Search USGSSearch

USGS · 70159436

Annual report upon explorations and surveys in the Department of the Platte: Being Appendix QQ of the Annual Report of the Chief of Engineers for 1875

Abstract

There are at nearly all the headquarters of the tour military divisions and the nine military departments, officers of engineers, whose chief duty it is to collect geographical and other information; and these officers do, by means of their own explorations and surveys, and by collecting the notes, sketches, and maps made by the officers and soldiers belonging to the western posts, in their scouts and campaigns, add much, year by year, to the knowledge of the interior of the country, which is not only essential to the generals in command of these departments and divisions, but useful to the country generally. Capt. W.S. Stanton, on duty with the commanding general of the Department of the Platte, was engaged in the surveys and establishment of the monuments and boundary-lines of the military reservation of Fort Sanders, embracing an area of thirty square miles, pursuant to an act of Congress approved June 9, 1874, the survey of the military reservation of Fort Hartsuff, embracing two townships, and the selection, survey, and examination of the site for a bridge to be built by the United States over the North Platte at Fort Laramie. During the year every post in the department has been supplied with a set of reconnoitering instruments, embracing odometer, prismatic compass, and set of drawing-instruments. Maps and topographical note-books have been issued with instructions, designed to take advantage of every movement of troops to secure geographical and topographical information sufficiently accurate for use in revising and extending the maps of the department. In the Office attention has been given to the collection of information from all sources available. Maps have been made of the reservations surveyed, drawings of the sub-structure for the new bridge over the Platte, and various tracings and numerous sketches have been made. Fifty-four note-books and one hundred and fifty skeleton maps, each containing three degrees of longitude, have been issued for use in connection with movements of troops. Two hundred and thirty maps have been mounted, and two hundred maps have been issued for the use of officers. Four hundred copies of the map of Wyoming Territory, which was constructed by Captain Stanton's predecessor, Capt. W. A. Jones, Corps of Engineers, have been lithographed.

Explore related subjects

90° N90° S · 180° W ← longitude → 180° E
Source-reported bounding extent: 39.90973623453719° to 43.96119063892024° latitude; -108.21533203125° to -96.78955078125° longitude. This indicates report coverage, not an exact sampling location. View area on OpenStreetMap.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

W.S. Stanton. 1875. Annual report upon explorations and surveys in the Department of the Platte: Being Appendix QQ of the Annual Report of the Chief of Engineers for 1875. https://doi.org/10.3133/70159436

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

Strategic approach for bird restoration evaluation - FY 2025 annual report

The Deepwater Horizon oil spill (hereafter “ spill ”) resulted in an estimated loss of 56,141–102,399 birds across 93 species along the U.S. Gulf of America coast. Injured species included those that nest locally along the northern Gulf of America coast as well as species that nest hundreds or thousands of kilometers outside of the region. The breadth of injury and the expansive geographic distribution of birds affected by the spill necessitated implementation of numerous and diverse projects designed to restore the injury of all affected bird species. As of September 2025, the Trustees, who are authorized to act on behalf of the public to restore injuries caused by the spill , have approved 39 projects, amounting to >60% of the total funds specifically allocated for bird restoration (i.e., Bird Restoration Type funding). Strategic allocation of remaining Bird Restoration Type funding is necessary to ensure that restoration of all injured bird species is achieved. An essential component of planning for future restoration is understanding the progress made from restoration actions conducted to date. The purpose of this project is to develop a plan that assesses the current restoration progress for each of the 93 injured species based on available data. The restoration assessment plan will be derived from a data gap analysis that identifies species for which data may be insufficient to assess restoration progress. This project will also allow Trustees to review and update the indicators of restoration success developed for injured bird species (e.g., population counts, reproduction metrics) that are used to evaluate restoration progress.

Annual Report

Prince William Sound Herring Program, fiscal year 2024

Pacific herring ( Clupea pallasii ) were collected from three sites in Prince William Sound (PWS), Alaska (Table 1) during the spring pre-spawn period from March 29 – April 1, 2024, to test for viral hemorrhagic septicemia virus (VHSV), viral erythrocytic necrosis (VEN), and Ichthyophonus prevalence (Table 1). Ichthyophonus was detected in 33% (59/180) of heart cultures from all sites combined. An inverted pattern of decreasing Ichthyophonus infection prevalence with size started around 2019 and continued through 2024 (Fig. 1). VHSV was isolated from one fish collected in Canoe Pass. The isolation was at a very low titer and was detectable only after blind passage. Neutralizing antibodies to VHSV were detected in 4.4% (14/318) of PWS herring in 2024 (Fig. 2). Erythrocytic inclusions indicative of VEN were not detected in any PWS herring (n =180) from 2024, but bacterial rods were noted in the blood films from three fish.

Alaska