Research about Hardwick, Vermont

Source-linked reports with geographic coverage including Hardwick, Vermont.

6 recordsLinked to original sources

Level II scour analysis for Bridge 29 (HARDTH00310029) on Town Highway 31, crossing the Lamoille River, Hardwick, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure HARDTH00310029 on town highway 31 crossing the Lamoille River, Hardwick, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province of north-central Vermont. The 64.4-mi 2 drainage area is in a predominantly rural basin. In the vicinity of the study site, the surface cover is pasture except for the immediate downstream channel banks and the downstream left overbank which are brush covered. In the study area, the Lamoille River has a sinuous channel with a slope of approximately 0.001 ft/ft, an average channel top width of 84 ft and an average channel depth of 4 ft. The predominant channel bed materials are cobble and gravel with a median grain size (D 50 ) of 36.1 mm (0.119 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 26, 1995, indicated that the reach was stable. The town highway 31 crossing of the Lamoille River is a 65-ft-long, one-lane bridge consisting of one 61-foot steel-beam span (Vermont Agency of Transportation, written communication, March 27, 1995). The bridge is supported by vertical, stone abutments with wingwalls. The right abutment has a concrete facing and a concrete subfooter. The channel is skewed approximately 5 degrees to the opening while the opening-skew-to-roadway is 0 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 2.7 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 10.3 to 18.6 ft. The worst-case abutment scour occurred at the 100-year discharge at the right abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 42 (HARDELMSTR0042) on Elm Street, crossing Cooper Brook, Hardwick, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure HARDELMSTR0042 on Elm Street crossing Cooper Brook, Hardwick, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in north-central Vermont. The 16.6-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the overbanks are primarily grass covered with some brush along the immediate channel banks except the upstream right bank and overbank which is forested and the downstream left overbank which has a lumberyard. In the study area, Cooper Brook has a sinuous channel with a slope of approximately 0.005 ft/ft, an average channel top width of 50 ft and an average channel depth of 6 ft. The predominant channel bed materials are sand and gravel with a median grain size (D50) of 1.25 mm (0.00409 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 24, 1995, indicated that the reach was stable. The Elm Street crossing of Cooper Brook is a 39-ft-long, two-lane bridge consisting of one 37-foot concrete span (Vermont Agency of Transportation, written communication, March 17, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 45 degrees. On August 17, 1995 the site was revisited to investigate the effect of the August 4-5, 1995 flood on the structure. Channel features such as scour holes and point bars were shifted by the high flow event. Details of these changes can be found in the Level I data form in Appendix E. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and G. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 3.4 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge which was less than the 100-year discharge. Abutment scour ranged from 7.1 to 10.4 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 28 (HARDTH00300028) on Town Highway 30, crossing the Lamoille River, Hardwick, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure HARDTH00300028 on town highway 30 crossing the Lamoille River, Hardwick, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in north-central Vermont. The 63.7-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover upstream and on the downstream right is primarily pasture with some row crops. Trees line the immediate channel banks. The left bank downstream surface cover is primarily brush. In the study area, the Lamoille River has an incised, sinuous channel with a slope of approximately 0.002 ft/ft, an average channel top width of 76 ft and an average bank height of 6 ft. The predominant channel bed materials are gravel and cobble with a median grain size (D 50 ) of 46.6 mm (0.153 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 25, 1995, indicated that the reach was laterally unstable. The site was revisited on August 21, 1995, after the August 5-6, 1995 flood on the Lamoille River. Findings from this follow-up visit are presented in Appendix G. The town highway 30 crossing of the Lamoille River is a 54-ft-long, one-lane bridge consisting of one 52-foot steel-beam span (Vermont Agency of Transportation, written communication, April 3, 1995). The bridge is supported by vertical, stone abutments with wingwalls. Scour, about one foot below the mean thalweg, exists along the right abutment and right upstream wingwall. Sheet piling has been driven around the right abutment and wingwalls and filled with concrete. The channel is skewed approximately 5 degrees to the opening while the opening-skew-to-roadway is 0 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.9 to 2.5 ft. The worst-case contraction scour occurred at the 100-year discharge. Abutment scour ranged from 11.2 to 17.8 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 24 (HARDTH00490024) on Town Highway 49, crossing Nichols Brook at Mackville Pond Outlet, Hardwick, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure HARDTH00490024 on Town Highway 49 crossing Nichols Brook at Mackville Pond Outlet, Hardwick, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in north-central Vermont. The 10.7-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is best described as suburban with residences, lawns, trees and roadways. There is a dam 54 feet downstream of the bridge which controls Mackville Pond upstream of the bridge. The vertical drop over the dam is 15 feet. Immediately upstream of the bridge the width of the waterway is 146 feet. The predominant channel bed material is sand with a median grain size (D 50 ) of 0.576 mm (0.00189 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 25, 1995, indicated that the reach was stable. The Town Highway 49 crossing of Nichols Brook at Mackville Pond Outlet is a 42-ft-long, two-lane bridge consisting of one 38-foot steel-beam span (Vermont Agency of Transportation, written communication, April 3, 1995). The bridge is supported by vertical, concrete abutments with wingwalls on the downstream end of the left abutment and upstream and downstream ends of the right abutment. The channel is not skewed to the opening, but the opening-skew-to-roadway is 5 degrees. Scour protection measures at the site include type-3 stone fill (less than 48 inches diameter) on the upstream side of the left roadway embankment and at the upstream end of the left abutment. Type-2 stone fill (less than 36 inches diameter) was on the upstream right roadway embankment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 4.7 to 21.0 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour at the left abutment ranged from 13.3 to 15.8 ft. with the worst-case occurring at the 500-year discharge. Abutment scour at the right abutment ranged from 8.1 to 9.8 ft. with the worst-case occurring at the incipient roadway-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scouredstreambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particlesize distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 23 (HARDTH00530023) on Town Highway 53, crossing Haynesville Brook, Hardwick, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure HARDTH00530023 on Town Highway 53 crossing Haynesville Brook, Hardwick, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in north-central Vermont. The 14.2-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the predominate surface cover consists of field grasses except for the upstream left bank with is brush covered. In the study area, Haynesville Brook has a sinuous channel with a slope of approximately 0.004 ft/ft, an average channel top width of 39 ft and an average channel depth of 2 ft. Stream-bed material at the site ranged from silt to gravel with a median grain size (D50) of 49.9 mm (0.164ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 27, 1995, indicated that the reach was laterally unstable. Channel scour in both the upstream and downstream reaches as well as irregular point bars and cut banks and upstream anabranching led to this assessment. The Town Highway 53 crossing of Haynesville Brook is a 33-ft-long, one-lane bridge consisting of one 26-foot steel-beam span (Vermont Agency of Transportation, written communication, March 24, 1994). The bridge is supported by vertical, concrete abutments with no wingwalls. The concrete may be facing over the original stone abutments. Sheet piling has been driven around the base of each abutment and is filled with concrete. The channel is skewed approximately 10 degrees to the opening; the opening-skew-to-roadway is also 10 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 2.0 ft. The worst-case contraction scour occurred at the 100-year discharge. Abutment scour ranged from 7.0 to 12.9 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 43 (HARDTH00CU0043) on Church Street, crossing the Lamoille River, Hardwick, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure HARDTH00CU0043 on Church Street crossing the Lamoille River, Hardwick, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in north-central Vermont. The 87.6-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is best characterized as suburban except for the downstream right surface cover which is pasture. In the study area, the Lamoille River has an incised, straight channel with a slope of approximately 0.004 ft/ft, an average channel top width of 90 ft and an average channel depth of 8 ft. The predominant channel bed materials are cobble and gravel with a median grain size (DM 50 ) of 99.5 mm (0.327 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 26, 1995, indicated that the reach was stable. The Church Street crossing of the Lamoille River is a 100-ft-long, two-lane bridge consisting of one 97-foot steel-beam span (Vermont Agency of Transportation, written communication, March 17, 1995). The bridge is supported by a vertical, stone abutment with wingwalls on the left and a vertical concrete abutment with a stone spill-through slope on the right. The channel is skewed approximately 5 degrees to the opening while the opening-skew-to-roadway is 0 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.8 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge. Abutment scour ranged from 6.2 to 10.9 ft at the left abutment with worst-case occurring at the incipientovertopping discharge. Abutment scour ranged from 8.5 to 12.3 ft at the right abutment with worst-case occurring at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A crosssection of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont