Search USGS⌕ Search

SEARCH · Search USGS

Results for “Progress Report”

Search indexed USGS publications on groundwater, aquifers, geologic maps, mineral resources and earthquakes. Explore source records by subject and place.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 667 records · Page 37Linked to original sources

Water-resources activities in Utah by the U.S. Geological Survey, October 1, 1990, to September 30, 1991

This report contains summaries of the progress of water-resources studies in Utah by the U.S. Geological Survey, Water Resources Division, Utah District, from October 1, 1990, to September 30, 1991. The program in Utah during this period consisted of 23 projects; a discussion of each project is given in the main body of this report. The following sections outline the origin of the U.S. Geological Survey, the basic mission of the Water Resources Division, the organizational structure of the Utah District, the distribution of District funding in terms of source of funds and type of activity funded, and the agencies with which the District cooperates. The last part of the introduction is a list of reports produced by the District from October 1990 to September 1991.

Utah↗

Water-resources activities in Utah by the U.S. Geological Survey, October 1, 1991, to September 30, 1992

This report contains summaries of the progress of water-resources studies in Utah by the U.S. Geological Survey, Water Resources Division, Utah District, from October 1, 1991, to September 30, 1992. The program in Utah during this period consisted of 20 projects; a discussion of each project is presented in the main body of this report. The following sections outline the origin of the U.S. Geological Survey, the basic mission of the Water Resources Division, the organizational structure of the Utah District, the distribution of District funding in terms of source of funds and type of activity funded, and the agencies with which the District cooperates. The last part of the introduction is a list of reports produced by the District from October 1991 to September 1992.

Utah↗

Water-resources activities of the U.S. Geological Survey in Utah, October 1, 1995, to September 30, 1996

This report contains summaries of the progress of water-resources activities of the U.S. Geological Survey (USGS), Water Resources Division, Utah District, from October 1, 1995, to September 30, 1996. The waterresources program in Utah during this period consisted of 22 projects; a discussion of each project is presented in the main body of this report. The following sections outline the origin of the USGS, the mission of the Water Resources Division, the organizational structure of the Utah District, office addresses of the Utah District, the distribution of program funding as source of funds and type of activity funded in Federal Fiscal Year 1996 (FY96) (October 1, 1995, to September 30, 1996), and the agencies with which the District cooperates. The last part of the introduction is a list of reports produced by the District from October 1995 to September 1996.

Utah↗

Water-resources activities in Utah by the U.S. Geological Survey, July 1, 1985, to June 30, 1986

This report contains summaries of the progress of water-resources studies in Utah by the U.S. Geological Survey, Water Resources Division, Utah District, from July 1, 1985 to June 30, 1986. The program in Utah during this period consisted of 22 projects, and a discussion of each project is given in the main body of the report. Short descriptions are given at the end of the report for six proposed projects to be started on or after July 1986. The following sections outline the basic mission and program of the Water Resources Division, the organizational structure of the Utah District, the distribution of District funding in terms of source of funds and type of activity funded, and the agencies with which the District cooperates. The last part of the introduction is a list of reports produced by the District from July 1985 to June 1986.

Utah↗

Water-resources activities in Utah by the U.S. Geological Survey, October 1, 1992, to September 30, 1993

This report contains summaries of the progress of water-resources studies in Utah by the U.S. Geological Survey (USGS), Water Resources Division, Utah District, from October 1, 1992, to September 30, 1993. The program in Utah during this period consisted of 21 projects; a discussion of each project is presented in the main body of the report. The USGS was established by an act of Congress on March 3, 1879, to provide a permanent Federal agency to conduct the systematic and scientific classifi- cation of the public lands, and examination of the geologic structure, mineral resources, and products of national domain. An integral part of that original mission includes publishing and dissemi- nating the earth-science information needed to understand, to plan the use of, and to manage the Nation's energy, land, mineral, and water resources.

Utah↗

Water-resources activities of the U.S. Geological Survey in Utah, October 1, 1994, to September 30, 1995

This report contains summaries of the progress of water-resources studies in Utah done by the U.S. Geological Survey, Water Resources Division, Utah District, from October 1,1994, to September 30, 1995. The waterresources program in Utah during this period consisted of 23 projects; a discussion of each project is presented in the main body of this report. The following sections outline the origin of the U.S. Geological Survey, the basic mission of the Water Resources Division, the organizational structure of the Utah District, office addresses of the Utah District, the distribution of program funding as source of funds and type of activity funded in Federal Fiscal Year (FY) 1995 (October 1, 1994, to September 30,1995), and the agencies with which the District cooperates. The last part of the introduction is a list of reports produced by the District from October 1994 to September 1995.

Utah↗

Water-resources activities of the U.S. Geological Survey in Utah, October 1, 1993, to September 30, 1994

This report contains summaries of the progress of water-resources studies in Utah by the U.S. Geological Survey, Water Resources Division, Utah District, from October 1, 1993, to September 30, 1994. The water-resources program in Utah during this period consisted of 21 projects; a discussion of each project is presented in the main body of this report. The following sections outline the origin of the U.S. Geological Survey, the basic mission of the Water Resources Division, the organizational structure of the Utah District, office addresses of the Utah District, the distribution of District funding in terms of source of funds and type of activity funded, and the agencies with which the District cooperates. The last part of the introduction is a list of reports produced by the District from October 1993 to September 1994.

Open-File Report↗

Ecological requirements for pallid sturgeon reproduction and recruitment in the Missouri River: annual report 2011

The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The project strategy integrates field and laboratory studies of sturgeon reproductive ecology, early life history, habitat requirements, and physiology. The project scope of work is developed annually with cooperating research partners and in collaboration with the U.S. Army Corps of Engineers, Missouri River Recovery—Integrated Science Program. The research consists of several interdependent and complementary tasks that engage multiple disciplines. The research tasks in the 2011 scope of work emphasized understanding of reproductive migrations and spawning of adult sturgeon, and hatch and drift of larvae. These tasks were addressed in three hydrologically and geomorphologically distinct parts of the Missouri River Basin: the Lower Missouri River downstream from Gavins Point Dam, the Upper Missouri River downstream from Fort Peck Dam and including downstream reaches of the Milk River, and the Lower Yellowstone River. The research is designed to inform management decisions related to channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2011.

Missouri River↗

Ecological requirements for pallid sturgeon reproduction and recruitment in the Missouri River—Annual report 2014

The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The project strategy integrates field and laboratory studies of sturgeon reproductive ecology, early life history, habitat requirements, and physiology. The project scope of work is developed annually with collaborating research partners and in cooperation with the U.S. Army Corps of Engineers, Missouri River Recovery Program–Integrated Science Program. The project research consists of several interdependent and complementary tasks that involve multiple disciplines. The project research tasks in the 2014 scope of work emphasized understanding of reproductive migrations and spawning of adult pallid sturgeon and hatch and drift of larvae. These tasks were addressed in three hydrologically and geomorphologically distinct parts of the Missouri River Basin: the Lower Missouri River downstream from Gavins Point Dam, the Upper Missouri River downstream from Fort Peck Dam and downstream reaches of the Milk River, and the Lower Yellowstone River. The project research is designed to inform management decisions related to channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2014.

Missouri, Montana, Nebraska↗

Ecological requirements for pallid sturgeon reproduction and recruitment in the Missouri River—Annual report 2013

The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The project strategy integrates field and laboratory studies of pallid sturgeon reproductive ecology, early life history, habitat requirements, and physiology. The project scope of work is developed annually with collaborating research partners and in cooperation with the U.S. Army Corps of Engineers, Missouri River Recovery—Integrated Science Program. The research consists of several interdependent and complementary tasks that engage multiple disciplines. The research tasks in the 2013 scope of work emphasized understanding reproductive migrations and spawning of adult pallid sturgeon, and hatch and drift of free embryos and larvae. These tasks were addressed in four study sections located in three hydrologically and geomorphologically distinct parts of the Missouri River Basin: the Upper Missouri River downstream from Fort Peck Dam, including downstream reaches of the Milk River, the Lower Yellowstone River, and the Lower Missouri River downstream from Gavins Point Dam. The research is designed to inform management decisions related to channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2013.

Missouri River Basin↗

Asynchronous flowering patterns in saguaro cacti (Carnegiea gigantea)

The saguaro cactus ( Carnegiea gigantea [Engelm.] Britton & Rose) is a keystone species endemic to the Sonoran Desert of northern Mexico and the southwestern United States. The saguaro produces large white flowers near its stem apex (crown) during April–June, which bloom at night and close the following day. In 1924, Duncan Johnson reported that saguaro floral buds are likely to have an asymmetrical distribution in which buds occur in higher densities on the eastern half of a plant's crown. Using technology not available to Johnson, we tested his observations to determine whether flowers are asymmetrically distributed using repeat photography. We also tested whether there is a seasonal pattern of flowering that may explain Johnson’s observations. We tracked intra-individual flowering phenology of 20 saguaros and measured 2372 flowers across two reproductive seasons in Saguaro National Park, Tucson, Arizona. Flowers first appeared on the east side of all saguaro crowns at the start of the reproductive season, and then spread radially in a counterclockwise direction as the season progressed. In contrast to previous reports, saguaro flowers were consistently more abundant on the northern part of the crown than in the eastern part. To our knowledge, this study is the first to document a seasonal, counterclockwise pattern of asynchronous flowering in saguaro or any angiosperm. We discuss potential drivers of this phenomenon as well as implications for saguaros responding to climate change.

Arizona↗

Water-resources activities of the U.S. Geological Survey in Utah, October 1, 1996, to September 30, 1997

This report contains summaries of the progress of water-resources activities of the U.S. Geological Survey (USGS), Water Resources Division, Utah District, from October 1, 1996, to September 30,1997. The waterresources program in Utah during this period consisted of 25 projects, and a discussion of each project is presented. The following sections outline the origin of the USGS, the mission of the Water Resources Division, the organizational structure of the Utah District, office addresses of the Utah District, the distribution of program funding as source of funds and type of activity funded in Federal Fiscal Year 1997 (FY97) (October 1,1996, to September 30, 1997), and the agencies with which the District cooperates. The last part of the introduction is a list of reports produced by the District from October 1996 to September 1997.

Utah↗

Digital data base application to porphyry copper mineralization in Alaska; case study summary

The purpose of this report is to summarize the progress in use of digital image analysis techniques in developing a conceptual model for assessing porphyry copper mineral potential. The study area consists of approximately the southern one-half of the 1? by 3? Nabesna quadrangle in east-central Alaska. The digital geologic data base consists of data compiled under the Alaskan Mineral Resource Assessment Program (AMRAP) as well as digital elevation data and Landsat spectral reflectance data from the Multispectral Scanner System. The digital data base used to develop and implement a conceptual model for porphyry-type copper mineralization consisted of 16 original data types and 18 derived data sets formatted in a grid-cell (raster) structure and registered to a map base in the Universal Transverse Mercator (UTM) projection. Minimum curvature and inverse distance squared interpolation techniques were used to generate continuous surfaces from sets of irregularly spaced data points. Processing requirements included: (1) merging or overlaying of data sets, (2) display and color coding of maps and images, (3) univariate and multivariate statistical analyses, and (4) compound overlaying operations. Data sets were merged and processed to create stereoscopic displays of continuous surfaces. The ratio of several data sets were calculated to evaluate relative variations and to enhance the display of surface alteration (gossans). Factor analysis and principal components analysis techniques were used to determine complex relationships and correlations between data sets. The resultant model consists of 10 parameters that identify three areas most likely to contain porphyry copper mineralization; two of these areas are known occurrences of mineralization and the third is not well known. Field studies confirmed that the three areas identified by the model have significant copper potential.

Open-File Report↗

Incorporating uncertainty into mercury-offset decisions with a probabilistic network for National Pollutant Discharge Elimination System permit holders: An interim report

This interim report describes an alternative approach for evaluating the efficacy of using mercury (Hg) offsets to improve water quality. Hg-offset programs may allow dischargers facing higher-pollution control costs to meet their regulatory obligations by making more cost effective pollutant-reduction decisions. Efficient Hg management requires methods to translate that science and economics into a regulatory decision framework. This report documents the work in progress by the U.S. Geological Survey’s Western Geographic Science Center in collaboration with Stanford University toward developing this decision framework to help managers, regulators, and other stakeholders decide whether offsets can cost effectively meet the Hg total maximum daily load (TMDL) requirements in the Sacramento River watershed. Two key approaches being considered are: (1) a probabilistic approach that explicitly incorporates scientific uncertainty, cost information, and value judgments; and (2) a quantitative approach that captures uncertainty in testing the feasibility of Hg offsets. Current fate and transport-process models commonly attempt to predict chemical transformations and transport pathways deterministically. However, the physical, chemical, and biologic processes controlling the fate and transport of Hg in aquatic environments are complex and poorly understood. Deterministic models of Hg environmental behavior contain large uncertainties, reflecting this lack of understanding. The uncertainty in these underlying physical processes may produce similarly large uncertainties in the decisionmaking process. However, decisions about control strategies are still being made despite the large uncertainties in current Hg loadings, the relations between total Hg (HgT) loading and methylmercury (MeHg) formation, and the relations between control efforts and Hg content in fish. The research presented here focuses on an alternative analytical approach to the current use of safety factors and deterministic methods for Hg TMDL decision support, one that is fully compatible with an adaptive management approach. This alternative approach uses empirical data and informed judgment to provide a scientific and technical basis for helping National Pollutant Discharge Elimination System (NPDES) permit holders make management decisions. An Hg-offset system would be an option if a wastewater-treatment plant could not achieve NPDES permit requirements for HgT reduction. We develop a probabilistic decision-analytical model consisting of three submodels for HgT loading, MeHg, and cost mitigation within a Bayesian network that integrates information of varying rigor and detail into a simple model of a complex system. Hg processes are identified and quantified by using a combination of historical data, statistical models, and expert judgment. Such an integrated approach to uncertainty analysis allows easy updating of prediction and inference when observations of model variables are made. We demonstrate our approach with data from the Cache Creek watershed (a subbasin of the Sacramento River watershed). The empirical models used to generate the needed probability distributions are based on the same empirical models currently being used by the Central Valley Regional Water Quality Control Cache Creek Hg TMDL working group. The significant difference is that input uncertainty and error are explicitly included in the model and propagated throughout its algorithms. This work demonstrates how to integrate uncertainty into the complex and highly uncertain Hg TMDL decisionmaking process. The various sources of uncertainty are propagated as decision risk that allows decisionmakers to simultaneously consider uncertainties in remediation/implementation costs while attempting to meet environmental/ecologic targets. We must note that this research is on going. As more data are collected, the HgT and cost-mitigation submodels are updated and the uncertainties may be reduced. Subsequently, the value of using a probabilistic framework for estimating and explicitly stating these uncertainties within a decisionmaking process can be estimated when new data are collected. Future work includes the design and implementation of a Bayesian network decision support system (BN-DSS) to produce mitigation scenarios for offset-project evaluation in the Cache Creek watershed. The decisionmaker, a wastewater-treatment plant, is expected to evaluate potential Hg-offset programs in terms of changes in HgT load changes, MeHg-production potential, project cost, and other suitability criteria. Subsequently, scenarios can be analyzed by performing sensitivity analyses and ranking environmental and economic uncertainties in terms of the decisionmaker’s preferences and risk choices. Such an analysis allows decisionmakers and stakeholders to explore various scenarios and predict the consequences of different stated preferences over outcomes.

Open-File Report↗

Proceedings of the Black-footed Ferret & Prairie Dog Workshop, September 4-6, 1973

Both State and Federal agencies have been working with the black-footed ferret and prairie dog during the past few years. Much of the work is not extensive enough for publication in scientific journals and is, therefore, not reported. The objective of this Workshop was to bring workers together for discussion of the current status of the two species. Each of the Conservation Departments in the states and provinces within the former range of the prairie dog and the black-footed ferret was invited to participate. Federal agencies were also invited to report on current programs in progress on public lands.

Book↗

Achieving water quality goals in the Chesapeake Bay: A comprehensive evaluation of system response

A Comprehensive Evaluation of System Response Achieving Water Quality Goals in the Chesapeake Bay: A Comprehensive Evaluation of System Response (CESR) includes an evaluation of why progress toward meeting the TMDL and water quality standards has been slower than expected and offers options for how progress can be accelerated. This report is a summation of a three year investigation into the 40 year effort to reduce nutrient loads to Chesapeake Bay. History The effort began as a STAC independent initiative in March 2019, after Kurt Stephenson, Zach Easton, and Brian Benham proposed the idea of a report that would identify gaps and uncertainties in system response—physical, chemical, biological, and socioeconomic—that impact efforts designed to attain water quality standards in Chesapeake Bay. As STAC Chair at the time, Benham facilitated the development of a collaborative process that would engage the entire committee. As a first step in approaching the long causal chain that links management actions to their eventual impact on water quality and living resources, workgroups were formed around the subsystems of this chain: nutrient and sediment reductions (watershed), water quality response to nutrient and sediment reductions (estuary) and living resource response to water quality (living resources). Each of these workgroups generated an independent document with a self-determined scope (i.e., workgroups were afforded flexibility to address issues beyond the original objectives). Because the content of each document was both unique and substantial, STAC chose to publish them as stand-alone documents with authorship attribution. In the second step, a steering committee developed a series of framing questions to guide the preparation of this report that would meet the objective of identifying gaps and uncertainties in achieving the Bay TMDL and water quality standards. Coeditors Stephenson and Wardrop, supported to great extent by a subgroup of the Steering Committee (Leonard Shabman, Zach Easton, Jeremy Testa, William Dennison, Kenny Rose, and Mark Monaco) were tasked with assembling ideas and contributions to write a single draft text, drawing material from the aforementioned resource documents, STAC and Chesapeake Bay Program reports, the scientific literature, and a limited amount of additional analyses performed in collaboration with Bay Program scientists. The resulting report was then submitted for several reviews by both steering committee members and the membership at-large to produce a consensus report.

Maryland, Virginia↗

Ecological requirements for pallid sturgeon reproduction and recruitment in the Lower Missouri River: Annual report 2009

The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The general Comprehensive Sturgeon Research Project strategy is to integrate field and laboratory studies of sturgeon reproductive ecology, habitat requirements, and physiology to produce a predictive understanding of sturgeon population dynamics. The project scope of work is developed annually with cooperating research partners and in collaboration with the U.S. Army Corps of Engineers, Missouri River Recovery-Integrated Science Program. The research consists of several interdependent and complementary research tasks engaging multiple disciplines that primarily address spawning as a probable limiting factor in reproduction and survival of the pallid sturgeon. The research is multifaceted and is designed to provide information needed for management decisions impacting habitat restoration, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research activities and progress towards understanding of the species are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by Comprehensive Sturgeon Research Project during 2009.

Open-File Report↗