Search USGS⌕ Search

SEARCH · Search USGS

Results for “New Forests”

Search indexed USGS publications on groundwater, aquifers, geologic maps, mineral resources and earthquakes. Explore source records by subject and place.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31Linked to original sources

New record of the rare emballonurid bat Centronycteris centralis Thomas, 1912 in Costa Rica, with notes on feeding habits

The shaggy sac-winged bat, Centronycteris centralis, occurs mainly in lowland forests from Veracruz, Mexico, to Peru, although it has been reported from elevations as high at 1450 m in Panama. Most captures of the species are of single individuals, and throughout its distribution, this bat is rare and poorly-known. Centronycteris centralis generally has been assumed to be an aerial insectivore, capturing flying insects on the wing. However, direct evidence supporting this trophic role has been lacking. Herein, I report on a specimen of C. centralis from seasonally-inundated swamp forest in the Caribbean lowlands of northeastern Costa Rica that provides valuable information on distribution, morphological variation, reproduction, and feeding habits of this species.

Caribbean Journal of Science↗

Habitat suitability index model improvements

Habitat suitability index (HSI) models were developed for the 2023 Coastal Master Plan to evaluate the potential effects of coastal restoration and protection projects on habitat for key coastal fish, shellfish, and wildlife species. These species included: eastern oyster, brown shrimp, white shrimp, blue crab, crayfish, gulf menhaden, spotted seatrout, largemouth bass, American alligator, gadwall, mottled duck, brown pelican, seaside sparrow, and bald eagle. Most of these species were included in the 2017 Coastal Master Plan analyses, and the HSI models from that effort were refined and improved following the recommendations described in the technical memorandum: 2023 Coastal Master Plan Habitat Suitability Index Model Improvement Recommendations (Sable et al., 2019). In addition to model improvements, HSI models were created for seaside sparrow and bald eagle, both of which are new species for the master plan analyses. For the HSI models that are primarily literature-based, literature reviews were conducted for recent studies that could be used to improve the suitability index (SI) relationships that compose the models. As a result of this review, modifications were made to the salinity-related SIs of the oyster model including: expanding the time period used for salinity effects to spawning; adjusting the range of suitable annual average salinity to be more representative of Louisiana populations; and making oyster’s minimum salinity tolerance temperature dependent. In addition, a new SI was incorporated in the oyster HSI model that accounts for the effects of sediment deposition on oysters. The crayfish HSI model was improved by adjusting the time periods used for the SIs that describe the hydrology required for the crayfish life cycle, and the soil characteristics SI that was part of the 2017 crayfish model was removed because soil conditions do not appear to be limiting for crayfish burrow construction in coastal Louisiana. The other literature-based HSI models from the 2017 Coastal Master Plan, i.e., American alligator, gadwall, mottled duck, and brown pelican, were unchanged, with the exception of a small adjustment made to the suitability of forested wetlands for gadwall. Lastly, a literature-based HSI model was created for seaside sparrow that consists of SIs related to vegetated habitat type, marsh vegetation coverage, and marsh elevation. Statistical-based HSI models were developed for brown shrimp (both small and large juvenile stages), white shrimp (small and large juvenile stages), blue crab (juvenile stage), gulf menhaden (juvenile and adult stages), spotted seatrout (juvenile and adult stages), largemouth bass, and bald eagle. The bald eagle HSI model was developed from a bald eagle nest probability of occurrence model that related nest occurrence from survey data with land cover type. The resulting model showed that combinations of forested wetlands, flotant marsh, and open water habitats were most suitable for nesting bald eagles. The 2023 fish, shrimp, and blue crab HSI models were developed using new approaches for the formulation of the water quality and structural habitat SIs that compose the models. For the 2017 models, the water quality SI was derived using only generalized linear mixed models (GLMMs) to estimate the relationship between salinity, water temperature, and species’ catch. For the 2023 models, however, multiple GLMMs and generalized additive models (GAMMs) were created for each species or life stage. These alternative models were compared and a single model that performed well statistically and was ecologically reasonable was selected for the species’ water quality SI. The structural habitat SI was developed using a meta-analysis of published literature to estimate the relative importance of various estuarine habitats to the fish and shellfish species. The results of this analysis were then used to modify the 2017 structural habitat SI relationship to account for the added habitat value of submerged aquatic vegetation and oyster reefs, which are also important habitats for juvenile fish and shellfish. Similar to the 2017 fish, shrimp, and blue crab models, the water quality and structural habitat SIs were then combined to create the 2023 HSI models. The 2023 Coastal Master Plan HSI models were integrated with the Integrated Compartment Model (and are referred to as ICM-HSIs) and tested using environmental output from the 2017 Coastal Master Plan Future Without Action scenario. The tests showed that, in general, the models produced reasonable representations of species’ habitat distribution. Furthermore, the improvements made to the oyster, crayfish, fish, shrimp, and blue crab HSI models generally yielded more realistic results compared to the 2017 HSI models.

Report↗

Factors controlling nitrogen release from two forested catchments with contrasting hydrochemical responses

Quantifying biogeochemical cycles of nitrogen (N) and the associated fluxes to surface waters remains challenging, given the need to deal with spatial and temporal variability and to characterize complex and heterogeneous landscapes. We focused our study on catchments S14 and S15 located in the Adirondack Mountains of New York, USA, which have similar topographic and hydrologic characteristics but contrasting stream nitrate ($\hbox{NO}_{3}^{-}$) concentrations. We characterized the mechanisms by which $\hbox{NO}_{3}^{-}$ reaches the streams during hydrological events in these catchments, aiming to reconcile our field data with our conceptual model of factors that regulate nutrient exports from forested catchments. Combined hydrometric, chemical and isotopic (δ$\hbox{NO}_{3}^{-}$) data showed that the relative contributions of both soil and ground water sources were similar between the two catchments. Temporal patterns of stream chemistry were markedly different between S14 and S15, however, because the water sources in the two catchments have different solute concentrations. During late summer/fall, the largest source of $\hbox{NO}_{3}^{-}$ in S14 was till groundwater, whereas shallow soil was the largest $\hbox{NO}_{3}^{-}$ source in S15. $\hbox{NO}_{3}^{-}$ concentrations in surface water decreased in S14, whereas they increased in S15 because an increasing proportion of stream flow was derived from shallow soil sources. During snowmelt, the largest sources of $\hbox{NO}_{3}^{-}$were in the near‐surface soil in both catchments. Concentrations of $\hbox{NO}_{3}^{-}$ increased as stream discharge increased and usually peaked before peak discharge, when shallow soil water sources made the largest contribution to stream discharge. The timing of peaks in stream $\hbox{NO}_{3}^{-}$concentrations was affected by antecedent moisture conditions. By elucidating the factors that affect sources and transport of N, including differences in the soil nutrient cycling and hydrological characteristics of S14 and S15, this study contributes to the overall conceptualization of $\hbox{NO}_{3}^{-}$ release from temperate forested catchments.

Hydrological Processes↗

Using indirect methods to constrain symbiotic nitrogen fixation rates: A case study from an Amazonian rain forest

Human activities have profoundly altered the global nitrogen (N) cycle. Increases in anthropogenic N have had multiple effects on the atmosphere, on terrestrial, freshwater and marine ecosystems, and even on human health. Unfortunately, methodological limitations challenge our ability to directly measure natural N inputs via biological N fixation (BNF)-the largest natural source of new N to ecosystems. This confounds efforts to quantify the extent of anthropogenic perturbation to the N cycle. To address this gap, we used a pair of indirect methods -analytical modeling and N balance-to generate independent estimates of BNF in a presumed hotspot of N fixation , a tropical rain forest site in central Rondônia in the Brazilian Amazon Basin. Our objectives were to attempt to constrain symbiotic N fixation rates in this site using indirect methods , and to assess strengths and weaknesses of this approach by looking for areas of convergence and disagreement between the estimates. This approach yielded two remarkably similar estimates of N fixation . However, when compared to a previously published bottom-up estimate, our analysis indicated much lower N inputs via symbiotic BNF in the Rondônia site than has been suggested for the tropics as a whole. This discrepancy may reflect errors associated with extrapolating bottom-up fluxes from plot-scale measures, those resulting from the indirect analyses, and/or the relatively low abundance of legumes at the Rondônia site. While indirect methods have some limitations, we suggest that until the technological challenges of directly measuring N fixation are overcome, integrated approaches that employ a combination of model-generated and empirically-derived data offer a promising way of constraining N inputs via BNF in natural ecosystems.

Biogeochemistry↗

Mercury in fish from streams and rivers in New York State: Spatial patterns, temporal changes, and environmental drivers

Mercury (Hg) concentrations in freshwater fish across the state of New York frequently exceed guidelines considered harmful to humans and wildlife, but statewide distribution and temporal changes are not well known for the state’s streams and rivers. We analyzed existing data to describe recent spatial patterns, identify key environmental drivers, and assess temporal changes. Size classes within sportfishes and prey fishes formed ‘functional taxa’ (FT), and standardized scores were generated from 2007-2016 data for 218 sites. Muscle Hg in >1 sportfish FT exceeded human-health guidelines of 50 ng/g (sensitive populations) and 300 ng/g (general population, GP) at 93% and 56% of sites, respectively, but exceeded 1000 ng/g (a state threshold) at only 10% of sites. Whole-body Hg in >1 prey fish FT exceeded wildlife thresholds of 40 ng/g and 100 ng/g at 91% and 51% of sites, respectively. Environmental drivers of recent spatial patterns include extent of forest cover and storage, the latter an indicator of wetlands. Standardized Hg scores increased with increasing atmospheric Hg deposition and storage across rural ‘upland’ regions of New York. However, scores were not related to atmospheric deposition in more-developed ‘lowland’ regions due to the limited methylation potential of urban landscapes. Comparisons of 2010-2015 sportfish Hg concentrations with those of 1998 and 2000-2005 showed inconsistent temporal changes both among and within eight sites examined. Some recent stream and river fish Hg spatial patterns differed from those of lake-based studies, highlighting the importance of New York’s flowing waters to future Hg monitoring and risk assessment.

New York↗

Level II scour analysis for Bridge 10 (NORWTH00120010) Town Highway 012 Bloody Brook, Norwich, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure NORWTH00120010 on town highway 12 crossing Bloody Brook, Norwich, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, available from VTAOT files, was compiled prior to conducting the Level I and Level II analyses and can be found in Appendix D. The site is in the New England Upland physiographic province in east-central Vermont. The 8.98-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left bank upstream and the left and right banks downstream are forested. The immediate right bank upstream is covered by shrub and brush with pasture on the overbank. Town Highway 12 runs along the valley of Bloody Brook; however, at structure NORWTH00120010 the road crosses Bloody Brook at a 90-degree angle. In the study area, Bloody Brook has a sinuous channel with a slope of approximately 0.014 ft/ft, an average channel top width of 41 ft and an average channel depth of 3 ft. The predominant channel bed materials are gravel and cobble (D 50 is 51.0 mm or 0.167 ft). The geomorphic assessment at the time of the Level I site visit on October 31, 1994, indicated that the reach was unstable. The town highway 12 crossing of Bloody Brook is a 34-ft-long, two-lane bridge consisting of one 30-foot clear span (Vermont Agency of Transportation, written commun., July 29, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The right abutment is protected by sparse type-2 stone fill (less than 24 inches diameter). The channel is skewed 0 degrees to the opening and the opening-skew-to-roadway is 0 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont↗

Level II scour analysis for Bridge 6 (IRASTH00050006) on Town Highway 5, crossing the Black River, Irasburg, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure IRASTH00050006 on town highway 5 crossing the Black River, Irasburg, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files were compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the New England Upland physiographic province of north-central Vermont. The 91.1-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left and right banks are forested and a residence is located on the downstream left overbank. In the study area, the Black River has an incised, sinuous channel with a slope of approximately 0.05 ft/ft, an average channel top width of 116 ft and an average bank-full channel depth of 2.8 ft. The predominant channel bed material is cobble (D 50 is 240 mm or 0.789 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 4, 1994, indicated that the reach was stable. The town highway 5 crossing of the Black River is a 70-ft-long, two-lane bridge consisting of one 65-foot clear span (Vermont Agency of Transportation, written commun., August 2, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. There is also a retaining wall along the upstream side of the road embankments. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 3.0 ft deeper than the mean thalweg depth was observed along the right abutment. The scour hole was 27 feet long, 15 feet wide, and was 2.5 feet below the abutment footing at the time of the Level I assessment. This right abutment had numerous cracks and had settled. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont↗

Level II scour analysis for Bridge 23 (WODSTH00180023) on Town Highway 18, crossing North Bridgewater Brook, Woodstock, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WODSTH00180023 on town highway 18 crossing North Bridgewater Brook, Woodstock, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, available from VTAOT files, was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the New England Upland physiographic division of east-central Vermont. The 4.26-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left and right banks are covered by moderate tree cover. In the study area, North Bridgewater Brook has a sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 38 ft and an average channel depth of 5 ft. The predominant channel bed materials are gravel and cobbles (D 50 is 63.3 mm or 0.208 ft). The geomorphic assessment at the time of the Level I site visit on December 9, 1994 indicated that the reach was laterally unstable. Evidence of the instability included anabranching and extensive stone fill on channel bends. The town highway 18 crossing of North Bridgewater Brook is a 25-ft-long, one-lane bridge consisting of one 22-ft steel-beam span (Vermont Agency of Transportation, written commun., August 3, 1994). The bridge is supported by vertical, concrete abutments with no wingwalls. Type-2 stone fill (less than 36 inches) was noted at the ends of the right abutment and type-1 stone fill (less than 12 inches) was noted at the ends of the left abutment. A stone wall of type-2 and -3 stone fill (less than 36 inches and 48 inches, respectively), carefully placed, protects the upstream right channel bank extending from the bridge to more than 50 feet upstream. Although significant protection has been placed, both abutments are experiencing undermining. The channel is skewed approximately 15 degrees to the opening while the opening-skew-to-roadway is 5 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont↗

Level II scour analysis for Bridge 15 (BRIDTH00220015) on Town Highway 22, crossing Dailey Hollow Branch, Bridgewater, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRIDTH00220015 on town highway 22 crossing Dailey Hollow Branch, Bridgewater, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province of central Vermont in the town of Bridgewater. The 1.73-mi2 drainage area is a predominantly rural and forested basin. In the vicinity of the study site, the left and right banks have dense tree cover. The upstream right bank of Dailey Hollow Branch is adjacent to town highway 22. In the study area, Dailey Hollow Branch has a sinuous channel with a slope of approximately 0.035 ft/ft, an average channel top width of 30 ft and an average channel depth of 4 ft. The predominant channel bed material is cobble with a median grain size (D50) of 108 mm (0.354 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 1 and 2, 1994, indicates that the reach is stable. The town highway 22 crossing of Dailey Hollow Branch is a 22-ft-long, one-lane bridge consisting of one 22-ft. steel-beam span (Vermont Agency of Transportation, written communication, August 24, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. Type-1 stone fill (less than 12 inches diameter) protects the left abutment, but it’s condition was reported as eroded. Type-2 stone fill (less than 36 inches diameter) protects the upstream left wingwall; it’s condition was reported as slumping.The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 0 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.2 ft. with the worst-case contraction scour occurring at the 500-year discharge. Abutment scour ranged from 4.2 to 6.4 ft. The worst-case abutment scour also occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 46 (ENOSVT01080046) on State Route 108, crossing an Unnamed "The Branch" Tributary, Enosburg, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure ENOSVT01080046 on State Route 108 crossing an unnamed "The Branch" tributary, Enosburg, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in north-central Vermont. The 1.55-mi 2 drainage area is in a predominantly rural, pasture and forested basin. In the vicinity of the study site, the surface cover is pasture. In the study area, this unnamed "The Branch" tributary has an incised, sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 45 ft and an average channel depth of 3 ft. The predominant channel bed material is gravel and cobbles with a median grain size (D 50 ) of 42.4 mm (0.139 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 29, 1995, indicated that the reach was laterally unstable. Block failure slumping of bank material was evident at an upstream cut-bank and another minor cut-bank was noted downstream. The State Route 108 crossing of this unnamed "The Branch" tributary is a 25-ft-long, twolane bridge consisting of one 22-foot concrete span (Vermont Agency of Transportation, written communication, March 8, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is zero degrees. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) at the downstream end of the downstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.3 to 0.5 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 4.0 to 8.0 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 12 (FFIETH00030012) on Town Highway 3, crossing the Fairfield River, Fairfield, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure FFIETH00030012 on Town Highway 3 crossing the Fairfield River, Fairfield, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in north-western Vermont. The 7.34-mi 2 drainage area is in a predominantly rural basin with forest on the valley walls and pasture/row crops on the valley bottom. In the vicinity of the study site, the surface cover is row crops with a few trees on the immediate banks. In the study area, the Fairfield River has a meandering channel with a slope of approximately 0.005 ft/ft, an average channel top width of 37 ft and an average channel depth of 6 ft. The predominant channel bed materials are sand and gravel with a median grain size (D 50 ) of 32.5 mm (0.107 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 16, 1995, indicated that the reach was stable. The Town Highway 3 crossing of the Fairfield River is a 24-ft-long, one-lane bridge consisting of one 20-foot concrete span (Vermont Agency of Transportation, written communication, March 8, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 40 degrees to the opening. Although bridge records show an opening-skew-to-roadway of 45 degrees, the skew measured from surveyed points was 30 degrees. At the time of the level I assessment, the left abutment had been undermined and settled into a scour hole at the upstream end. The right abutment footing was exposed but not undermined. The scour protection measures at the site were type-1 stone fill (less than 12 inches diameter) on the downstream right bank, and type-2 stone fill (less than 36 inches diameter) along the entire base of the upstream right wingwall, the upstream banks, and downstream left bank. The type-2 stone fill on the left bank downstream changes to type-1 about 55 feet downstream of the bridge. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.6 to 3.0 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 3.2 to 4.0 ft. at the left abutment and 9.7 to 11.7 feet at the right abutment. The worst-case left abutment scour occurred at the incipient over-topping discharge, which was less than the 100-year discharge. The worst-case right abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Assessing biodiversity in Nuevo Leon, Mexico: Are nature reserves the answer?

The Mexican state of Nuevo Leon, located in the northeastern portion of the country, currently has 26 state and three federal nature reserves covering approximately 4.5% of its land area. These reserves were established for a variety of reasons not necessarily related to conservation purposes. In 2000 in response to a growing concern about the lack of organized conservation reserve planning to protect the important biological and physical features of Mexico, the Mexican Commission for Knowledge and Use of Biodiversity proposed 12 new terrestrial reserves for Nuevo Leon. The new reserves, if established, would increase the proportion of protected lands in the state to almost 24% of the state's land area. We compiled a Geographic Information System (GIS) analysis using digital thematic maps of physical and ecological features to examine how well the existing and proposed reserves incorporated the major biological and physical features of the state. The existing reserves are located primarily in regions with elevations > 1,000-1,500 m, on less productive soils, and are dominated by pine and oak forest cover types. As a result, the state's dominant biotic region - low elevation coastal plain with xeric scrub vegetation - is disproportionately under represented in the current reserve system. The new reserves would expand the protection of biophysical resources throughout the state. However, the inclusion of important resources in the low elevation coastal lands would still be limited.

Nuevo Leon↗

Level II scour analysis for Bridge 6 (BRISVT01160006) on State Highway 116, crossing Little Notch Brook, Bristol, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRISVT01160006 on State Route 116 crossing the Little Notch Brook, Bristol, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province of West-central Vermont in the town of Bristol. The 8.59-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is dense forest except for the downstream left side, which is row crops. In the study area, Little Notch Brook has a sinuous channel with a slope of approximately 0.005 ft/ft, an average channel top width of 32 ft and an average channel depth of 4 ft. The predominant channel bed material is sand and gravel with a median grain size (D 50 ) of 17.4 mm (0.0570 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 13, 1996, indicated that the reach was laterally unstable. The sinuous configuration of the channel with fine bed and bank material, a sharp channel bend upstream, and point bars and cut-banks upstream and downstream of this site are among the primary characteristics, which suggest lateral instability. In addition, there is evidence of streambed degradation at this site. A large eddy was noted at the location where Little Notch Brook enters the New Haven River about 100 feet downstream. There was a large scour hole noted at the location of the eddy, which is likely to remove streambed material at least as quickly as supplied from upstream on Little Notch Brook. Hence, channel degradation may be significant during a flood event. The state route 116 crossing of Little Notch Brook is a 24-ft-long, two-lane bridge consisting of one 21-foot concrete span (Vermont Agency of Transportation, written communication, December 14, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 15 degrees to the opening while the opening-skew-to-roadway is 25 degrees. There was one foot of scour evident along the downstream half of the left abutment footing and some separation of the left abutment wall from the deck above due to settling. The left abutment footing was undermined up to a foot at the downstream end. The scour protection measures at the site were type-1 stone fill (less than 12 inches diameter) on the upstream left bank and type-2 stone fill (less than 36 inches diameter) on the right banks and right wingwalls upstream and downstream of the structure. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 3.2 to 4.3 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 6.0 to 10.0 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Effect of timber harvest on soil carbon storage at Blodgett Experimental Forest, California

Four plots from a mixed conifer forest were similarly cleared, burned, and replanted at various times over 17 years; a plot logged 79 years before sampling was used as a control. The plots had similar slope (2 to 15%, midslope position), aspect (south to southeast), and soil type (Holland series: mesic Haploxeralf; a Gray Brown Luvisol in the Canadian classification system). Twenty sites at each plot were sampled volumetrically by horizon to 20 cm below the organic–mineral soil boundary. Samples were analyzed for bulk density, organic C, and total N. There was an initial loss (15%) of organic C from the soil within 1 to 7 years, likely the result of oxidation (burning and decomposition) and erosion. For 17 years of forest regrowth, the soil continued to lose C (another 15%), probably owing to decomposition of slash material and possibly erosion, despite the slight accumulation of new litter and roots. After 80 years of regrowth, rates of carbon accumulation exceeded rates of loss, but carbon storage had declined and was not likely to recover to preharvest levels. Timber harvest and site preparation dramatically altered soil C and N distribution, in which C/N ratios after site preparation were initially high throughout the upper 20 cm. Subsequently, C/N ratios became lower with depth and with recovery age. Although stocks of C and N varied considerably among the plots and did not change consistently as a function of recovery age, the C/N ratios did vary systematically with recovery age. We hypothesize that the amount of C ultimately stored in the soil at steady state depends largely on N reserves and potentials, which appear to vary with erosion, intensity of burning, and site treatment.

California↗

Evaluating management alternatives for Wyoming elk feedgrounds in consideration of chronic wasting disease

Executive Summary The authors used decision and modeling analyses to evaluate management alternatives for a decision on whether to permit Cervus canadensis (elk) feeding on two sites on Bridger-Teton National Forest, Dell Creek and Forest Park. Supplemental feeding of elk could increase the transmission of chronic wasting disease (CWD) locally and disease spread regionally, potentially impacting elk populations over time with wider implications for Odocoileus hemionus (mule deer) and Odocoileus virginianus (white-tailed deer) populations and hunting, tourism, and regional revenue. Supplemental feeding is thought to improve overwinter elk survival and reduce the commingling of elk with cattle during months when brucellosis transmission risk is highest. We worked with the U.S. Department of Agriculture Forest Service to identify their fundamental objectives and associated performance metrics related to this feedground decision. We then developed disease and habitat selection models to quantify the effect of four management alternatives on select performance metrics. The four alternatives were to continue to permit feeding, phaseout permits to feed in three years, permit feeding on an emergency basis, or stop permitting feeding. In this report, we present methods and summarized results on disease and habitat selection models and summaries of other performance metrics analyzed by BIO-WEST, Inc. and Cirrus Ecological Solutions as part of an Environmental Impact Statement. Data from Wyoming Game and Fish Department (WGFD) supported the assumption that supplemental elk feeding allows for larger elk populations in a region. We documented that herd units (HU) without feedgrounds had 23 percent lower densities of elk per area of winter range when compared against HUs with feedgrounds, after accounting for differences in sightability of elk during counts on and off feedgrounds. Thus, throughout our analyses, we assumed feedground closures would reduce elk carrying capacity resulting in an average decline of previously fed elk population segments by 23 percent (5th and 95th percentiles = [11 percent, 35 percent]) by year 20. Most of that decline occurred within the first few years after a feedground ceases to operate. We used a panel of CWD experts to help estimate CWD trans-mission in fed and unfed elk population segments. In aggregate, the expert panel estimated that median values of direct and indirect transmission of CWD are expected to be 1.9 and 4 times higher, respectively, in fed elk populations compared to unfed elk. We used these disease transmission estimates in combination with local elk demographic rates and carrying capacity estimates to project disease and population dynamics. In year 20, we predicted CWD prevalence would increase to 42 percent (5th and 95th percentiles = [29 percent, 55 percent]), and 13 percent (5th and 95th percentiles = [4 percent, 26 percent]) on average for fed and unfed elk population segments, respectively, given a starting prevalence of 1.6 percent. The prevalence estimates for the unfed elk population segments are in the range of previous observations of CWD in elk in the western United States. The average CWD prevalence from 2016 to 2018 in the unfed elk population of Wind Cave National Park in South Dakota was 18 percent overall but up to 30 percent in some regions (Sargeant and others, 2021). Meanwhile, CWD prevalence in the Iron Mountain and Laramie Peak elk herds in Wyoming from 2016 to 2018 was 14 percent and 7 percent, respectively, despite being present since at least 2002 (Wyoming Game and Fish Department, 2020b). From 2016 to 2020, elk that were fed at Dell Creek and Forest Park constituted on average 12–20 percent of the total elk on their respective HUs. As a result, the differences between management alternatives are modest when considering the closure of only one feedground on a HU. The no feeding alternative for Forest Park resulted in a CWD prevalence of 17 percent (SD = 7 percent) in the Afton HU compared to 20 percent (SD = 7 percent) with continued feeding by year 20. In the Upper Green River HU, no feeding on Dell Creek resulted in a CWD prevalence of 27 percent (SD = 6 percent) compared to 30 percent (SD = 5 percent) with continued feeding. In terms of disease-associated mortality, we predicted the closure of Forest Park and Dell Creek feedgrounds would reduce the total number of CWD mortalities by 9 percent in the Upper Green River HU and 26 percent in the Afton HU during the 20-year timespan. Our spatial analyses predicted that management alternative effects vary by HU as a function of private property and other wildlife winter ranges proximity relative to feedground location. The predicted number of elk abortions on private land, as a proxy for brucellosis risk to cattle, may increase by 8–21 percent in the absence of feeding at Dell Creek and Forest Park. Eight feedgrounds are located on Bridger-Teton National Forest, all of which have permits that have expired or will expire prior to 2028. In addition, WGFD could change their management of feedgrounds given new information; therefore, we also assessed the cumulative effects of continued feeding, phaseout, and no feeding management alternatives across five HUs south of Jackson, Wyoming (Afton HU, Fall Creek HU, Piney HU, Pinedale HU, and Upper Green River HU). These five HUs ranged from about 41 to 85 percent of the elk herd using feedgrounds, which corresponded to a CWD prevalence at year 20 of 23–34 percent if all feedgrounds in those five HUs remained open relative to 12 to 14 percent if all feedgrounds were closed. We predicted feedground closures may result in immediate reductions in population size relative to alternatives that continue feeding (for example, continued feeding and emergency feeding alternatives); however, over longer periods of time, CWD-associated mortality leads to larger population reductions. The no feeding alternative resulted in higher elk population sizes compared to the continued feeding alternative after about 10 years of implementation. Delayed action under a phaseout alternative resulted in increasing the CWD prevalence to 20 percent relative to 12 to 14 percent, on average, without feeding on HUs with a large population of fed elk such as the Upper Green River HU. Summarizing our cumulative results across all five of the analyzed HUs, we predicted continued feeding will lead to fewer elk by year 20 (mean = 8,300, standard deviation [SD] = 740) compared to no feeding at U.S. Department of Agri-culture Forest Service sites (10,700, SD = 890). The closure of all feedgrounds was projected to result in the largest elk populations at year 20 (12,500, SD = 980). No feeding at all sites also resulted in the largest cumulative harvest of 57,700 (SD = 2,600) compared to 51,100 (SD = 3,800) for continued feeding at all current feedground sites on the five HUs. Continued feeding also resulted in the lowest brucellosis costs to producers ($194,600, SD = $11,500) compared to no feeding on all feedgrounds ($243,000, SD = $13,700). Assuming moderate reductions in hunter interest because of increasing CWD prevalence in elk, we predicted that no feeding resulted in regional revenues generated by hunting activities of $190 million (SD = $10 million) compared to $173 million (SD = $10 million) for continued feeding over the 20-year timeframe. Recent CWD detections in mule deer and elk in Grand Teton National Park has elevated the importance of the cur-rent decision on whether, and how, to permit elk feeding on Dell Creek and Forest Park and the management of the other feedgrounds. Aggressive male harvest has slowed, but not stopped, the increasing prevalence of CWD in mule deer (Conner and others, 2021). It is unclear whether harvest management can be an effective tool to slow the spread of CWD in elk. There are also no effective treatments or vaccines for CWD, and it is unlikely that any will be developed that can be easily deployed in the near future. Thus, reducing artificial aggregations is one of the few management approaches suggested by the Western Association of Fish and Wildlife Agencies (Almberg and others, 2017). Future surveillance and monitoring can be designed to resolve uncertainties that can improve future decision-making. If feedgrounds close, research could quantify elk population reductions in the absence of feeding, the redistribution of fed elk to other places, or the consequences of elk movement on private property. If feedgrounds remain open, research could assess how rapidly CWD spreads in artificial aggregations of elk; however, surveillance programs would need to be designed with sufficient power to detect initial changes of CWD prevalence. Delaying action on feedground management was projected to be costly. Results of the phaseout alternative relative to the no feeding alternative suggested a 3-year delay was enough for substantial long-term changes in CWD prevalence. The long-term persistence of infectious CWD prions in the environment suggests that feedground management decisions may have long-lasting consequences. Our results indicated tradeoffs in the ability of a management agency to achieve all their objectives, and all management alternatives resulted in significant reductions in elk population size. This report contains the foundational elements for formal decision analysis methods, which can be implemented to help decision makers transparently evaluate the consequences of decision alternatives and identify the set of actions that best achieve agency and stakeholder priorities.

Wyoming↗

2018 Kaua'i forest bird population estimates and trends

Kaua‘i's native forest birds have experienced steep declines since the beginning of systematic surveys in 1981, and declines have accelerated in recent decades. This report details the analysis of the most recent surveys conducted in 2018. Incorporating the new survey results, long-term trends continue to show sharp declines for all native honeycreeper species with the exception of ‘apapane (Himatione sanguinea), which has stable numbers in core areas of its range. Kaua‘i ‘elepaio (Chasiempis sclateri) continued to decline in the outer portions of its range but increased in the core areas of its range. Abundance estimates of forest birds ranged from slightly higher to slightly lower in most species, indicating a relatively stable period from 2012–2018, and a pause from the rapid declines seen in earlier periods. Many native species now exist in very low numbers, and variation in estimates from survey to survey will increase.

Hawaii↗

Millennial-scale climatic and cultural impacts on vegetation and fire at the southern edge of the Rocky Mountains, USA

Mountain forests and woodlands in semiarid regions of the world are threatened by climatic change and other human impacts. In the southwestern USA, climate and culturally driven changes to the structure and fire regimes of dry coniferous forests over recent centuries are well documented by tree-ring archives. However, the roles of climate and people as drivers of millennial-scale changes are less understood. We present a new record of vegetation dynamics and regional fire activity inferred from pollen, microscopic charcoal, and sediment geochemistry from Santa Fe Lake, NM (3532 m a.s.l.), the southernmost natural lake in the Rocky Mountains. Declining elemental intensities (e.g., Ti, Fe, Si) record local deglaciation after 14,000 cal yr BP followed by upslope expansion of trees indicated by increasing Pinus and Picea pollen percentages as the climate warmed during the Late Glacial. Cool, dry growing seasons probably limited the establishment of dense forests until after 12,200 cal yr BP when we hypothesize that Pinus ponderosa (ponderosa pine) expanded regionally (i.e., within 10–100 km) due to continued warming and a possible increase in monsoonal precipitation. Subalpine forests established near Santa Fe Lake by 10,300 cal yr BP as indicated by abundant conifer stomates and increasing Picea and Pinus aristata pollen percentages, which are highest after 5100 cal yr BP. Increasing Juniperus -type, Quercus , and Pinus edulis -type pollen record changes in vegetation belts at lower elevations after 10,300 cal yr BP. Maize pollen, an unambiguous indicator of Puebloan agriculture, first appears at 800 cal yr BP (1150 cal yr CE) and is present through 1600 cal yr CE when Spanish colonization brought cultural upheaval and population loss to local indigenous communities. Regional fire activity, inferred from microscopic charcoal influx, remained relatively constant for most of our record. However, average microscopic charcoal influx more than doubled relative to the rest of the Holocene during the last 2000 years, with the highest influx after 1550 cal yr BP (400 cal yr CE). The increased influx of microscopic charcoal coincides with archaeological evidence for dramatic regional population growth in the northern Rio Grande region and probably reflects extensive cultural burning associated with the development of an agricultural economy. Although climate was an important driver of vegetation change and fire regimes in the mountains of the southwestern USA during the Holocene, our results suggest that human impacts on regional burning during the last 2000 years far exceeded earlier climate-driven variation.

Rocky Mountains↗

A test of the variable circular-plot method where exact density of a bird population was known

Variable circular-plot (VCP) counts are statistically more sound than point counts because they are adjusted for the probability of detecting birds at different distances and under different conditions. However, many ornithologists use point counts rather than VCP counts because they believe that assumptions of the VCP method are almost always violated, leading to poor results, and because earlier field tests using ad hoc analysis methods gave variable and relatively poor results. We conducted the first field test of the VCP method where the exact density of a forest bird was known as part of re-establishing the 'Oma'o Myadestes obscurus in former range. All 'Oma'o in the new population were intensively monitored by radio telemetry so that the number present during four VCP censuses was known. Excluding the first census, when three of the four detections were of the same individual, differences in VCP density estimates ranged from -34% to +24% (mean 0%) even though =18 'Oma'o were detected per survey. We review critical assumptions of the VCP method and make recommendations for data analysis based on our experience with the method on Pacific islands.

Pacific Conservation Biology↗