Search USGSSearch

Geology topics

Research about Barnstable, Massachusetts

Source-linked reports with geographic coverage including Barnstable, Massachusetts.

2 recordsLinked to original sources

Reducing wastewater nitrogen loading by >90% with carbon-amended septic systems: A field demonstration in Barnstable (Cape Cod), Massachusetts

Onsite wastewater treatment systems (OWTS) are a major source of excess nutrients and co-pollutants in watersheds across the United States. In Barnstable County (Cape Cod), Massachusetts, effluent from septic systems and cesspools contributes approximately 80% of the controllable reactive nitrogen (N) load to numerous impaired estuaries and degrades water quality in the region's sole source aquifer, streams and ponds. In unsewered areas, wastewater N loads could be reduced substantially by Innovative/Alternative (I/A) septic systems designed for enhanced removal. Use, however, has been partly limited by the availability of high performing, cost effective options, while conventional septic systems continue to be installed in watersheds with well documented N impairments. This paper describes the strategic replacement of residential OWTS with two I/A models that incorporate woodchip bioreactors to enhance N removal. Systems were installed at 14 neighboring homes in Barnstable, MA, and monitored for field performance. Influent and effluent were sampled monthly and analyzed for N and phosphorus (P), among other water quality indicators. Flow to each system was continuously metered to estimate nutrient loads. Results from the first 25 months of monitoring for 13 systems with at least a full year of data are presented in terms of 1) reductions in nutrient concentrations and mass loads and 2) reliability of the systems for meeting a performance goal of total N (TN) < 10 mg/L. Discussion supports consideration of where and how these technologies may be successfully used to manage excess N in sensitive watersheds.

Massachusetts

Simulated water-table and pond-level responses to proposed public water-supply withdrawals in the Hyannis Ponds Wildlife Management Area, Barnstable, Massachusetts

The glacial kettle ponds in the Hyannis Ponds Wildlife Management Area in Barnstable, Massachusetts, support a community of rare and endangered plants. The ponds are hydraulically connected to the unconfined aquifer that underlies Cape Cod. The plants are adapted to the rise and fall of water levels in the ponds as the water table fluctuates in response to seasonal and year-to-year natural changes in recharge. Pumping from wells for public water supply and recharge of wastewater at water pollution control facilities and septic systems also affect groundwater levels. The Hyannis Water System has proposed to install two additional wells in the Hyannis Ponds Wildlife Management Area and adjust rates of withdrawals and recharge of wastewater return flows for the municipal system that serves the village of Hyannis in the town of Barnstable. The proposal has raised concerns that pumping from the proposed wells could cause long-term average changes in pond levels that could adversely affect the critical pond-shore plant habitat. An available three-dimensional steady-state groundwater-flow model was used to simulate the hydrologic effects of nine pumping and wastewater return-flow scenarios prepared by the Hyannis Water System. These effects were quantified by comparison of water levels simulated for the scenarios to water levels simulated for a reference condition based on 2015 withdrawal and wastewater return-flow rates. Maps of water-level responses were prepared to show the effects of pumping from a single well at different locations in the Hyannis Ponds Wildlife Management Area on the water levels of six ponds. Steady-state simulations of the nine scenarios indicated that the shapes of the simulated water-table contours near the wildlife management area changed only slightly at the regional scale, with the largest shifts near the wildlife management area and the Barnstable Water Pollution Control Facility. The simulated changes in pond levels at 10 ponds of interest for the nine scenarios relative to the simulated pond levels for the 2015 reference condition ranged from small increases (less than 0.1 foot) in one pond each in two scenarios to declines (drawdowns) of 1.03–1.11 feet at three ponds in one scenario. Water levels at the Barnstable Water Pollution Control Facility increased because part of the increase in total withdrawals from the Hyannis Water System wells was recharged as wastewater at the water pollution control facility.

Massachusetts