Search USGSSearch

SEARCH · Search USGS

Results for “Enviornmental Monitoring and Assessment”

Search indexed USGS publications on groundwater, aquifers, geologic maps, mineral resources and earthquakes. Explore source records by subject and place.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,661 records · Page 3Linked to original sources

Hydrologic investigations and a preliminary conceptual model of the groundwater system at North Penn Area 1 Superfund Site, Souderton, Montgomery County, Pennsylvania

The U.S. Geological Survey (USGS) conducted hydrogeologic investigations, reviewed existing data, and developed a preliminary conceptual model of the groundwater system as part of technical support of the U.S. Environmental Protection Agency (EPA) at the North Penn Area 1 Superfund Site (hereafter, the NP1 Site) located within the Borough of Souderton in Montgomery County, Pennsylvania. Field work and monitoring took place during 2012–18. The area is underlain by sedimentary formations that form a fractured-rock aquifer used for drinking water and industrial supply. The EPA placed the Site on the National Priorities List in 1989, identifying tetrachloroethylene (PCE) and trichloroethylene (TCE) as contaminants of concern. During 2012–18, the USGS conducted field activities that included drilling an 82-foot (ft)-deep monitoring well (MG 2220) in 2016, reconstructing a 208-ft-deep former industrial production well (MG 668 [Granite Knitting Mill]), and collecting borehole geophysical and video logs and water levels from those and five additional wells, which ranged in depth from about 50 to 200 ft below land surface. Continuous water levels were collected during 2014–17, and a synoptic set of water levels were measured in April 2018 in the seven wells. The borehole geophysical logs (caliper, acoustic televiewer, natural gamma, single-point resistance, vertical flow, and fluid temperature and resistivity) and borehole video logs in the seven wells were evaluated to assess potential for lithologic correlation and to identify and describe water-bearing features, which included both low- and high-angle fractures and other openings oriented along dipping bedding planes, joints, or possible faults. Borehole geophysical logs collected by USGS in 1992 in a 300-ft-deep former production well near the Site were also evaluated. Few to no distinctive features were identified on geophysical logs (natural gamma and single-point resistance) that could be used for correlation, thus limiting this approach to determining local geologic structure. Extensive fracturing in the upper 62 ft of monitoring well MG 2220 indicates that the well was likely drilled through a zone of faulting, and other evidence of faulting is present in the area near the Site. Assessment of continuous water levels showed hydraulic connections among some wells as indicated by rising or falling water levels in response to changes in pumping rates at nearby wells. A map of water levels measured in April 2018 indicates potential for groundwater flow generally toward the stream to the south and southwest of the Site, but the limited water-level data are insufficient to describe vertical groundwater gradients or lateral gradients in any detail. Review of 1999–2022 volatile organic compound (VOC) monitoring data collected by the Pennsylvania Department of Environmental Protection for five monitoring wells indicates that the highest groundwater concentrations of PCE and TCE were found in samples from extraction well MG 2201 (S-1) downgradient from, and nearest to, the previously identified Site contaminant source area, and these concentrations fluctuated through time. PCE concentrations were higher than TCE concentrations in samples from all five monitoring wells and were much higher than TCE concentrations in samples from extraction well MG 2201 (S-1). Temporally variable recharge is a possible factor affecting observed fluctuations in PCE concentrations in groundwater samples from well extraction MG 2201 (S-1), as indicated by a general inverse relation between PCE concentrations and water levels in a nearby long-term observation well. The PCE concentration of 1,830 micrograms per liter (μg/L) in a May 2018 water sample from monitoring well MG 2220 was more than four times the PCE concentration of 444 μg/L in a December 2017 sample from the nearby extraction well MG 2201 (S-1), which is open to fewer fractures. Low concentrations of VOCs were measured in surface water at two stream sites downgradient from wells with the highest groundwater VOC concentrations at the Site, indicating that discharge of contaminated groundwater to the stream is likely. Development of a conceptual model of the groundwater system was constrained by limited data. In areas with no pumping, groundwater-flow directions generally are thought to be controlled by topography and geologic structure (bedding orientation) and likely to the south and southwest of the Site, with local flow directions affected by orientations of fractures, joints, and local faults. Additional investigations that could help improve the conceptual model of the groundwater system and help delineate the extent of groundwater contamination and its transport are discussed.

Pennsylvania

A practical decision tool for marine bird mortality assessments

Given the rise in anthropogenic, environmental, and disease events contributing to marine bird mortality, there is a critical need to improve the rigor of mortality assessments. Deficits in data collection and mortality estimation can hinder a manager’s ability to document the scale of events and assess population level impacts. Therefore, to inform decisions required during activities, such as conservation status assessments or harvest management, organizations may choose to incorporate mortality assessments into response plans. Resources, capacity, and assets to assess mortality vary across jurisdictions (federal, state, Indigenous, local, etc.), and clear guidance to support mortality assessments is often unavailable or not clearly addressed. Here, we present a decision support tool to help managers identify and evaluate survey options to assess bird mortality in a diverse array of scenarios. The objective of the decision tool is to improve data collection and availability, which will increase the ability to estimate mortality robustly, given situation-specific attributes and constraints. This decision tool is designed to guide the response when a mortality event is initially encountered and offers suggestions for assessment and reporting procedures in the absence of other guidance or to complement existing protocols. The decision tool is also meant to inform decision making for response determination and resource allocation. The tool facilitates examination of options for further assessment and monitoring, which users determine by examining questions pertaining to species prioritization, determination of mortality minimum spatial extent, and the potential magnitude of impacts on affected species. Finally, identification of appropriate survey methods that address imperfect detection when a complete census is not possible are determined by exploring location, spatial and temporal extent, and the type of species affected. Ultimately, this decision tool aims to facilitate and improve the standardization of mortality assessments, equipping managers with a practical resource to navigate the decision-making process for marine bird mortality estimation.

Ornithological Applications

Wind River subbasin restoration: Annual report of U.S. Geological Survey activities January 2024 through December 2024

We sampled juvenile wild Oncorhynchus mykiss (Steelhead Trout) in headwater streams of the Wind River, Washington, to characterize population attributes and investigate life-history metrics, particularly migratory patterns, and early life-stage survival. Additionally, this sampling provides an index of abundance of non-native Brook Trout Salvelinus confluentus . We used passive integrated transponder (PIT) tagging and a series of instream PIT-tag interrogation systems (PTISs) to track juveniles and adults. The Wind River subbasin is considered a wild Steelhead refuge by Washington Department of Fish and Wildlife (WDFW). No hatchery Steelhead Trout have been released in the Wind River subbasin since 1997, and hatchery adults are estimated at less than one percent of spawners in most years. Over 25 years of Steelhead Trout status and trend monitoring and research in the subbasin is contributing to understanding of population response to numerous restoration actions in the subbasin, including removal of Hemlock Dam from Trout Creek in 2009, which had an inadequate adult ladder and contributed to increased water temperatures, to near lethal levels for salmonids. Data from our study, and companion work by WDFW, are contributing to the Columbia Basin Fish and Wildlife Program (2009) Research, Monitoring, and Evaluation (RM&E) Strategy of Fish Population Status Monitoring. Specifically, this work addresses the sub-strategies of 1) Assessing the Status and Trends of Diversity of Natural Origin Fish Populations and Uncertainties Research regarding differing life histories of a wild Steelhead Trout population, 2) Assessing the Status and Trend of Adult Natural Origin Fish Populations, and 3) Monitoring and Evaluating the Effectiveness of Tributary Habitat Actions Relative to Environmental, Physical, or Biological Performance Objectives. During summer and fall 2024, we PIT-tagged 2,075 Steelhead Trout parr (age-0 and age-1), in the Trout Creek and upper Wind River watersheds. Age-0 and age-1 parr were at high abundance due to strong spawner numbers in 2023 and 2024 (Estimate of 932 in 2023; and a moderate number of spawners in 2024 though an estimate is not available at this time; 24-year median = 619; Charlie Cochran, WDFW Fish Biologist, personal commun., 2025). An additional 100 parr (age-0 and age-2 or older) were tagged to provide fish for estimating detection efficiencies at PTISs. Steelhead Trout parr were recaptured and detected through repeat headwater sampling, smolt trapping, instream PTISs and Columbia River mainstem PIT-tag detection. We maintained and upgraded six instream PTISs to detect PIT-tagged Steelhead Trout parr, smolts, and adults, providing data for population assessments, and life-cycle research. Detection data from PIT-tagged adult Steelhead Trout at our four primary PTISs allow assessment of adult escapement to tributary watersheds within the Wind River subbasin. Most adult Steelhead detected were tagged by WDFW at an adult trap in the lower Wind River and some as smolts at screw traps. Adult Steelhead Trout detection efficiency estimates at our primary PTIS in Trout Creek have been greater than 99 percent during eight of the past ten years and have exceeded 97% at our primary PTIS in the Wind River during nine of the past ten years. Adult escapement estimates to tributary watersheds are helping evaluate the efficacy of the 2009 removal of Hemlock Dam from rkm 2.0 of Trout Creek. Detections at the instream PTISs have shown trends of age-0 and age-1 Steelhead Trout parr emigration from natal areas during summer and fall, in addition to the expected movement of parr and smolts in spring. Our data suggest that most fish from a cohort that migrate downstream will do so at age-1 for additional rearing in the subbasin. We have estimated that from 15% to 56% of parr tagged as age-0 fish in headwater areas make downstream migrations at age-1 for additional rearing (median = 29%). We have estimated that from 1% to 27% of Steelhead Trout parr, tagged as age-1 fish, make downstream migrations during fall (median = 3.5%): this is especially pronounced in the upper Wind River portion of the watershed (median 10%). These findings raise questions about parr rearing habitat and whether migrations are density- or habitat-quality driven, and answers to such questions are long-term goals of this study as active and passive habitat restoration occurs. Repeat sampling at sites in the subbasin within and between years has enabled assessment of juvenile Steelhead Trout growth patterns. Growth rates (relative change in weight) of age-0 PIT-tagged parr during summer have been similar across the subbasin, though slightly lower in the Trout Creek watershed (Trout Creek sites, 0.57 - 1.25%/day, Wind River sites = 0.94 – 2.48%/day). Summer growth rates have been lower for age-1 parr in the Trout Creek watershed than the upper Wind River watershed (Trout Creek sites, = 0.03 - 0.14%/day, Wind River sites = 0.05 – 0.19%/day). Yearly relative growth was similar across the subbasin for both age-0 and age-1 tagged parr. During 2024 range of mean daily relative change in weight from the previous year for age-0 tagged fish was: Trout Creek sites = 0.96 – 1.41%/day, Wind River sites = 0.80 – 1.30 %/day; and for age1 tagged fish was: Trout Creek sites = 0.37 - 0.50 %/day, Wind River sites = no age-1 tagged recaptures. Non-native Brook Trout are present in the subbasin, chiefly the Trout Creek watershed. Mean percent-of-catch that is Brook Trout, at four sample sites in Trout Creek, has declined from the period 1998 – 2003 to the period 2011 – 2024 (range of decrease = 19 - 82%). Percent-of-catch (of 64 samples, 52 < 10%; 3 > 20%) and number of Brook Trout at the Trout Creek sites from 2011 through 2024, though variable, have generally declined. Habitat restoration evaluation efforts are critical to ensure efficient use of money and resources but require long-term monitoring of population metrics. Detailed viable salmonid population and life-history data, such as that provided by PIT-tagging and instream PTIS networks inform fisheries policy and management and enable assessment of long-term effects of habitat restoration actions such as the removal of Hemlock Dam on Trout Creek and proposed major instream habitat restoration in the upper Wind River.

Washington

The U.S. Geological Survey National Water Quality Network—Groundwater—2023

The U.S. Geological Survey (USGS) operates a National Water Quality Network (NWQN) to monitor trends in groundwater quality and assess emerging contaminants of concern. It is a “network of networks” with 81 subnetworks being sampled on a decadal time scale. Each year, eight of the subnetworks are sampled. Subnetworks have 20–30 wells each and include studies of domestic supply wells or shallow groundwater (20–50 feet deep) underlying urban land use or agricultural land use. Currently there are 2,114 wells in the network.

conterminous United States

Simulation of groundwater flow in the Silurian aquifer, eastern Iowa, 2020–45

The Silurian aquifer is an important water source for municipalities, industry, and rural households and communities in eastern Iowa, including Johnson County. Increasing demand for groundwater from the aquifer indicated that analytical tools may be beneficial to quantify groundwater resources and inform water-management decisions for the aquifer. The U.S. Geological Survey, in cooperation with the Johnson County Board of Supervisors, developed conceptual and numerical groundwater models to simulate water levels in the Silurian aquifer, determine groundwater budgets, and forecast changes in groundwater levels through 2045. A MODFLOW numerical model was constructed to match water levels for 2020 through 2022. Model performance was assessed by comparing simulated and observed water-level hydrographs at several pumping and monitoring wells. Hydrograph comparison indicates that the model simulates water levels accurately at monitoring wells that are not near areas of pumping and generally overpredicts water levels near pumping wells, while accurately simulating the drawdown trend over time at pumping wells. This transient model framework was then used to predict water levels through 2045 in a scenario of moderate drought and increased groundwater withdrawals. Results from the predictive model indicate as much as 13 meters of additional drawdown in 2045 from 2020 water levels in the area of pumping wells.

Iowa

Using probability difference to compare streamflow information of alternatives for efficient operation of monitoring networks

Efficient operation of streamflow monitoring networks requires investments in technology and labor that provide the greatest benefits from available resources. Economic analyses comparing the costs and benefits from different types of alternatives for monitoring have not been practical to implement. Streamflow information provides a generic measure of benefits that can be incorporated into operational decisions as an objective for monitoring networks. A methodology for comparing how accuracy, monitoring period, and monitoring instead of modeling affects streamflow information is developed from information-theoretic approaches for network design but contributes three novel features: (1) a probability-difference model for conditional probability of monotonically paired variables, (2) explicit discounting of unverified information that may exceed the accuracy of streamflow records, and (3) run analysis to account for non-stationarity in streamflow probabilities. Application of the methodology to the U.S. Geological Survey streamflow monitoring network indicates the value of monitoring period to reduce the uncertainty of streamflow probabilities and, thus, increase streamflow information. The methodology has important limitations, particularly for sites with non-perennial streamflow, but demonstrates that probability difference could be used to evaluate operational alternatives to increase the efficiency of monitoring networks.

PLOS Water

Examining the compositional selectivity of hydrocarbon oxidation products using liquid–liquid extraction and solid-phase extraction techniques

The effect of extraction methods on detecting hydrocarbon oxidation products (HOPs) in groundwater remains unclear. HOPs are polar, water-soluble byproducts of petroleum biodegradation. Our previous work showed that liquid–liquid extraction (LLE), a method commonly used in regulatory monitoring, has a significantly lower extraction efficiency for HOPs compared to solid-phase extraction (SPE). In this study, we evaluate the analytical limitations and compositional selectivity of LLE and SPE using groundwater samples from the Bemidji, MN, crude oil spill site. Optical properties were characterized using excitation–emission matrix spectroscopy (EEMs), and a three-component PARAFAC model was validated, showing consistent trends across both extracts and whole water samples. Ultrahigh-resolution mass spectrometry (UHR-MS) revealed that LLE selectively recovered aliphatic-like compounds but underrepresented more polar oxygenated HOPs. In contrast, SPE methods were more effective at isolating highly oxidized compound classes. These differences were consistent across a gradient of contamination. Overall, the LLE was less precise and less representative of polar HOPs, introducing bias in the characterization of HOPs. This study is the first to quantitatively demonstrate the compositional selectivity and analytical bias of LLE versus SPE for HOPs using combined EEM-PARAFAC and UHR-MS techniques, with implications for long-term monitoring and site assessment protocols.

Environmental Science and Technology

U.S. Geological Survey Monitoring Milestones—Oe-151 at Woodgate, NY (433112075091501)

On July 9, 1926, monitoring well Oe-151 at Woodgate, New York (USGS ID 433112075091501) recorded its first groundwater data. Since then, the well has provided water data nearly continuously and has now reached a 100-year milestone for data collection. The well is part of the U.S. Geological Survey (USGS) Climate Response Network (CRN), which is a national network of wells selected to monitor natural groundwater conditions. Well Oe-151 is the first well in the network to reach a 100-year Centennial milestone.

New York

Rapid seismic and infrasound assessment of large landslides: A case study from Denali National Park and Preserve (Alaska)

Large, rapid landslides are a global hazard that can occur in remote, mountainous areas. Eyewitness reports of landslides and satellite imagery can often be limited or delayed, particularly during inclement weather. However, landslide-generated seismic and infrasound (low-frequency atmospheric sound) waves can be remotely detected in near real-time. This information can significantly expedite characterization and possible landslide response activities. Here, we highlight these capabilities using a > 4 million m³ ice–rock avalanche in Denali National Park and Preserve (Alaska). This event was detected via a landslide-specific seismic location and volume estimation algorithm deployed in Alaska, and — notably — by standard earthquake monitoring systems. Following rapid detection of this event, we combined its seismic and infrasound dataset with optical, synthetic aperture radar, and oblique aerial imagery, multitemporal digital elevation models, and a numerical flow model to reconstruct its failure timeline and dynamics. We apply array processing to infrasound signals traveling > 250 km and find that two precursory events occurred minutes prior to the main failure. We use long-period seismic signals to infer the force exerted by the landslide on the Earth and constrain the rheological parameters of our numerical flow simulation with this result and deposit morphology. The main failure produced a steeply-dipping impulsive initial downward force and reached speeds exceeding 60 m/s. This impulsive force generated relatively strong seismic body waves, which contributed to the earthquake system detection. This large, remote Alaska landslide underscores the key value of seismic and infrasound analysis for rapid landslide assessment and motivates efforts to further operationalize these approaches.

Alaska

Multidecadal change in pesticide concentrations relative to human health benchmarks in the Nation’s groundwater

Groundwater-quality trend assessments identify aquifers that are responding to changes in pesticide use and the compounds that may pose a threat to water availability. The U.S. Geological Survey has been monitoring pesticide concentrations in groundwater for 25 principal aquifers across the conterminous United States since 1993. The groundwater well locations represent a range of soils, climate, and landforms. The wells are used to monitor groundwater underlying selected agricultural and urban settings and groundwater used for domestic supply. This study examined changes in relative concentrations, defined here as the percentage of wells with pesticide concentrations exceeding a human health benchmark (HHB). HHBs used in this report are legally enforceable drinking-water standards and nonenforceable drinking water levels. Relative pesticide concentration increases may lead to decreased water availability, as restrictions may be put in place for groundwater used as a drinking-water source. This study focused on concentration changes in 22 pesticides that were included in laboratory analysis from 1993 to 2023. The analysis and interpretation of these pesticide concentrations in groundwater have been separated into approximate decadal intervals (decade 1 (1993–2001), decade 2 (2002–12), and decade 3 (2013–22). For one pesticide, 1,2-dibromo-3-chloropropane (DBCP), concentration data were also collected in decade 4 (2023–onward). Atrazine, deethylatrazine, alachlor, prometon, and simazine were 5 pesticides detected at moderate concentrations (greater than 10 percent of the HHB but less than or equal to the HHB). The percentage of wells that had groundwater pesticide concentrations in the moderate concentration category decreased from 7 percent in decade 1 to 2 percent in decade 3. The agricultural networks had the highest percentages of wells with moderate concentrations, and these percentages decreased from 13 percent in decade 1 to 4 percent in decade 3. Moderate concentrations in the urban networks decreased between decades 1 and 2 from 4 percent to 0 percent. No moderate concentrations occurred in the urban networks in decade 3. The percentage of wells with moderate concentrations in the domestic supply networks (1 percent) was the lowest of all the network types and did not change across the three decades. Moderate atrazine or deethylatrazine concentrations occurred across all three decades in aggregated ecoregions representing similar soils, climate, and landforms in the Semiarid West, Midcontinent, and Northeastern United States. Moderate concentrations of prometon, alachlor, and simazine also occurred in the Midcontinent, Arid West, Northeast, South Atlantic Gulf, and Semiarid West regions, but the moderate concentrations did not persist across all three decades. DBCP was the only pesticide that exceeded its respective HHB, and the exceedances occurred across all four decades. In this report, the DBCP analysis was limited to one well network in the Central Valley, California. Agricultural use of DBCP was suspended in 1977. Forty-five years after being banned, DBCP concentrations were greater than the maximum contaminant level of 2 micrograms per liter (μg/L), but the number of exceedances decreased from 50 percent to 15 percent of the samples between 1993 and 2023. This assessment of decadal groundwater pesticide concentrations provides a characterization of changes in water availability because of pesticide contamination in areas where groundwater is used as a drinking-water source. The results highlight the importance of continued long-term monitoring and assessment of groundwater pesticides to identify locations and specific compounds that may pose a potential risk to human health.

continental United States

Geochemical monitoring of volcanic fluids in the twenty-first century

This chapter reviews the state-of-the-art of geochemical volcano monitoring techniques. We cover in-situ monitoring technologies that rely on sampling fluids (direct sampling) and on instrumental analysis of the composition of such fluids in real-time (remote sensing of volcanic fluids is covered elsewhere in this book). We first review key concepts and principles in the field, and then review the results of some selected case studies and applications. We cover the large variety of fluid categories emitted by volcanoes, in both the near-(crater fumaroles and lakes, and plumes) and far-(degassing soils, groundwaters) fields. Our aim is to demonstrate the utility of measuring the chemistry of fluids released by volcanoes, and how these can help characterize volcano unrest, and eventually the increased likelihood of eruption. We conclude with a brief discussion of current challenges and knowledge gaps, and on future directions in geochemical monitoring.

Book chapter

2024 Surprise Inlet landslides: Insights from a prototype landslide‐triggered tsunami monitoring system in Prince William Sound, Alaska

Alaska's coastal communities face growing landslide hazards owing to glacier retreat and extreme weather intensified by the warming climate, yet hazard monitoring remains challenging. As part of ongoing experimental monitoring in Prince William Sound, we detected three large landslides (0.5–2.3 M m 3 ) at Surprise Inlet on 20 September 2024, within the span of an hour. These events were identified in near real-time through seismic data and later confirmed using satellite imagery, tidal records, and infrasound. The landslides generated a modest tsunami, and a 4 cm wave was recorded by a tide gauge 18 km away, marking the first recorded landslide to reach water since monitoring began in this region in 2021. Here, we examine the detection and interpretation of these landslides using multiple data sources and modeling. We demonstrate the effectiveness of this regional seismic monitoring system and show how complementary instrumentation, where available, can enhance detection capabilities.

Alaska

Reservoir evolution, downstream sediment transport, downstream channel change, and synthesis of geomorphic responses of Fall Creek and Middle Fork Willamette River to water years 2012–18 streambed drawdowns at Fall Creek Lake, Oregon

Executive Summary Chapter A. Introduction Fall Creek Dam impounds Fall Creek Lake, a 10-kilometer-long reservoir in western Oregon and is operated by the U.S. Army Corps of Engineers (USACE) primarily for flood-risk management (or flood control) in late autumn through early spring months, as well as for water quality, irrigation, recreation, and habitat in late spring through early autumn. Since 2011 (water year [WY] 2012), Fall Creek Lake has been temporarily drawn down each year to facilitate downstream passage of juvenile spring Chinook salmon ( Oncorhynchus tshawytscha ) through the 55-meter (m) high dam. This annual dam operation is temporary, typically lasting about 1–2 weeks from WY 2012 through 2020 (drawdown operations in WY 2022–24 have increased to more than 6 weeks). Drawdown of the reservoir results in lake levels being lowered to the elevation near the historical, pre-dam streambed. The annual streambed drawdowns of WY 2012–18 have improved fish passage and led the USACE to formally adopt streambed drawdowns as part of annual operations at Fall Creek Dam. However, temporarily lowering the lake to streambed creates free-flowing conditions in the reservoir that result in the erosion and episodic export of predominantly sand and finer-grained sediments (less than 2 millimeters [mm]) to the lower gravel-bed reaches of Fall Creek and the Middle Fork Willamette River. The introduction of large volumes of sand and finer-grain sediment into the dam-regulated reaches downstream from Fall Creek Dam prompted questions about the geomorphic responses to annual streambed drawdowns within Fall Creek Lake and downstream reaches along Fall Creek and the Middle Fork Willamette River. The U.S. Geological Survey (USGS) in partnership with USACE initiated a comprehensive geomorphic and sediment transport investigation to assess the coupled processes of reservoir erosion, sediment evacuation from Fall Creek Lake, and patterns of sediment transport and deposition in reaches downstream from the Fall Creek Dam that have resulted from annual streambed drawdowns. The purpose of this report is to systematically describe the processes of sediment erosion, transport, and deposition at Fall Creek Lake and geomorphic interactions between reaches upstream and downstream from Fall Creek Dam that relate to dam operations. Specifically, this report focuses on evaluating geomorphic responses to streambed drawdowns from WY 2012 through 2018 and placing drawdown-induced geomorphic responses within the broader context of physiographic and historical conditions and dam operations of Fall Creek and Middle Fork Willamette Rivers. Key objectives for this study were to characterize changes in reservoir morphology and substrate at Fall Creek Lake, describe the character and temporal pattern of sediment transport downstream from Fall Creek Dam, characterize geomorphic changes in channel reaches downstream from the Fall Creek Dam, and relate these data to the annual streambed drawdowns of WY 2012–18. This study uses multiple independent monitoring and measurement approaches to assess site, reach, and river-scale geomorphic responses to drawdowns to inform dam and reservoir management. Patterns and processes of reservoir evolution were assessed with geomorphic mapping and volumetric analyses of topography through comparison of multiple digital surface models (DSMs). Just downstream from Fall Creek Dam, analyses of sediment export from the reservoir focused on suspended sediment but also incorporated bedload analyses to assess sediment sizes. Geomorphic assessments downstream from the dam used reach-scale and site-scale approaches to document changes in channel morphology and substrate, including site measurements of sand and finer-grained sediment deposition and in-channel bed-material, volumetric change analyses from comparison of digital elevation models (DEMs), and repeat geomorphic mapping. Findings from this study inform river management and dam operations by providing an understanding of (1) coupled upstream-downstream geomorphic responses to the Fall Creek Lake streambed drawdowns, (2) geomorphic responses of Fall Creek Lake streambed drawdowns in comparison to drawdowns at other large dams, (3) controls on reservoir erosion and downstream geomorphic responses, and (4) implications for future hydrogeomorphic changes that may result from continued drawdowns and monitoring activities to assess those changes. Chapter B. Reservoir Morphology and Evolution Related to Dam Operations at Fall Creek Lake To understand the volume and distribution of sediment accumulation in Fall Creek Lake since dam closure in 1965, decadal-scale sedimentation patterns (spanning approximately 1965–2016) are evaluated using a combination of storage curve analyses and geomorphic mapping. Short-term (drawdown event-scale) patterns of erosion, sedimentation, and sediment export downstream are evaluated using a combination of geomorphic mapping and change detection analyses that quantify the distribution and total volume of sediment erosion and deposition within Fall Creek Lake. Geomorphic mapping of reservoir topography and analyses of historical datasets reveals four categories of landforms and sediment processes within Fall Creek Lake related to lake level operations: lacustrine sedimentation expressed in the reservoir floor, fluvial erosion and deposition within historical stream channels during streambed drawdowns, channel-like features created by erosion within the reservoir floor during streambed drawdowns, and erosion on reservoir hillslopes. Where the reservoir floor is mapped for this study as pelagic (deep water), deposition up to 3 meters (m) thick by lacustrine processes and burial of pre-dam topography with deposits thinning toward the edges of the valley floor and upstream areas of reservoir are observed. Despite over 50 years of sediment accumulation since dam construction, the main stream channels of Fall and Winberry Creeks (or reservoir thalwegs) through the reservoir are well defined, though their distinct morphology is likely influenced by a long history of recurring historical drawdowns to or near streambed since dam construction. Unregulated streamflow and sediment transport through the reservoir primarily are confined to these channels during the streambed drawdown periods. Erosional channel-like features created by drawdowns are carved through underlying, unconsolidated reservoir floor sediments and are most prominent in the lower reservoir below minimum conservation pool (the low pool elevation during winter flood season); sediment generated from the formation of these drawdown channels is more likely to be transported through and out of the reservoir than sediment deposits along the reservoir hillslopes at the valley margins that are separated from main channels by areas of low-gradient reservoir floor. Morphologic changes in the lower reservoir topography between January 2012 and November 2016 indicate overall net erosion of about 129,500 cubic meters (m 3 ). The most prominent geomorphic changes occurred along the main channels of Fall and Winberry Creeks near the Fall Creek Dam where incision, lateral migration, and slumping banks resulted in vertical and lateral adjustments to channel position, whereas most changes fell below the detectable limit on higher-elevation reservoir floor surfaces except where erosion occurred along features mapped as drawdown channels. Chapter C. Sediment Delivery from Fall Creek Lake and Transport through Downstream Reaches USGS implemented a sediment monitoring program in WY 2013–18 to evaluate the quantity and character of reservoir sediment exported from Fall Creek Lake during streambed drawdowns. Turbidity and suspended sediments were monitored annually autumn through spring to span the WY 2013–18 streambed drawdowns; however, unequal monitoring timeframes each year reduced the ability to compare results and factors affecting sediment export from the reservoir difficult between years. These data were originally measured to develop regressions and compute suspended-sediment loads (SSL). Bedload sediment monitoring from a cableway at the Fall Creek streamgage was completed in the autumn-winter of WY 2013 and 2017. The limited number of samples and presumed variability in sediment supply from the reservoir precluded construction of streamflow and bedload discharge relations to compute more than instantaneous bedload. Sand and finer-grained silts and clays were transported from the reservoir in suspension, though some coarser grains (up to 32 mm) were also mobilized and transported downstream from the dam as bedload. Observations of increased sediment transport downstream from Fall Creek Dam coincided with lake levels approaching about 3 m (10 feet [ft] or elevation 690 ft) above the streambed regulating outlets. Suspended-sediment loads computed for the full monitoring periods WY 2013–18 at the Fall Creek streamgage, located 1.4 kilometers (km) downstream from Fall Creek Dam, range from 54,700 metric tons (t) in WY 2013 to 13,900 t in WY 2018. Although the total annual SSL varied from year to year, the overall seasonal patterns of suspended sediment transport throughout each year were similar during monitoring in WY 2013-18. Suspended-sediment loads were low prior to the drawdown, then increased rapidly as lake levels lowered and approached the streambed. In the weeks following the drawdown period, as pool levels were increased, SSL remained slightly elevated above pre-drawdown levels but generally declined through the following winter and spring except during streamflow-driven pulses of suspended-sediment transport. WY 2013 had the greatest total computed SSL for each streambed drawdown and partial-year monitoring period. SSL computed for the partial-year period have generally decreased since WY 2013 and have varied by about 6,800 t with the exception of WY 2014. WY 2014 SSL reflects anomalously low sediment export due to low streamflows and freezing conditions that stabilized reservoir floor deposits. Bedload measurements in the short 1.4-km reach between Fall Creek Dam and the Fall Creek streamgage showed an inverse correlation between bedload transport rates and discharge, which probably reflects diminishing supply of coarse-sized sediment. Sand was more abundant (60–100 percent) than gravel in bedload samples confirming sand and finer-grained sediment dominated sediment evacuated from the reservoir during streambed drawdowns at Fall Creek Lake. Chapter D. Geomorphic Responses to Fall Creek Lake Streambed Drawdowns Downstream from Fall Creek Dam In the days, weeks, and months following streambed drawdown operations at Fall Creek Dam through WY 2018, sites downstream from the dam displayed a variety of geomorphic responses to reservoir sediment delivery within the main channel and overbank areas. Evaluation of streambed elevations at two streamgages located 1.4 km downstream from the dam on Fall Creek and 16.3 km downstream from the dam on the Middle Fork Willamette River indicated the effects of drawdown sediment on bed elevations were modest and transient. Repeat particle size measurements (October 2015 and September 2016) at five sites along Fall Creek and the Middle Fork Willamette River showed similar grain-sized distributions that do not reveal substantial deposition of fine-grained sediment related to the WY 2016 streambed drawdown. Altogether, these findings indicate that transport capacity in the main, low-flow channels of Fall Creek and Middle Fork Willamette River during WY 2012–18 was sufficient to mobilize and evacuate reservoir sediments from streambed drawdowns or other bank material and tributary sources. However, other monitoring for this study indicate low-velocity zones in off-channel areas are prime locations for sand and finer-grain sediment deposition. Patterns of overbank sediment accumulation indicate that the magnitude and timing of overbank deposition on bars and low-elevation floodplain varies with proximity to the dam, geomorphic setting, streamflows, and other factors. Sand and finer-grained reservoir sediments carried as suspended-sediment load in the reaches downstream from Fall Creek Dam were deposited in overbank areas as observed with clay-horizon markers during WY 2016–17. Overbank deposition quantified with Geomorphic Change Detection (GCD) software evaluated landform-scale patterns of erosion and deposition using repeat light detection and ranging (lidar) surveys at two sites in the Upper Fall Creek reach and one site in the Jasper reach for 3 years (2012–15) and one site in the Clearwater reach for 6 years (2009–15). Deposition thickness and spatial patterns from the GCD analysis were variable; some sites had dispersed but measurable deposition while at others, deposition was highly localized and exceeded 1 m in depth. Patterns of overbank deposition illustrate interactions among bar morphology, local hydraulics, and suspended-sediment transport dynamics that can create patches of highly localized deposition. The measured deposition at the two Fall Creek GCD sites likely resulted from reservoir sediments released from Fall Creek Lake during streambed drawdowns in WY 2016 and 2017 because the limited sediment inputs from bank material (geomorphically laterally stable reach) or tributaries (no significant tributaries) provided few other sediment sources. On the Middle Fork Willamette River, observed patterns of overbank deposition could reflect sediment sourced from upstream tributaries, bank erosion, or Fall Creek Lake streambed drawdown operations. Despite the introduction of several thousand tons of reservoir sediment delivered from the Fall Creek Lake streambed drawdowns to below-dam river corridors, reach-scale mapping of channel features downstream from Fall Creek Dam shows minimal evidence of changes in channel planform or landforms that can be attributed to a drawdowns in WY 2012–16. On Upper Fall Creek reach, widespread increases in gravel bars or other in-channel sediment did not result from the five streambed drawdowns. The main changes attributable to sediment releases from Fall Creek Lake were localized increases in vegetated bar area, particularly on channel margin areas where sand and finer-grain sediment was deposited and rapidly colonized by vegetation. The area of mapped secondary water features decreased between 2005 and 2016, but that may be due to lower discharges depicted in the 2016 aerial photographs and less mapped area of inundation. Primary changes along the Lower Fall Creek reach include a 6.4 percent decrease in area of secondary water features between 2011 and 2016, and a nearly twofold increase in the area of unvegetated bars. Immediately downstream from the Fall Creek confluence, there were negligible changes in the location and areas of vegetated bars and the main wetted channel between 2005 and 2016, and local increases in bar area cannot be attributed solely to deposition of reservoir sediments from Fall Creek Lake because (1) areas along the Middle Fork Willamette River just upstream from the Fall Creek confluence display similar type and magnitude of changes and (2) some of the increases at the confluence area pre-date the drawdowns. The cumulative effect of sediment releases from Fall Creek Lake streambed drawdowns from WY 2012 to 2016 on downstream channel planform and landforms are modest compared to the river-scale transformations and planform changes that occurred in the decades following dam construction. Chapter E. Discussion of Geomorphic Responses of Fall Creek and Middle Fork Willamette River to Streambed Drawdowns at Fall Creek Lake Multiple aspects of Fall Creek Dam infrastructure and operations exert first-order controls on the magnitudes of reservoir erosion that occur during the streambed drawdowns and ultimately determine the sediment delivery to downstream reaches. Key aspects of the dam and its operations that are most relevant to assessing geomorphic responses to streambed drawdowns include the (1) dam infrastructure, including configuration and size of regulating outlets and their proximity to the streambed which dictates the capacity and competence of the river to deliver sediment to downstream reaches and mode of sediment transport as suspended-sediment load or bedload; (2) frequency of historical drawdowns and long-term, year-round dam operations and lake level management, which partly dictate reservoir morphology and locations and magnitudes of readily erodible materials; (3) dam operations and hydroclimatic conditions during the streambed drawdown (including length of the drawdown and streamflows entering the reservoir), which directly control the timing, duration and magnitude of reservoir erosion and sediment evacuation; and (4) dam operations following the streambed drawdown operation that regulate streamflows (and thereby sediment transport conditions) downstream of Fall Creek Dam which primarily reflect interactions between hydroclimatic conditions and flood control operations. Patterns of sediment erosion and evacuation observed in this study at Fall Creek Lake from WY 2012–18 suggest that reservoir erosion during annual streambed drawdowns may remain similar or decrease in future years assuming (1) annual streambed drawdown operations are implemented in similar manner as the WY 2012–18 drawdowns (in terms of duration, late autumn or early winter implementation, rate of pool-level lowering to reach streambed, and other factors), (2) streambed drawdowns coincide with similar conditions as were observed WY 2012–18 (similar sediment yield into reservoir, low reservoir inflows, limited precipitation, moderate air temperature), and (3) no major geomorphic changes in the main reservoir channels of Fall and Winberry Creeks occur (for example, channel avulsion). Under such conditions, it is hypothesized that the stream channel within the reservoir would achieve a quasi-equilibrium state with respect to annual influx and export of sediment and aided by the substantial amount of in-channel bedrock, will remain laterally stable without erosion across reservoir deposits. Patterns of sediment transport measured at the Fall Creek streamgage downstream from Fall Creek Dam provide insight into the potential effects of future streambed drawdowns at Fall Creek Lake. Analyses of suspended sediment measured in WY 2013–18 show a major reduction in suspended-sediment loads between WY 2013 and later years, indicating streamflows transporting sediment through the reservoir to downstream reaches during streambed drawdowns have become supply limited. The 6-year suspended-sediment monitoring and sampling program is insufficient to make predictions about future sediment transport conditions because of uneven monitoring periods and varying controls on reservoir sediment erosion. It is likely that future suspended-sediment loads will be variable but similar to those observed in WY 2015–18 if operational, climatic, and geomorphological factors remain similar to those monitored WY 2015–18. Suspended-sediment loads downstream from Fall Creek Lake will likely remain highest when regulating outlets are fully open and Fall Creek is free flowing with the reservoir fully drained with little to no residual pool. Over time, it is possible that the suspended-sediment loads would reflect mobilization of reservoir sediment deposited in the previous year rather than erosion of sediment deposited years or decades earlier. Bedload is likely to remain a small fraction of the total sediment load evacuated from the reservoir and is relatively modest compared with pre-dam bedload transport rates because most coarse sediment remains trapped by the dam. If sediment releases from Fall Creek Lake and ensuing streamflow conditions follow a similar pattern in the future as was assessed in this study spanning WY 2012–18, near-term geomorphic adjustments downstream of the dam are expected to be modest. Barring major operational, climatic, and geomorphological changes, local site-scale deposition on bars, overbank areas, or off-channel features that persists several months after the streambed drawdown will likely continue to be highly variable, ranging from negligible to several centimeters of deposition. At the landform-scale, low velocity areas nearest to Fall Creek Dam will likely continue to undergo rapid deposition immediately during and after a streambed drawdown event, similar to patterns observed for WY 2012–18. Some of the sediment entering these off-channel features and margin areas may be temporarily stored, then later remobilized and dispersed farther downstream. But if newly deposited sediment persists through the following spring, there is a greater likelihood that local vegetation will establish, reinforce deposited material, and trap sediment during later drawdowns. The reach-scale geomorphic changes may become more apparent if (1) streambed drawdowns continued for several decades, and geomorphic changes were measured at decadal scales or (2) the amount of sediment introduced to downstream reaches substantially increased and (or) sediment transport capacity decreased. The continued streamflow regulation of Fall Creek Dam after sediment releases provides an opportunity to strategically manage streamflows during and after the streambed drawdowns to minimize downstream sediment impacts and ensure other operational thresholds are satisfied. This study provides a comprehensive foundation of datasets and geomorphic analyses to inform dam operations at Fall Creek Lake, monitor sediment transport downstream, and consider operational schemes for future drawdowns. The datasets from this study also provide baselines of sediment transport and geomorphic conditions to assess future changes in reservoir and downstream environments. Future monitoring could be tailored to address specific questions regarding the long-term geomorphic effects of streambed drawdowns on fluvial habitats, flood hazards, cultural resources, or downstream water quality. Future monitoring activities could focus on the relevant geomorphic processes and spatial domains within the three categories used for this study: (1) reservoir erosion and net sediment evacuation, (2) sediment delivery to downstream reaches, including magnitude and temporal pattern of sediment transport, and (3) geomorphic responses of downstream reaches to sediment delivery. Specifically, high priority future monitoring activities could include: Repeat topographic or photographic surveys in the reservoir to characterize changes occurring within individual drawdowns, to quantify sediment export, to determine temporal changes in reservoir storage, and to identify locations of erosion and deposition. Continuous, year-round turbidity monitoring supplemented with suspended-sediment measurements at a streamflow-gaging station immediately downstream from the dam to quantify sediment export. Repeat geomorphic monitoring, mapping, or modeling in downstream reaches to track changes in channel and over bank features using a combination of site- and reach-scale monitoring approaches. This could support assessments of sediment deposition and ensuing vegetation encroachment on flood hazards and habitats and examine how sediment transport and depositional processes may be affected by different sediment supply, streamflow, or dam management scenarios.

Oregon

A glimpse into the future of tectonic tremor monitoring

Tectonic tremor is a weak, long-duration seismic signal often observed in subduction zones and on some other plate-bounding faults. Because of tremor's characteristically low amplitude (and low signal-to-noise) and lack of clear phase arrivals, detecting and locating tremor usually requires techniques distinct from those applied to typical earthquakes. Major advances in detection and understanding of tremor have derived in the past from a powerful combination of new data and new analysis techniques. In a recent study, Sagae et al. (2025, https://doi.org/10.1029/2025jb031348 ) exploit that combination again, developing a new machine-learning based workflow and applying it to the S-net cabled seismic network in the Japan trench offshore northern Honshu. Their approach, although complex, succeeds in detecting several times more tremor activity than earlier studies, resulting in new insights and providing a blueprint for similar approaches that could be applied elsewhere. As real-time earthquake monitoring adopts similar tools, it may present an opportunity to bring tremor monitoring into operational workflows. In turn, this could solidify tremor monitoring as a component of future operational earthquake forecasting.

JGR Solid Earth

Groundwater-level elevations in the Denver Basin bedrock aquifers and Upper Black Squirrel Creek alluvial aquifer, El Paso County, Colorado, 2021–24

El Paso County is the second-most populous county in Colorado and is projected to grow another 15 percent by 2030. Within El Paso County is the Upper Black Squirrel Creek Designated Groundwater Basin (Black Squirrel Basin), an area where surface water is scarce and water users rely primarily on groundwater from five different aquifers (the Upper Black Squirrel Creek alluvial aquifer and four bedrock aquifers within the Denver Basin aquifer system: the lower Dawson, Denver, Arapahoe, and Laramie-Fox Hills aquifers) to meet their needs. Currently (2024), land within the Upper Black Squirrel Creek Basin is primarily used for rural grazing and agriculture; however, municipal development is ongoing. In 2021, the U.S. Geological Survey, in cooperation with the Upper Black Squirrel Creek Ground Water Management District, began a study to establish a baseline dataset and assess the groundwater resources of the aquifers within the Black Squirrel Basin. A network of 39 wells was established in 2021; discrete groundwater-level measurements were made bimonthly. Nine of the 39 wells were equipped with pressure transducers to record hourly groundwater-level data. Seven wells had statistically significant seasonal trends, and trends at 3 wells were negative. For the discrete data, 16 wells had a significant trend for the study period, and 4 wells had negative trends. For the time-series data, 8 wells had significant trends, and 3 wells had negative trends. Potentiometric surface maps were created for this study using discrete, static groundwater levels measured in April 2023. These maps showed the estimated groundwater flow direction from the north-northwest to the south-southeast in the alluvial aquifer and from the northwest to the east-southeast for the lower Dawson and Denver aquifer wells. This study indicates the potential benefit of monitoring wells in the areas near municipal pumping. Additional monitoring could lead to a better understanding of connectivity between aquifers and be an important tool for assessing long-term sustainability of groundwater use.

Colorado

Remote sensing-based actual evapotranspiration assessment in a data-scarce area of Brazil: A case study of the Urucuia Aquifer System

The large groundwater reserves of the Urucuia Aquifer System (UAS) enabled agricultural development and economic growth in the western Bahia State, in northeastern Brazil. Over the last several years, concern has grown around the aquifer’s diminishing water levels, and water balance (WB) studies are in demand. Considering the lack of measured actual evapotranspiration (ET a ), a major component of the water cycle, this work uses the Operational Simplified Surface Energy Balance (SSEBop) model to estimate ET a , and compares it to basin-scale estimates from the Soil Moisture Accounting Procedure (SMAP) monthly model and from an annual WB closure method, based on gridded meteorological data and the Gravity Recovery and Climate Experiment (GRACE) product. Additionally, a comparative assessment of different versions of the SSEBop parameterization was performed. Moderate Resolution Imaging Spectroradiometer (MODIS) imagery was used to implement eight different versions of the SSEBop algorithm over the UAS between 2000 and 2013. SSEBop and SMAP ET a yielded similar seasonal patterns, with correlation coefficient (r) up to 0.65, mean difference (MD) of 0.8 mm/month and mean absolute difference (MAD) of 18.5 mm/month. Comparison of SSEBop annual ET a estimates to annual SMAP and WB closure estimates yielded low MD (12.1 and −7.3 mm/year, respectively) and MAD (82.5 and 82.8 mm/year, respectively), but also low r values (0.00 and 0.37, respectively). The comparison of the different SSEBop versions indicated the need to incorporate a calibration step of the aerodynamic heat resistance (r ah ) parameter. SSEBop results were also used for land cover and drought monitoring. Analysis indicates that agriculture, associated with an increasing trend of atmospheric evaporative demand, is responsible for the decrease in groundwater levels and streamflow in the studied time period.

Urucuia Aquifer System