Search USGSSearch

Geology topics

Research about Ipswich River basin

Source-linked reports with geographic coverage including Ipswich River basin.

2 recordsLinked to original sources

Effects of water-management alternatives on streamflow in the Ipswich River basin, Massachusetts

Management alternatives that could help mitigate the effects of water withdrawals on streamflow in the Ipswich River Basin were evaluated by simulation with a calibrated Hydrologic Simulation Program--Fortran (HSPF) model. The effects of management alternatives on streamflow were simulated for a 35-year period (1961-95). Most alternatives examined increased low flows compared to the base simulation of average 1989-93 withdrawals. Only the simulation of no septic-effluent inflow, and the simulation of a 20-percent increase in withdrawals, further lowered flows or caused the river to stop flowing for longer periods of time than the simulation of average 1989-93 withdrawals. Simulations of reduced seasonal withdrawals by 20 percent, and by 50 percent, resulted in a modest increase in low flow in a critical habitat reach (model reach 8 near the Reading town well field); log-Pearson Type III analysis of simulated daily-mean flow indicated that under these reduced withdrawals, model reach 8 would stop flowing for a period of seven consecutive days about every other year, whereas under average 1989-93 withdrawals this reach would stop flowing for a seven consecutive day period almost every year. Simulations of no seasonal withdrawals, and simulations that stopped streamflow depletion when flow in model reach 19 was below 22 cubic feet per second, indicated flow would be maintained in model reach 8 at all times. Simulations indicated wastewater-return flows would augment low flow in proportion to the rate of return flow. Simulations of a 1.5 million gallons per day return flow rate indicated model reach 8 would stop flowing for a period of seven consecutive days about once every 5 years; simulated return flow rates of 1.1 million gallons per day indicated that model reach 8 would stop flowing for a period of seven consecutive days about every other year. Simulation of reduced seasonal withdrawals, combined with no septic effluent return flow, indicated only a slight increase in low flow compared to low flows simulated under average 1989-93 withdrawals. Simulation of reduced seasonal withdrawal, combined with 2.6 million gallons per day wastewater-return flows, provided more flow in model reach 8 than that simulated under no withdrawals.

Massachusetts

Simulation of reservoir storage and firm yields of three surface-water supplies, Ipswich River Basin, Massachusetts

A Hydrologic Simulation Program FORTRAN (HSPF) model previously developed for the Ipswich River Basin was modified to simulate the hydrologic response and firm yields of the water-supply systems of Lynn, Peabody, and Salem-Beverly. The updated model, expanded to include a portion of the Saugus River Basin that supplies water to Lynn, simulated reservoir system storage over a 35-year period (1961-95) under permitted withdrawals and hypothetical restrictions designed to maintain seasonally varied streamflow for aquatic habitat. A firm yield was calculated for each system and each withdrawal restriction by altering demands until the system failed. This is considered the maximum withdrawal rate that satisfies demands, but depletes reservoir storage. Simulations indicate that, under the permitted withdrawals, Lynn and Salem-Beverly were able to meet demands and generally have their reservoir system recover to full capacity during most years; reservoir storage averaged 83 and 82 percent of capacity, respectively. The firm yields for the Lynn and Salem-Beverly systems were 11.4 and 12.2 million gallons per day (Mgal/d), respectively, or 8 and 21 percent more than average 1998-2000 demands, respectively. Under permitted withdrawals and average 1998-2000 demands, the Peabody system failed in all years; thus Peabody purchased water to meet demands. The firm yield for the Peabody system is 3.70 Mgal/d, or 37 percent less than the average 1998-2000 demand. Simulations that limit withdrawals to levels recommended by the Ipswich River Fisheries Restoration Task Group (IRFRTG) indicate that under average 1998-2000 demands, reservoir storage was depleted in each of the three systems. Reservoir storage under average 1998-2000 demands and IRFRTG-recommended streamflow requirements averaged 15, 22, and 71 percent of capacity for the Lynn, Peabody, Salem-Beverly systems, respectively. The firm-yield estimates under the IRFRTG-recommended streamflow requirements were 6.02, 1.94, and 7.69 Mgal/d or 43, 64, and 34 percent less than the average 1998-2000 demands for the Lynn, Peabody, and Salem-Beverly systems, respectively. Simulations that limit withdrawals from the Saugus River to a less stringent set of restrictions (based on an Instream Flow Incremental Methodology study) than those previously simulated indicate that the firm yield of the Lynn system is about 31 percent less than the average 1998-2000 withdrawals (7.31 Mgal/d).

Massachusetts