Impounded sediment and dam removal: Erosion rates and proximal downstream fate

Sediment management is an important aspect of dam removal projects, often driving costs and influencing community acceptance. For dams storing uncontaminated sediments, downstream release is often the cheapest and most practical approach and can be ecologically beneficial to downstream areas deprived of sediment for years. To employ this option, project proponents must estimate the sediment quantity to be released and, if substantial, estimate how long it will take to erode, where it will go and how long it will stay there. We investigated these issues when the Bloede Dam was removed from the Patapsco River in Maryland, USA, in 2018. The dam was about 10 m high, and its impoundment was nearly filled with an estimated 186 600 m 3 of sediment composed of 70% sand and 30% mud. After removal, using elevation surveys generated by traditional methods as well as structure-from-motion (SfM) photogrammetry at high temporal resolution, we documented rapid erosion of stored sediments in the first 6 months (~60%) followed by greatly reduced erosion rates for the next two and a half years. A stable channel developed in the impoundment during the rapid erosion phase. These results were predicted by a two-phased erosion response model developed from observations at sand-filled impoundments, thus expanding its applicability to include impoundments with a sand-over-mud stratigraphy. A similar two-phase erosion response has been reported for sediment releases at other dam removals in the United States, France and Japan across a range of dam and watershed scales, indicating what practitioners and communities should expect in similar settings. Downstream, repeat surveys combined with discharge and sediment gaging showed rapid transport of eroded sediments through a 5-km reach, especially during the first year when discharges were above normal, and little overbank storage.

Maryland

Channel response to a dam‐removal sediment pulse captured at high‐temporal resolution using routine gage data

In this study, we captured how a river channel responds to a sediment pulse originating from a dam removal using multiple lines of evidence derived from streamflow gages along the Patapsco River, Maryland, USA. Gages captured characteristics of the sediment pulse, including travel times of its leading edge (~7.8 km yr −1 ) and peak (~2.6 km yr −1 ) and suggest both translation and increasing dispersion. The pulse also changed local hydraulics and energy conditions, increasing flow velocities and Froude number, due to bed fining, homogenization and/or slope adjustment. Immediately downstream of the dam, recovery to pre‐pulse conditions occurred within the year, but farther downstream recovery was slower, with the tail of the sediment pulse working through the lower river by the end of the study 7 years later. The patterns and timing of channel change associated with the sediment pulse were not driven by large flow or suspended sediment‐transporting events, with change mostly occurring during lower flows. This suggests pulse mobility was controlled by process‐factors largely independent of high flow. In contrast, persistent changes occurred to out‐of‐channel flooding dynamics. Stage associated with flooding increased during the arrival of the sediment pulse, 1 to 2 years after dam removal, suggesting persistent sediment deposition at the channel margins and nearby floodplain. This resulted in National Weather Service‐indicated flood stages being attained by 3–43% smaller discharges compared to earlier in the study period. This study captured a two‐signal response from the sediment pulse: (1) short‐ to medium‐term (weeks to months) translation and dispersion within the channel, resulting in aggradation and recovery of bed elevations and changing local hydraulics; and (2) dispersion and persistent longer‐term (years) effects of sediment deposition on overbank surfaces. This study further demonstrated the utility of US Geological Survey gage data to quantify geomorphic change, increase temporal resolution, and provide insights into trajectories of change over varying spatial and temporal scales.

Maryland