Search USGSSearch

Geology topics

Stephen R. Holnbeck

Publications and source records attributed to Stephen R. Holnbeck.

10 recordsLinked to original sources

Evaluating the use of video cameras to estimate bridge scour potential at four bridges in southwestern Montana

The U.S. Geological Survey, in cooperation with the Montana Department of Transportation, installed cameras and large-scale particle image velocimetry (LSPIV) recording equipment at four sites where the U.S. Geological Survey and Montana Department of Transportation are monitoring bridge scour using other methods. Determination of stream velocities is an important component of hydraulic engineering, river ecology, and fluvial geomorphology. LSPIV is an emerging technique that can be used to estimate stream surface velocities and streamflow using video cameras. Video from the camera is referenced to known locations on streambanks, and postprocessed using computer software that calculates water surface velocity and flow direction between video frames. The goal of the study was to determine if LSPIV can increase the accuracy of current bridge scour prediction methods using video recordings from 2019 to 2021. Scour around piers is one of the primary failure mechanisms for bridges and poses threats to public safety and interstate commerce. LSPIV installations can capture the flow velocities and directions near bridge piers where other measurement methods might fail or be too dangerous. Additional benefits to the LSPIV technique were continuous data collection throughout the hydrologic cycle and enhanced safety of the methods for estimating velocity magnitude and direction during flood events. Limitations of the LSPIV technique included the angle of the camera to incoming flow; video recordings that were not usable because of ice cover, night, or high winds; and vegetation along the streambank that interfered with water flow analysis. Future applications of the LSPIV technique may continue to improve the processing of the video and reduce limitations for this process.

Montana

Near-field remote sensing of surface velocity and river discharge using radars and the probability concept at 10 USGS streamgages

Near-field remote sensing of surface velocity and river discharge (discharge) were measured using coherent, continuous wave Doppler and pulsed radars. Traditional streamgaging requires sensors be deployed in the water column; however, near-field remote sensing has the potential to transform streamgaging operations through non-contact methods in the U.S. Geological Survey (USGS) and other agencies around the world. To differentiate from satellite or high-altitude platforms, near-field remote sensing is conducted from fixed platforms such as bridges and cable stays. Radar gages were collocated with 10 USGS streamgages in river reaches of varying hydrologic and hydraulic characteristics, where basin size ranged from 381 to 66,200 square kilometers. Radar-derived mean-channel (mean) velocity and discharge were computed using the probability concept and were compared to conventional instantaneous measurements and time series. To test the efficacy of near-field methods, radars were deployed for extended periods of time to capture a range of hydraulic conditions and environmental factors. During the operational phase, continuous time series of surface velocity, radar-derived discharge, and stage-discharge were recorded, computed, and transmitted contemporaneously and continuously in real time every 5 to 15 min. Minimum and maximum surface velocities ranged from 0.30 to 3.84 m per second (m/s); minimum and maximum radar-derived discharges ranged from 0.17 to 4890 cubic meters per second (m 3 /s); and minimum and maximum stage-discharge ranged from 0.12 to 4950 m 3 /s. Comparisons between radar and stage-discharge time series were evaluated using goodness-of-fit statistics, which provided a measure of the utility of the probability concept to compute discharge from a singular surface velocity and cross-sectional area relative to conventional methods. Mean velocity and discharge data indicate that velocity radars are highly correlated with conventional methods and are a viable near-field remote sensing technology that can be operationalized to deliver real-time surface velocity, mean velocity, and discharge.

Alaska, Colorado, Montana, New Mexico, North Dakot

Investigation of pier scour in coarse-bed streams in Montana, 2001 through 2007

A primary goal of ongoing field research of bridge scour is improvement of scour-prediction equations so that pier-scour depth is predicted accurately-an important element of hydraulic analysis and design of highway bridges that cross streams, rivers, and other waterways. Scour depth for piers in streambeds with a mixture of sand, gravel, cobbles, and boulders (coarse-bed streams, which are common in Montana) generally is less than the scour depth in finer-grained (sandy) streambeds under similar conditions. That difference is attributed to an armor layer of coarser material. Pier-scour data from the U.S. Geological Survey were used in this study to develop a bed-material correction factor, which was incorporated into the Federal Highway Administration's recommended equation for computing pier scour. This report describes results of a study of pier scour in coarse-bed streams at 59 bridge sites during 2001-2007 in the mountain and foothill regions of western Montana. Respective drainage areas ranged from about 3 square miles (mi 2 ) to almost 20,000 mi 2 . Data collected and analyzed for this study included 103 pier-scour measurements; the report further describes data collection, shows expansion of the national coarse pier-scour database, discusses use of the new data in evaluation of relative accuracy of various predictive equations, and demonstrates how differences in size and gradation between surface bed material and shallow-subsurface bed material might relate to pier scour. Nearly all measurements were made under clear-water conditions with no incoming sediment supply to the bridge opening. Half of the measurements showed approach velocities that equaled or surpassed the critical velocity for incipient motion of bed material, possibly indicating that measurements were made very near the threshold between clear-water and live-bed scour, where maximum scour was shown in laboratory studies. Data collected in this study were compared to selected pier-scour data from the nationwide Bridge Scour Data Management System (BSDMS), to show the effect of bed-material size and gradation on scour depth. Unsteady field flow conditions and armoring by coarser material reduced scour relative to the clear-water/sandy-bed laboratory results at steady flow. The new correction factor and the standard scour equation produced the most accurate estimates of scour depth in armored, coarse-bed conditions. Maximum relative scour occurred at similar velocity across variations in bed material and gradation. Pier scour decreased with increased variation in particle size and gradation.

Montana

Sediment-transport investigations of the upper Yellowstone River, Montana, 1999 through 2001: Data collection, analysis, and simulation of sediment transport

The upper Yellowstone River in Montana is an important State and national water resource, providing recreational, agricultural, and commercial benefits. Floods in 1996 and 1997, with recorded peak discharges having recurrence intervals close to 100 years, caused substantial streambank erosion and hill- slope mass wasting. Large quantities of sand-, gravel-, and cobble-sized material entrained by the flood flows became flood-bar deposits, creating a source of sediment available for transport during future floods. The flood damage and resulting sedimentation raised concerns about potential streambank-stabilization projects and how the river and riparian corridor might be managed in the future. The U.S. Geological Survey, in cooperation with the Park Conservation District, the Montana Department of Transportation, and the U.S. Army Corps of Engineers, investigated sediment transport in the upper Yellowstone River near Livingston from 1999 through 2001 as part of a cumulative effects study to provide a scientific basis for future river management decisions. The purpose of this report is to present the results of data collection, analysis, and simulation of sediment transport for the upper Yellowstone River. The study area included a 13.5-mile study reach of the upper Yellowstone River where substantial sediment transport occurred in 1996 and 1997. In this study area, the upper Yellowstone River is a high gradient, coarse-bed stream having a slope of about 0.0028 foot per foot or more than 14 feet per mile. The study area drains about 3,551 square miles, and runoff results primarily from snowmelt during the spring and summer months. As part of sediment-transport investigations, the U.S. Geological Survey surveyed river cross sections, characterized streambed-material particle size using particle counts and sieve analyses, and collected bedload- and suspended-sediment data during three runoff seasons (1999-2001). Data were collected for stream discharges that ranged from 2,220 cubic feet per second (typical of pre- and post-runoff discharge) to 25,100 cubic feet per second (about 125 percent of bankfull discharge). The distribution of streambed-material particle size was determined, and sediment-transport curves for bedload discharge, suspended-sediment discharge, and total-sediment discharge were developed. The threshold values of streamflow and average stream velocity needed for initiation of bedload transport for selected sediment-size classes showed that little to no bedload was transported for an average stream velocity below about 3 feet per second, and the only particle size transported as bedload at that velocity was sand. Over the range of stream discharges sampled and with silt- and finer-sized particles excluded, bedload discharge averaged about 18 percent of the total-sediment discharge, equal to bedload discharge plus suspended-sediment discharge. At the lowest and highest stream discharges sampled, bedload was, respectively, less than about 2 percent and about 30 percent of the total-sediment discharge. Over the range of stream discharges sampled, the sand-sized part of the total suspended-sediment discharge averaged about 48 percent, where the total suspended-sediment discharge included sand-, silt- and finer-sized particles. At the lowest and highest stream discharges sampled, the sand-sized part of the total suspended-sediment discharge was, respectively, less than about 16 percent and about 50 percent of the total suspended-sediment discharge. The sediment-transport curves were compared to curves for selected sites in the western United States having drainage areas ranging from 21 square miles to over 20,000 square miles. Daily sediment loads transported at bankfull discharge were calculated for each site and results were plotted in relation to drainage area. Results based on the 1999-2001 data-collection period indicate that the estimated daily bedload transported at bankfull discharge in the upper Yellowstone River exceeded the envelope line that bounds the upper end of the data for other selected sites in the Northern Rocky Mountains and is similar in magnitude to that for selected sites in Alaska having braided channels and glacial and snowmelt runoff. Similar comparisons for suspended sediment indicate that daily suspended-sediment load at bankfull discharge is relatively high in the upper Yellowstone River, plotting slightly above the envelope line that bounds the upper end of the data for other selected sites in the Northern Rocky Mountains. Sediment data were used to develop individual transport equations for seven size classes of sediment ranging from small cobbles to very fine sand. A step-wise regression procedure relating sediment discharge to important hydraulic variables showed that average stream velocity was the only significant variable at the 95-percent confidence level. Bedload and suspended-sediment data and equations indicate that more sand is transported for a given velocity than any other particle size, and very little sand-size sediment load is transported below an average stream velocity of about 2.5 feet per second. Transport of coarser-sized sediment (limited to bedload) becomes very little for an average velocity less than about 3.5 feet per second. Results for the 1999-2001 data-collection period indicate that sediment transport in the upper Yellowstone River tends to be limited more by the transport capacity of the stream (capacity or transport limited), than to the availability of sediment in the watershed (supply limited). Sediment data collected and analyzed were used to simulate sediment transport in the study reach using the BRIdge Stream Tube model for Alluvial River Simulation, or BRI-STARS computer model. The model was calibrated and verified using selected data from historical runoff periods. Simulated total-sediment loads, on a reach-averaged basis, were in good agreement with the total-sediment loads determined from the transport curve for the 2-year flood hydrograph but were considerably smaller for the total-sediment loads determined from the transport curve for the 50-, 100-, and 500-year flood hydrographs. The differences probably were largely due to the inability of the model to simulate streambank erosion, hillslope mass-wasting, and other channel-widening processes, which had supplied substantial quantities of sediment to the channel during the 1996 and 1997 floods, and probably continued to contribute to the sediment load in the subsequent years (1999-2001) when the data were collected. Furthermore, the transport curve was applied beyond the measured data for the highest discharges, and may thus be unreliable. Also, the transport curve derived from only limited data may not apply over the full duration of the hydrograph and sediment might be transported over only a portion of the hydrograph, especially for rivers like the upper Yellowstone where snowmelt runoff predominates. The true sediment discharge is, therefore, unknown and might be closer to the simulated values than to the values calculated from the transport curve.

Montana

Evaluation of pier-scour equations for coarse-bed streams

Streambed scour at bridge piers is among the leading causes of bridge failure in the United States. Several pier-scour equations have been developed to calculate potential scour depths at existing and proposed bridges. Because many pier-scour equations are based on data from laboratory flumes and from cohesionless silt- and sand-bottomed streams, they tend to overestimate scour for piers in coarse-bed materials. Several equations have been developed to incorporate the mitigating effects of large particle sizes on pier scour, but further investigations are needed to evaluate how accurately pier-scour depths calculated by these equations match measured field data. This report, prepared in cooperation with the Montana Department of Transportation, describes the evaluation of five pier-scour equations for coarse-bed streams. Pier-scour and associated bridge-geometry, bed-material, and streamflow-measurement data at bridges over coarse-bed streams in Montana, Alaska, Maryland, Ohio, and Virginia were selected from the Bridge Scour Data Management System. Pier scour calculated using the Simplified Chinese equation, the Froehlich equation, the Froehlich design equation, the HEC-18/Jones equation and the HEC-18/Mueller equation for flood events with approximate recurrence intervals of less than 2 to 100 years were compared to 42 pier-scour measurements. Comparison of results showed that pier-scour depths calculated with the HEC-18/Mueller equation were seldom smaller than measured pier-scour depths. In addition, pier-scour depths calculated using the HEC-18/Mueller equation were closer to measured scour than for the other equations that did not underestimate pier scour. However, more data are needed from coarse-bed streams and from less frequent flood events to further evaluate pier-scour equations.

Scientific Investigations Report

Rapid-estimation method for assessing scour at highway bridges

A method was developed by the U.S. Geological Survey for rapid estimation of scour at highway bridges using limited site data and analytical procedures to estimate pier, abutment, and contraction scour depths. The basis for the method was a procedure recommended by the Federal Highway Administration for conducting detailed scour investigations, commonly referred to as the Level 2 method. Using pier, abutment, and contraction scour results obtained from Level 2 investigations at 122 sites in 10 States, envelope curves and graphical relations were developed that enable determination of scour-depth estimates at most bridge sites in a matter of a few hours. Rather than using complex hydraulic variables, surrogate variables more easily obtained in the field were related to calculated scour-depth data from Level 2 studies. The method was tested by having several experienced individuals apply the method in the field, and results were compared among the individuals and with previous detailed analyses performed for the sites. Results indicated that the variability in predicted scour depth among individuals applying the method generally was within an acceptable range, and that conservatively greater scour depths generally were obtained by the rapid-estimation method compared to the Level 2 method. The rapid-estimation method is considered most applicable for conducting limited-detail scour assessments and as a screening tool to determine those bridge sites that may require more detailed analysis. The method is designed to be applied only by a qualified professional possessing knowledge and experience in the fields of bridge scour, hydraulics, and flood hydrology, and having specific expertise with the Level 2 method.

Conference Paper

Procedures for estimating unit hydrographs for large floods at ungaged sites in Montana

Flood hydrographs for 26 gaging stations and rainfall data were used together with a rainfall-runoff simulation model to derive unit hydrographs and important unit-hydrograph variables. Methods were developed for estimating unit hydrographs at ungaged sites using either the Clark or dimensionless unit-hydrograph methods. The 26 derived unit hydrographs were compared with those calculated by the two estimation methods. The two methods performed about equally well in matching derived unit-hydrograph peaks and shapes.

Montana

Relation between largest known flood discharge and elevation in Montana

Previous studies relating unit discharge to elevation indicated that large floods in the Rocky Mountains may be limited by elevation. However, high-elevation data are sparse in Montana and the indications may not be entirely correct. Based on data at 19 sites in Montana, a strong log-linear relation exists between large-flood discharge and drainage area. The use of unit discharge (peak discharge divided by drainage area) to compare flood magnitude from site to site may thus be biased and tend to overstate flood magnitude for small basins. Removal of the bias by use of a revised unit discharge (peak discharge divided by drainage area raised to the 0.16 power) results in no apparent relation between revised unit discharge and elevation in two areas of Montana. However, because of a paucity of data, the magnitude of revised unit discharge at elevations greater than 1,650 m is largely unknown. Additional data and research are needed to resolve questions about mountain flood hydrology.

Conference Paper