Search USGSSearch

USGS · 70160345

Hydrology and geomorphology of the Snake River in Grand Teton National Park

Abstract

The influence of significant tributaries that join the Snake River within 10 km of Jackson Lake Dam (JLD) mitigate some impacts resulting from nearly 100 years of flow regulation in Grand Teton National Park. I analyzed measured and estimated unregulated flow data for all segments of the study area by accounting for tributary flows. The magnitude of the 2-yr recurrence flood immediately downstream from JLD decreased 45% since 1958 relative to estimated unregulated flows, whereas that downstream from Buffalo Fork, the largest tributary, decreased 36%. There has been no long-term progressive geomorphic change on the Snake River resulting from dam regulation. I mapped the bankfull channel on four series of aerial photographs taken in 1945, 1969, 1990/1991, and 2002 and analyzed channel change in a geographic information system. Periods of low-magnitude floods (1945 to 1969) resulted in widespread deposition whereas periods of high-magnitude floods (1969 to 1990/1991 and 1990/1991 to 2002) resulted in widespread erosion; channels narrowed and widened by as much as 31%. I mapped three distinct deposits within the Holocene alluvial valley. The lower floodplain covers 3.5% of the mapped area in the form of abandoned channel and inset, channel-margin facies and has inundating recurrence intervals of one to two years. The upper floodplain covers 36% of the mapped area, is composed of abandoned channels and bars, is higher in elevation than the lower floodplain, and is inundated by floods with recurrence intervals greater than 10 years. The lowest Holocene terrace covers 35% of the mapped area and is approximately 1 m higher in elevation than the upper floodplain. Though the lowest terrace has not been inundated or built since 1945, the two floodplain deposits have been developing since before 1945. Flood magnitudes have decreased throughout the study area as a result of regulation, but these decreases are mitigated downstream from tributaries. Dam operations have not resulted in long-term progressive channel change or the development and abandonment of floodplain deposits. However, channel change is now dependant on the frequency of high-magnitude floods, and the frequency with which the two floodplains are inundated has been reduced.

Explore related subjects

90° N90° S · 180° W ← longitude → 180° E
Source-reported bounding extent: 43.159112387154174° to 44.09942068528651° latitude; -110.9893798828125° to -110.54443359375° longitude. This indicates report coverage, not an exact sampling location. View area on OpenStreetMap.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Nicholas C. Nelson, John C. Schmidt. 2007. Hydrology and geomorphology of the Snake River in Grand Teton National Park. https://pubs.usgs.gov/publication/70160345

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

Strategic approach for bird restoration evaluation - FY 2025 annual report

The Deepwater Horizon oil spill (hereafter “ spill ”) resulted in an estimated loss of 56,141–102,399 birds across 93 species along the U.S. Gulf of America coast. Injured species included those that nest locally along the northern Gulf of America coast as well as species that nest hundreds or thousands of kilometers outside of the region. The breadth of injury and the expansive geographic distribution of birds affected by the spill necessitated implementation of numerous and diverse projects designed to restore the injury of all affected bird species. As of September 2025, the Trustees, who are authorized to act on behalf of the public to restore injuries caused by the spill , have approved 39 projects, amounting to >60% of the total funds specifically allocated for bird restoration (i.e., Bird Restoration Type funding). Strategic allocation of remaining Bird Restoration Type funding is necessary to ensure that restoration of all injured bird species is achieved. An essential component of planning for future restoration is understanding the progress made from restoration actions conducted to date. The purpose of this project is to develop a plan that assesses the current restoration progress for each of the 93 injured species based on available data. The restoration assessment plan will be derived from a data gap analysis that identifies species for which data may be insufficient to assess restoration progress. This project will also allow Trustees to review and update the indicators of restoration success developed for injured bird species (e.g., population counts, reproduction metrics) that are used to evaluate restoration progress.

Annual Report

Prince William Sound Herring Program, fiscal year 2024

Pacific herring ( Clupea pallasii ) were collected from three sites in Prince William Sound (PWS), Alaska (Table 1) during the spring pre-spawn period from March 29 – April 1, 2024, to test for viral hemorrhagic septicemia virus (VHSV), viral erythrocytic necrosis (VEN), and Ichthyophonus prevalence (Table 1). Ichthyophonus was detected in 33% (59/180) of heart cultures from all sites combined. An inverted pattern of decreasing Ichthyophonus infection prevalence with size started around 2019 and continued through 2024 (Fig. 1). VHSV was isolated from one fish collected in Canoe Pass. The isolation was at a very low titer and was detectable only after blind passage. Neutralizing antibodies to VHSV were detected in 4.4% (14/318) of PWS herring in 2024 (Fig. 2). Erythrocytic inclusions indicative of VEN were not detected in any PWS herring (n =180) from 2024, but bacterial rods were noted in the blood films from three fish.

Alaska