Search USGSSearch

USGS · 1015334

Physiological and morphological response patterns of Populus deltoides to alluvial groundwater

Abstract

We examined the physiological and morphological response patterns of plains cottonwood [ Populus deltoides subsp. monilifera (Aiton) Eck.] to acute water stress imposed by groundwater pumping. Between 3 and 27 July 1996, four large pumps were used to withdraw alluvial groundwater from a cottonwood forest along the South Platte River, near Denver, Colorado, USA. The study was designed as a stand-level, split-plot experiment with factorial treatments including two soil types (a gravel soil and a loam topsoil over gravel), two water table drawdown depths (∼0.5 m and >1.0 m), and one water table control (no drawdown) per soil type. Measurements of water table depth, soil water potential (Ψ s ), predawn and midday shoot water potential (Ψ pd and Ψ md ), and D/H (deuterium/hydrogen) ratios of different water sources were made in each of six 600-m 2 plots prior to, during, and immediately following pumping. Two additional plots were established and measured to examine the extent to which surface irrigation could be used to mitigate the effects of deep drawdown on P. deltoides for each soil type. Recovery of tree water status following pumping was evaluated by measuring stomatal conductance ( g s ) and xylem water potential (Ψ xp ) on approximately hourly time steps from before dawn to mid-afternoon on 11 August 1996 in watered and unwatered, deep-drawdown plots on gravel soils. P. deltoides responded to abrupt alluvial water table decline with decreased shoot water potential followed by leaf mortality. Ψ pd and percent leaf loss were significantly related to the magnitude of water table declines. The onset and course of these responses were influenced by short-term variability in surface and ground water levels, acting in concert with physiological and morphological adjustments. Decreases in Ψ pd corresponded with increases in Ψ md , suggesting shoot water status improved in response to stomatal closure and crown dieback. Crown dieback caused by xylem cavitation likely occurred when Ψ pd reached −0.4 to −0.8 MPa. The application of surface irrigation allowed trees to maintain favorable water status with little or no apparent cavitation, even in deep-drawdown plots. Two weeks after the partial canopy dieback and cessation of pumping, g s and Ψ xp measurements indicated that water stress persisted in unwatered P. deltoides in deep-drawdown plots.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

D.J. Cooper, D.R. D’Amico, M. L. Scott. 2003. Physiological and morphological response patterns of Populus deltoides to alluvial groundwater. https://doi.org/10.1007/s00267-002-2808-2

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

Trust-building as a keystone activity in beaver-related restoration practice

North American beavers ( Castor canadensis ) are increasingly being used to achieve restoration goals, prompting practitioners to engage with private landowners in efforts to promote beaver coexistence. Through 23 semi-structured interviews with restoration practitioners in Oregon, USA, we explored how practitioners from government agencies, non-governmental organizations (NGOs), service organizations, and private businesses communicate with private landowners about nonlethal beaver management and habitat creation. Using abductive analysis, we identified trust-building as an essential element of restoration practice. Practitioners described 60 tactics for building trust, which we organized using the Shared Foundations model of trust and distrust and the adaptive management cycle to bridge theory with field-based experience. Practitioners also reported navigating tensions between tactics and adapting their approaches to individual landowners and contexts. We argue that trust-building is a craft that can be mastered, propose a potential progression from novice to master trust-builder, and highlight the need for greater attention to trust, relationships, and trust repair in environmental management. Our findings offer a theoretically grounded yet practitioner-informed framework for understanding and improving trust-building efforts in restoration practice.

Oregon

Restoring the Florida Everglades: Insights on integrating sea level rise into decision-support tools

Although coastal ecosystems are impacted by climate change and sea-level rise, many ecological and hydrological models do not yet incorporate sea-level rise projections in their modeling outputs. Therefore, this research examined the various challenges that may prevent sea-level rise from being effectively incorporated in modeling and decision-support tools. We conducted semi-structured interviews with twenty-six professionals involved in Florida’s Everglades restoration. We applied the Diffusions of Innovations Theory to better understand factors that can impact practitioners’ adoption of newly designed decision-support tools that examine sea-level rise in the freshwater Everglades. The Diffusions of Innovations Theory provided insights into practitioners’ perceptions of these tools. We found that these practitioners have a strong interest in using dynamic decision-support tools to plan for sea-level rise impacts on Everglades restoration, particularly when they receive information at appropriate geographic and temporal scales and are given hands-on tools and training. However, challenges that prevent developing these tools include outdated data, limited organizational capacity and funding, limited use of long-term indicators, uncertainty about climate change impacts on local ecosystems, and lack of integration between hydrological and ecological models. Our research also highlights that greater availability of different types of tools can help to meet the needs of the scientific and non-scientific audiences involved in Everglades restoration.

Florida

Causal networks to inform decisions for ecological restoration

The release of contaminants into the environment can occur from anthropogenic activities, such as oil extraction and transportation, mining, and industrial processes. Remediation associated with reducing contaminant concentrations, and restoration that improves animals and supporting habitat, are often needed to restore ecosystems to their pre-release, baseline condition. We demonstrated the application of Bayesian Decision Networks (BDNs) with two Natural Resource Damage Assessment and Restoration (NRDAR) case studies. We use a stylized case study of riparian restoration following the remediation of a mine-impacted site to evaluate proposed restoration actions aimed at restoring Song Sparrow ( Melospiza melodia ) populations to baseline conditions. We then use a settled NRDAR case with implemented restoration in the Upper Arkansas River (UAR, Colorado, USA) to demonstrate the application of BDNs to evaluate and forecast restoration effectiveness for Brown Trout ( Salmo trutta ) (i.e., restoration effectiveness assessment). The riparian restoration model showed differences in the effects of restoration actions on Song Sparrow populations, with the time to reach baseline generally reduced with increased restoration costs, indicating trade-offs between costs and expected recovery. The UAR model showed recovery of Brown Trout populations (i.e., uplift) in response to improved instream habitat restoration, along with forecasted improvements. While the BDNs we developed were specific to two case studies, the structure is adaptable to a diversity of sites, resources, and actions. We suggest that causal network modeling can provide restoration practitioners with a decision advisory tool useful for a wide range of projects.

Environmental Management