Search USGS⌕ Search

Geology topics

Research about Reelfoot Lake

Source-linked reports with geographic coverage including Reelfoot Lake.

10 recordsLinked to original sources

Preliminary models relating lake level gate operation and discharge at Reelfoot Lake in Tennessee and Kentucky

Preliminary models for gate operations at the new outlet control structure for Reelfoot Lake were developed by the U.S. Geological Survey, using calibrated ratings of the lift gates, to support the U.S. Fish and Wildlife Service in managing lake level. In 2018, the old structure at the outlet of Reelfoot Lake was buried and lake level control was transferred to a new structure. The transition from lake-level management of the old control structure to the new control structure was documented using historical lake level and discharge measurements and records of stop-log management from March 7, 2013, to August 12, 2018. Discharge into Running Reelfoot Bayou was determined using a standard stage-discharge rating curve. Discharge measured using an acoustic Doppler current profiler was used to calibrate gate-discharge equations for free and submerged orifice flow at the new structure. Two lake operation models, one for the summer season and another for the winter season, are provided for the new structure based on data from this period. The summer operation model is based on operation of the gates once the lake level exceeds an elevation of 282.7 feet (ft) above the North American Vertical Datum of 1988 (NAVD 88). Free flow begins when lake level reaches 282.3 ft above NAVD 88 and becomes transitional once the lake level exceeds 282.8 ft above NAVD 88. Submerged flow begins once the lake level reaches 283 ft above NAVD 88 and the tail-water depth is above critical flow depth. The winter operation model is based on operation of the gates once the lake level exceeds 283.2 ft above NAVD 88. Submerged flow begins when the lake rises to an elevation of 283.5 ft above NAVD 88 and the tail-water depth is above critical flow depth.

Kentucky, Tennessee↗

Faulting along the southern margin of Reelfoot Lake, Tennessee

Approximately 320 km of deep seismic-reflection profiles in northwestern Tennessee reveal the structure of a major portion of the southeastern margin of the Reelfoot Rift. This rift margin consists of at least two major down-to-the-west late Precambrian to Cambrian normal faults. Maximum fault displacement at one location is 3 km. These two faults strike N50°E, in their northern portions; over their southern extent they trend N30°E however. Numerous faults in these reflection lines displace Paleozoic, Cretaceous, and Tertiary reflectors. The dominantly reverse faulting, folding, and positive flower structures in the shallower section indicate Eocene or younger transpression. We believe the late Tertiary faulting is due to reactivation of the basement faults, because on some of the reflection lines basement normal faults can be traced into Tertiary reverse faults, the Tertiary faults parallel the basement faults, and the Tertiary faults overlie or are adjacent to the basement faults. Numerous faults displace the highest (youngest) reflectors and therefore we do not know how recently faulting has occurred. Previous studies have identified Quaternary faulting within the southeastern Reelfoot Rift margin of western Tennessee, however. Thus, we believe all of the late Tertiary faults identified in this research should be evaluated for possible Quaternary movement.

Tennessee↗

Nonpoint-source pollutant discharges of the three major tributaries to Reelfoot Lake, west Tennessee, October 1987-September 1989

An investigation of the concentration and loads of nitrogen, phosphorus, and suspended sediment in storm runoff to Reelfoot Lake, in western Tennessee, was conducted from October 1987 through September 1989. Concentrations of selected herbicides also were defined. Reelfoot Lake, with a surface area of about 15,500 acres, is the largest natural lake in Tennessee and an important recreation and fisheries resource. Previous studies showed that the lake is hypereutrophic, a condition caused by high concentrations of nutrients in water and sediments discharged from the three principal tributaries (South Reelfoot Creek, North Reelfoot Creek, and Running Slough) to the lake. Pesticides, including herbicides, have been detected in the lake's bottom sediments. Storm runoff contributed about 87percent of the total water discharge of the three main tributaries to Reelfoot Lake. South Reelfoot Creek contributed about 4.7 tons per acre per year of suspended sediment, while North Reelfoot Creek contributed about 1.9 tons per acre per year. Running Slough contributed only about 0.31 ton per acre per year of suspended sediment. Most of the suspended sediment was transported by storm runoff between October and March. About 80 percent of the annual streamflow of the three tributaries occurs during these months. The North Reelfoot Creek basin contributed 8.2 pounds per acre per year of total nitrogen and 2.4 pounds per acre per year of total phosphorus. South Reelfoot Creek basin contributed about 6.5 and 1.3 pounds per acre per year of total nitrogen and phosphorus, respectively, while Running Slough basin contributions were 3.4 and 0.86 pounds per acre per year, respectively. The differences in nutrient yields appear to result from more row-crop agriculture and the relatively steeply sloping agricultural land in the North Reelfoot Creek basin. Ninety-one percent of the total nitrogen load and 95 percent of the total phosphorus load in the three streams was transported by storm runoff. Significant differences in the mean concentrations of nutrients in runoff were defined between the active agricultural months (April through September) and the inactive months (October through March). Storm-runoff samples were analyzed for II selected triazine herbicides. Alachlor and atrazine were the most commonly detected herbicides. Thirty-two percent of the samples contained detectable levels of alachlor and 93 percent of the samples contained detectable levels of atrazine. Ninety percent of the samples collected during the active agricultural months contained detectable leveki of alachlor and all 29 samples contained detectable levels of atrazine. Sixteen samples exceeded lifetime health-advisory levels for atrazine in drinking water (3 micrograms per liter); two samples collected from the April IS, 1988, storm at North Reelfoot Creek and South Reelfoot Creek contained 42 and 57 micrograms per liter of atrazine, respectively. Concentrations of the other nine triazine herbicides were generally less than the level of detection (0.1 microgram per liter).

Tennessee↗

Characterization of bottom-sediment, water, and elutriate chemistry at selected stations at Reelfoot Lake, Tennessee

To better-understand and predict the potential effect of dredging on water quality at Reelfoot Lake, chemical analyses were conducted on samples of lake water, bottom sediment, and elutriate water. Chemical analyses were conducted on samples of lake water, bottom sediment, and elutriate water collected at five stations in the lake during November 1988. Lake water was of the calcium magnesium bicarbonate type with an average dissolved-solids concentration of 120 milligrams per liter. Trace constituents were present in bottom sediments at concentrations representative of their average relative abundance in the earth?s crust. Elutriate waters prepared by mixing bottom sediment and lake water had suspended-solids concentrations as high as 2,000 milligrams per liter which exerted significant oxygen demand Trace constituents in the unfiltered elutriate waters were elevated with respect to lake water; elevated concentrations were attributable to the increased suspended-solids concentrations. Concentrations of total-recoverable copper, lead., and zinc in many elutriate waters exceeded U.S. Environmental Protection Agency?s water-quality criteria for the protection of freshwater aquatic life. The toxicity of elutriate waters, as measured by a 48-hour bioassay with Ceriodaphnia dubia, was low.

Tennessee↗

Hydrologic and suspended-sediment data for Reelfoot Lake, Obion and Lake Counties, northwestern Tennessee, May 1985-September 1986

Hydrologic data for Reelfoot Lake in Obion and Lake Counties, Tennessee, were collected at 4 surface-water inflow stations, 1 outflow station, 2 rainfall stations, 2 lake elevation stations, and 29 wells for the period May 1, 1985 through September 30, 1986. Additionally, suspended-sediment data were collected at three stations on two of the major tributaries to the lake. These data are presented herein.

Tennessee↗

Streamflow and water-quality data for three major tributaries to Reelfoot Lake, west Tennessee, October 1987-March 1988

Streamflow and water quality data were collected for three major tributaries to Reelfoot Lake, in West Tennessee, for the period October 1987 through March 1988. The data are presented in graphs and tables. Mean daily discharge data were collected at one site each in the drainage basins of North Reelfoot Creek, South Reelfoot Creek, and Running Slough. Daily mean suspended-sediment concentration data were collected at a site in the North Reelfoot Creek basin. Water quality samples were collected during storm events at the same locations that daily mean streamflow data were collected. Water quality samples were analyzed for concentrations of nutrients and triazine herbicides. Water temperature and specific conductance were measured at the time that samples were collected.

Tennessee↗

Construction, geologic, and hydrologic data for observation wells in the Reelfoot Lake area, Tennessee and Kentucky

Twenty-three observation wells were installed at 12 sites in the Reelfoot Lake area of Kentucky and Tennessee during July 1986. The wells were installed to supplement an existing water level network and to provide additional data on the hydraulic characteristics and vertical hydraulic gradients in the alluvial aquifer near Reelfoot Lake. Well yields ranged from less than 20 gallons per minute to about 140 gallons per minute. The specific capacities of the wells ranged from less than 1 to 17.1 gallons per minute per foot of drawdown. Three stratigraphic sequences were encountered during drilling. Clay and silty clay was about 40 feet deep near the southwest corner of Reelfoot Lake. Predominantly medium- to coarse grained sand occurred below about 15 feet of silt and clay near the west and northwest sides of Reelfoot Lake. Along the western limit of the study area, near Lake No. 9 and the Mississippi River, about 20 to 30 feet of silt and silty sand occurred below land surface.

Kentucky, Tennessee↗

Water budget and estimated suspended-sediment inflow for Reelfoot Lake, Obion and Lake Counties, Northwestern Tennessee, May 1984-April 1985

Reelfoot Lake in northwestern Tennessee, with a surface area of 15,500 acres at normal pool elevation, is the largest natural lake in Tennessee. Over the years, the lake has become an important economic, environmental, and recreational resource to the people in the area, and to the State of Tennessee. The natural eutrophic succession rate of the lake has apparently been accelerated by land use practices within the Reelfoot Lake drainage basin during the past several decades. The potential loss of Reelfoot Lake has prompted the State to make management and restoration of the lake and its resources a priority objective. The U.S. Geological Survey entered into a cooperative study in May 1984 with the Tennessee Wildlife Resources Agency and the Tennessee Department of Health and Environment, Division of Water Management, to collect and analyze hydrologic data and prepare an annual water budget for Reelfoot Lake. The purpose of the water budget is to provide an analysis of the surface-groundwater-lake-atmospheric water relation at Reelfoot Lake. Results of the analysis can be used by lake managers to evaluate the potential effects of proposed lake management strategies upon the lake and surrounding hydrologic system. The water budget for the 12-month study period (May 1, 1984 through April 30, 1985) is presented in this report. In addition, estimates of suspended-sediment discharge from tributary streams in the Reelfoot Lake basin and an analysis of concentrations of constituents in stream-bottom material at three inflow sites are also presented. (Lantz-PTT)

Tennessee↗