were used as inputs for the dynamic (unsteady-flow) model, Hydrologic Engineering Center's River Analysis System (HEC-RAS). The modeled flood elevations were exported to a geographic information system to produce flood-inundation maps. Water-surface profiles were developed for a 75-percent probable maximum flood scenario and a sunny-day dam-breach scenario, as well as for maximum flood-inundation elevations and flood-wave arrival times for selected bridge crossings. Some areas of concern near the city of Lawton, if a dam breach occurs at Lakes Ellsworth or Lawtonka, include water treatment plants, wastewater treatment plants, recreational areas, and community-services offices.

Oklahoma↗

Evaluation of streambed scour at bridges over tidal waterways in Alaska

The potential for streambed scour was evaluated at 41 bridges that cross tidal waterways in Alaska. These bridges are subject to several coastal and riverine processes that have the potential, individually or in combination, to induce streambed scour or to damage the structure or adjacent channel. The proximity of a bridge to the ocean and water-surface elevation and velocity data collected over a tidal cycle were criteria used to identify the flow regime at each bridge, whether tidal, riverine, or mixed, that had the greatest potential to induce streambed scour. Water-surface elevations measured through at least one tide cycle at 32 bridges were correlated to water levels at the nearest tide station. Asymmetry of the tidal portion of the hydrograph during the outgoing tide at 12 bridges indicated that riverine flows were stored upstream of the bridge during the tidal exchange. This scenario results in greater discharges and velocities during the outgoing tide compared to those on the incoming tide. Velocity data were collected during outgoing tides at 10 bridges that experienced complete flow reversals, and measured velocities during the outgoing tide exceeded the critical velocity required to initiate sediment transport at three sites. The primary risk for streambed scour at most of the sites considered in this study is from riverine flows rather than tidal fluctuations. A scour evaluation for riverine flow was completed at 35 bridges. Scour from riverine flow was not the primary risk for six tidally-controlled bridges and therefore not evaluated at those sites. Field data including channel cross sections, a discharge measurement, and a water-surface slope were collected at the 35 bridges. Channel instability was identified at 14 bridges where measurable scour and or fill were noted in repeated surveys of channel cross sections at the bridge. Water-surface profiles for the 1-percent annual exceedance probability discharge were calculated by using the Hydrologic Engineering Center’s River Analysis System model, and scour depths were calculated using methods recommended by the Federal Highway Administration. Computed contraction-scour depths were greater than 2.0 feet at five bridges and computed pier-scour depths were 4.0 feet or greater at 15 bridges. The potential for streambed scour by both coastal and riverine processes at the bridges considered in this study were evaluated, ranked, and summed to determine a cumulative risk factor for each bridge. Possible factors that could mitigate the scour risks were investigated at 22 bridges that had high individual or cumulative rankings. Mitigating factors such as piers founded in bedrock, deep pier foundations relative to scour depths, and lack of observed scour during field measurements were documented for 13 sites, but additional study and monitoring is needed to better quantify the streambed scour potential for nine sites. Three bridges prone to being affected by storm surges will require more data collection and possibly complex hydrodynamic modeling to accurately quantify the streambed scour potential. Continuous monitoring of water-surface and streambed elevation at one or more piers is needed for two bridges to better understand the tidal and riverine influences on streambed scour.

Alaska↗

Estimation of potential scour at bridges on local government roads in South Dakota, 2009-12

In 2009, the U.S. Geological Survey and South Dakota Department of Transportation (SDDOT) began a study to estimate potential scour at selected bridges on local government (county, township, and municipal) roads in South Dakota. A rapid scour-estimation method (level-1.5) and a more detailed method (level-2) were used to develop estimates of contraction, abutment, and pier scour. Data from 41 level-2 analyses completed for this study were combined with data from level-2 analyses completed in previous studies to develop new South Dakota-specific regression equations: four regional equations for main-channel velocity at the bridge contraction to account for the widely varying stream conditions within South Dakota, and one equation for head change. Velocity data from streamgages also were used in the regression for average velocity through the bridge contraction. Using these new regression equations, scour analyses were completed using the level-1.5 method on 361 bridges on local government roads. Typically, level-1.5 analyses are completed at flows estimated to have annual exceedance probabilities of 1 percent (100-year flood) and 0.2 percent (500-year flood); however, at some sites the bridge would not pass these flows. A level-1.5 analysis was then completed at the flow expected to produce the maximum scour. Data presented for level-1.5 scour analyses at the 361 bridges include contraction, abutment, and pier scour. Estimates of potential contraction scour ranged from 0 to 32.5 feet for the various flows evaluated. Estimated potential abutment scour ranged from 0 to 40.9 feet for left abutments, and from 0 to 37.7 feet for right abutments. Pier scour values ranged from 2.7 to 31.6 feet. The scour depth estimates provided in this report can be used by the SDDOT to compare with foundation depths at each bridge to determine if abutments or piers are at risk of being undermined by scour at the flows evaluated. Replicate analyses were completed at 24 of the 361 bridges to provide quality-assurance/quality-control measures for the level-1.5 scour estimates. An attempt was made to use the same flows among replicate analyses. Scour estimates do not necessarily have to be in numerical agreement to give the same results. For example, if contraction scour replicate analyses are 18.8 and 30.8 feet, both scour depths can indicate susceptibility to scour for which countermeasures may be needed, even though one number is much greater than the other number. Contraction scour has perhaps the greatest potential for being estimated differently in replicate visits. For contraction scour estimates at the various flows analyzed, differences between results ranged from -7.8 to 5.5 feet, with a median difference of 0.4 foot and an average difference of 0.2 foot. Abutment scour appeared to be nearly as reproducible as contraction scour. For abutment scour estimates at the varying flows analyzed, differences between results ranged from -17.4 to 11 feet, with a median difference of 1.4 feet and an average difference of 1.7 feet. Estimates of pier scour tended to be the most consistently reproduced in replicate visits, with differences between results ranging from -0.3 to 0.5 foot, with a median difference of 0.0 foot and an average difference of 0.0 foot. The U.S. Army Corps of Engineers Hydraulics Engineering Center River Analysis Systems (HEC-RAS) software package was used to model stream hydraulics at the 41 sites with level-2 analyses. Level-1.5 analyses also were completed at these sites, and the performance of the level-1.5 method was assessed by comparing results to those from the more rigorous level-2 method. The envelope curve approach used in the level-1.5 method is designed to overestimate scour relative to the estimate from the level-2 scour analysis. In cases where the level-1.5 method estimated less scour than the level-2 method, the amount of underestimation generally was less than 3 feet. The level-1.5 method generally overestimated contraction, abutment, and pier scour relative to the level-2 method, as intended. Although the level-1.5 method is designed to overestimate scour relative to more involved analysis methods, many assumptions, uncertainties, and estimations are involved. If the envelope curves are adjusted such that the level-1.5 method never underestimates scour relative to the level-2 method, an accompanying result may be excessive overestimation.

South Dakota↗

Dam-breach analysis and flood-inundation mapping for selected dams in Oklahoma City, Oklahoma, and near Atoka, Oklahoma

Dams provide beneficial functions such as flood control, recreation, and storage of water supplies, but they also entail risk; dam breaches and resultant floods can cause substantial property damage and loss of life. The State of Oklahoma requires each owner of a high-hazard dam, which the Federal Emergency Management Agency defines as dams for which failure or improper operation probably will cause loss of human life, to develop an emergency action plan specific to that dam. Components of an emergency action plan are to simulate a flood resulting from a possible dam breach and map the resulting downstream flood-inundation areas. The resulting flood-inundation maps can provide valuable information to city officials, emergency managers, and local residents for planning an emergency response if a dam breach occurs. This report presents results of a cooperative study by the U.S. Geological Survey and the City of Oklahoma City to model dam-breach scenarios at 11 dams controlled and operated by Oklahoma City, Okla., and to map the potential flood-inundation areas of such dam breaches. To assist the City of Oklahoma City with completion of the emergency action plans for the 11 dams, the U.S. Geological Survey used light detection and ranging (lidar) elevation data (2004), which produced a 2-foot contour elevation map for the flood plains around Oklahoma City. A 5-meter Digital Terrain Map was used to model the flood plain below Atoka Reservoir in southeastern Oklahoma. Digital-elevation models, field survey measurements, hydraulic data, and hydrologic data (U.S. Geological Survey streamflow-gaging stations North Canadian River below Lake Overholser near Oklahoma City, Okla. [07241000], and North Canadian River at Britton Road at Oklahoma City, Okla. [07241520]), were used as inputs for the one-dimensional dynamic (unsteady-flow) models using Hydrologic Engineering Centers River Analysis System (HEC–RAS) software. The modeled flood elevations were exported to a geographic information system to produce flood-inundation maps. Water-surface profiles were developed for a 75-percent probable maximum flood dam-breach scenario and a sunny-day dam-breach scenario, as well as for maximum flood-inundation elevations and flood-wave arrival times at selected bridge crossings. Points of interest such as community-services offices, recreational areas, water-treatment plants, and wastewater-treatment plants were identified on the flood-inundation maps.

Oklahoma↗

Flood-hazard analysis of four headwater streams draining the Argonne National Laboratory property, DuPage County, Illinois

Results of a flood-hazard analysis conducted by the U.S. Geological Survey, in cooperation with the Argonne National Laboratory, for four headwater streams within the Argonne National Laboratory property indicate that the 1-percent and 0.2-percent annual exceedance probability floods would cause multiple roads to be overtopped. Results indicate that most of the effects on the infrastructure would be from flooding of Freund Brook. Flooding on the Northeast and Southeast Drainage Ways would be limited to overtopping of one road crossing for each of those streams. The Northwest Drainage Way would be the least affected with flooding expected to occur in open grass or forested areas. The Argonne Site Sustainability Plan outlined the development of hydrologic and hydraulic models and the creation of flood-plain maps of the existing site conditions as a first step in addressing resiliency to possible climate change impacts as required by Executive Order 13653 “Preparing the United States for the Impacts of Climate Change.” The Hydrological Simulation Program-FORTRAN is the hydrologic model used in the study, and the Hydrologic Engineering Center‒River Analysis System (HEC–RAS) is the hydraulic model. The model results were verified by comparing simulated water-surface elevations to observed water-surface elevations measured at a network of five crest-stage gages on the four study streams. The comparison between crest-stage gage and simulated elevations resulted in an average absolute difference of 0.06 feet and a maximum difference of 0.19 feet. In addition to the flood-hazard model development and mapping, a qualitative stream assessment was conducted to evaluate stream channel and substrate conditions in the study reaches. This information can be used to evaluate erosion potential.

Illinois↗

Hydrologic and hydraulic analyses of selected streams in Stark County, Ohio

To update and expand a part of the Federal Emergency Management Agency Flood Insurance Study, the U.S. Geological Survey, the Muskingum Watershed Conservancy District, and the Stark County Commissioners began a cooperative study. The study consisted of hydrologic and hydraulic analyses for selected reaches of 14 streams in Stark County, Ohio: Broad-Monter Creek, Chatham Ditch, East Branch Nimishillen Creek, Fairhope Ditch, Firestone Ditch, Hayden Ditch, Middle Branch Nimishillen Creek, Middle Branch Nimishillen Creek Tributary Number 1, Nimishillen Creek, Reemsnyder Ditch, Sherrick Run, unnamed stream, West Branch Nimishillen Creek, and Zimber Ditch. The study totaled nearly 50 miles of stream reaches. Instantaneous peak streamflows for floods with 10-, 4-, 2-, 1-, and 0.2-percent and 1-percent plus annual exceedance probabilities were estimated using historical streamflow data from the streamgages Nimishillen Creek at North Industry, Ohio (U.S. Geological Survey station number 03118500), and Middle Branch Nimishillen Creek at Canton, Ohio (U.S. Geological Survey station number 03118000), regional flood regression equations, and streamflow urbanization techniques. The annual exceedance probability streamflows were then used in a Hydrologic Engineering Center-River Analysis System step-backwater model to determine water-surface profiles, flood-inundation boundaries for the 10-, 4-, 2-, 1-, and 0.2-percent and 1-percent plus annual exceedance probability floods, and a regulatory floodway along a selected reach of each stream. Model input included DEM-derived cross sections supplemented with field surveys of open channel cross sections and hydraulic structures, field estimates of roughness values, and annual exceedance probability flood estimates from regional regression equations and historical streamflow data. Flood-inundation boundaries were mapped for the 1- and 0.2-percent annual exceedance probability floods and a regulatory floodway for each stream reach.

Ohio↗