Search USGSSearch

Geology topics

Scott A. Olson

Publications and source records attributed to Scott A. Olson.

At least 55 records · Page 3Linked to original sources

Level II scour analysis for Bridge 43 (BENNCYDEPO0043) on Depot Street, crossing the Walloomsac River, Bennington, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BENNCYDEPO0043 on the Depot Street crossing of the Walloomsac River, Bennington, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in southwestern Vermont. The 30.1-mi 2 drainage area is a predominantly rural and forested basin. The bridge site is located within an urban setting in the Town of Bennington with buildings and parking lots on overbanks. In the study area, the Walloomsac River has a straight channel with constructed channel banks through much of the reach. The channel is located on a delta and has a slope of approximately 0.02 ft/ft, an average channel top width of 48 ft and an average bank height of 6 ft. The predominant channel bed material is cobble with a median grain size (D 50 ) of 108 mm (0.356 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 5, 1996, indicated that the reach was stable. The Depot Street crossing of the Walloomsac River is a 46-ft-long, two-lane bridge consisting of one 40-foot concrete span (Vermont Agency of Transportation, written communication, December 13, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 5 degrees to the opening and the opening-skew-to-roadway is 15 degrees. Scour countermeasures at the site include type-2 stone fill (less than 36 inches diameter) at the upstream end of the upstream right wing wall and type-1 stone fill (less than 12 inches diameter) along the base of the upstream left wing wall. Downstream banks are protected by concrete and stone walls. The upstream right bank is protected by alternating type-2 stone fill and masonry walls. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour computed for all modelled flows ranged from 0.0 to 4.1 ft. The worst-case contraction scour occurred at the 500-year discharge. Computed right abutment scour ranged from 2.9 to 13.4 ft. with the worst-case scour occurring at the 500-year discharge. Computed left abutment scour ranged from 5.6 to 16.3 ft. with the worst-case scour also occurring at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 49 (BENNCYHUNT0049) on Hunt Street, crossing the Walloomsac River, Bennington, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BENNCYHUNT0049 on the Hunt Street crossing of the Walloomsac River, Bennington, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in southwestern Vermont. The 34.1-mi 2 drainage area is a predominantly rural and forested basin. The bridge site is located within an urban setting in the Town of Bennington with buildings and parking lots on overbanks except for the downstream left bank which is covered by trees and brush. In the study area, the Walloomsac River has a straight, incised channel. The confluence of the Walloomsac River and Roaring Branch is 140 feet downstream. The channel has a slope of approximately 0.01 ft/ft, an average channel top width of 54 ft and an average bank height of 6 ft. The predominant channel bed material is cobble with a median grain size (D 50 ) of 76.8 mm (0.252 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 31, 1996, indicated that the reach was stable. The Hunt Street crossing of the Walloomsac River is a 51-ft-long, two-lane bridge consisting of one 49-foot steel span (Vermont Agency of Transportation, written communication, December 13, 1995). The bridge is supported by vertical, concrete abutments. The right abutment has a spill-through slope along its face. The channel is skewed approximately 25 degrees to the opening and the opening-skew-to-roadway is 20 degrees. Scour countermeasures at the site include type-2 stone fill (less than 36 inches diameter) on the spill through slope on the right abutment and along the base of the left abutment. Type- 2 stone fill also protects the channel banks upstream and downstream of the bridge for a minimum distance of 17 feet from the respective bridge faces. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour computed for all modelled flows ranged from 0.9 to 5.0 ft. The worst-case contraction scour occurred at the 500-year discharge. Computed left abutment scour ranged from 15.3 to 16.5 ft. with the worst-case scour occurring at the incipient roadway-overtopping discharge. Computed right abutment scour ranged from 6.0 to 8.7 ft. with the worst-case scour occurring at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 23 (GLOVTH00410023) on Town Highway 41, crossing Sherburne Brook, Glover, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure GLOVTH00410023 on Town Highway 41 crossing Sherburne Brook, Glover, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in northern Vermont. The 2.57-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is primarily forest with small areas of lawn and a home on the right overbank and a gravel roadway along the upstream left bank. In the study area, Sherburne Brook has an incised, sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 33 ft and an average bank height of 6 ft. The channel bed material ranges from gravel to boulder with a median grain size (D 50 ) of 57.3 mm (0.188 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 24, 1994, indicated that the reach was stable. The Town Highway 41 crossing of Sherburne Brook is a 24-ft-long, one-lane bridge consisting of one 21-foot steel-beam span with a timber deck (Vermont Agency of Transportation, written communication, August 4, 1994). The opening length of the structure parallel to the bridge face is 20.3 ft. The bridge is supported by vertical, granite block abutments. The channel is skewed approximately 55 degrees to the opening while the measured opening-skew-to-roadway is 30 degrees. One foot of scour below the mean thalweg depth was observed along the right abutment undermining the abutment by 0.5 feet vertically. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.4 to 0.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 4.6 to 7.2 ft. The worst-case abutment scour also occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 10 (BENNUS00070010) on U.S. Route 7, crossing the Walloomsac River, Bennington, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BENNUS00070010 on U.S. Route 7, also known as North Street, crossing of the Walloomsac River, Bennington, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in southwestern Vermont. The 30.1-mi 2 drainage area is a predominantly rural and forested basin. The bridge site is located within an urban setting in the Town of Bennington with buildings, parking lots, lawns, and a playground on the overbank areas. In the study area, the Walloomsac River has a straight channel with constructed channel banks through much of the reach. The channel is located on a delta and has a slope of approximately 0.02 ft/ft, an average channel top width of 37 ft and an average bank height of 5 ft. The predominant channel bed material is cobble with a median grain size (D 50 ) of 96.0 mm (0.315 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 5, 1996, indicated that the constructed reach was stable. The U.S. Route 7 crossing of the Walloomsac River is a 53-ft-long, two-lane bridge consisting of one 50-foot steel span (Vermont Agency of Transportation, written communication, September 27, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The wingwalls are angled in toward the channel because the widths of the upstream and downstream constructed channel banks are narrower than the bridge opening. The channel is skewed approximately 5 degrees to the opening and the opening-skew-to-roadway is 10 degrees. Scour countermeasures at the site include masonry and stone walls on both the upstream and downstream banks. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour computed for all modelled flows ranged from 0.0 to 0.1 ft. The worstcase contraction scour occurred at the 500-year discharge. Computed left abutment scour ranged from 5.9 to 6.8 ft. with the worst-case scour occurring at the 500-year discharge. Computed right abutment scour for all modelled flows was 6.8 ft. Total scour depths for all modelled flows did not exceed the depth of the abutment footings. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 20 (IRASTH00080020) on Town Highway 8, crossing the Black River, Irasburg, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure IRASTH00080020 on town highway 8 crossing the Black River, Irasburg, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, available from VTAOT files, was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the New England Upland physiographic province of north-central Vermont in the town of Irasburg. The 110-mi 2 drainage area is in a predominantly rural basin. In the vicinity of the study site, the left bank surface cover is pasture and row crops and the right bank is covered by shrub and brush and is adjacent to woods. In the study area, the Black River has a sinuous channel with a slope of approximately 0.002 ft/ft, an average channel top width of 90 ft and an average channel depth of 5 ft. The predominant channel bed material is gravel and cobbles (D 50 is 49.7 mm or 0.163 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 4, 1994, indicated that the reach was laterally unstable. The town highway 8 crossing of the Black River is a 88-ft-long, one-lane covered bridge consisting of one 80-foot span (Vermont Agency of Transportation, written commun., August 2, 1994). The bridge is supported by vertical, concrete abutments with wingwalls on the upstream and downstream sides of the right abutment. The right abutment has stone fill protection. The channel is skewed approximately 25 degrees to the opening while the opening-skew-to-roadway is zero degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 22 (WODSTH00180022) on Town Highway 18, crossing north Bridgewater Brook, Woodstock, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WODSTH00180022 on town highway 18 crossing North Bridgewater Brook, Woodstock, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, available from VTAOT files, was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont. The 4.34-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left bank is forested and the right bank is covered by shrub and brush and is adjacent to woods. The right bank of North Bridgewater Brook is parallel to town highway 18 upstream of the bridge. In the study area, North Bridgewater Brook has a sinuous channel with a slope of approximately 0.038 ft/ft, an average channel top width of 48 ft and an average channel depth of 7 ft. The predominant channel bed materials are gravel and cobbles (D 50 is 63.2 mm or 0.207 ft). Due to cut banks and other channel features the geomorphic assessment at the time of the Level I and Level II site visit on August 16, 1994, indicated that the reach was laterally unstable. In addition, the stream approach to the bridge has a high gradient. However, near the upstream face of the bridge the gradient shallows. Approximately 100 feet downstream of the bridge the gradient steepens again. The town highway 18 crossing of North Bridgewater Brook is a 40-ft-long, two-lane bridge consisting of one 35-foot concrete span (Vermont Agency of Transportation, written commun., August 2, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The left and right abutments are not protected by stone fill. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 46 (NORWTH00030046) Town Highway 3 (VT132) crossing the Ompompanoosuc River, Norwich, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure NORWTH00030046 on town highway 3, which is also Vermont State Route 132 crossing the Ompompanoosuc River, Norwich, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, available from VTAOT files, was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the New England Upland physiographic province of east-central Vermont. The 135-mi 2 drainage area is a predominantly rural basin. A flood-control reservoir located approximately 2 mi upstream has 1.66 billion cubic feet of usable storage. In the vicinity of the study site, the left bank is forested and the right bank is covered by shrubs and brush, adjacent to woods. The Ompompanoosuc River is parallel to Town Highway 3. In the study area, the Ompompanoosuc River has a sinuous channel with a slope of approximately 0.003 ft/ft, an average channel top width of 166 ft and an average channel depth of 6 ft. The predominant channel bed material is sand (D 50 is 0.744 mm or 0.00244 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 19, 1994, indicated that the reach was stable. The town highway 3 crossing of the Ompompanoosuc Riveris a 100-ft-long, two-lane bridge consisting of two steel-beam spans (Vermont Agency of Transportation, written commun., July 29, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 25 degrees to the opening while the opening-skew-to-roadway is 12 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 42 (RANDVT00120042) on State Highway 12, crossing Third Branch White River, Randolph, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure RANDVT00120042 on State Highway 12 crossing the Third Branch White River, Randolph, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic division of central Vermont in the town of Randolph. The 61.9-mi 2 drainage area is in a predominantly rural drainage basin. In the vicinity of the study site, the left and right banks have moderate tree cover with residential and commercial buildings on the overbank areas. In the study area, the Third Branch White River has a sinuous channel with a slope of approximately 0.013 ft/ft, an average channel top width of 133 ft and an average channel depth of 5 ft. The predominant channel bed material is gravel with a median grain size ( D 50 ) of 49.6 mm (0.163 ft). Bank material is sand and gravel (D 50 is 3.08 mm or 0.010 ft). The geomorphic assessment at the time of the Level I site visits on July 8, 1994 and December 13, 1994, indicated that the reach has experienced vertical degradation. A drop structure has been constructed downstream of the bridge to prevent further degradation. In addition to the degradation of the stream bed, there is local pier scour at the bridge site as well. At the nose of the pier in the main channel, the bed is approximately three feet below the mean thalweg and two feet below the bottom of the pier footing. The State Highway 12 crossing of the Third Branch White Riveris a 220-ft-long, two-lane bridge consisting of four concrete spans. The maximum span length is 57 ft. (Vermont Agency of Transportation, written commun., July 29, 1994). The bridge is supported by vertical, concrete abutments and three concrete piers. The toe of the left abutment is at the channel edge. The toe of the right abutment is set back on the right over-bank. The roadway centerline on the structure has a slight horizontal curve; however, the main channel is skewed approximately 5 degrees to the bridge. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 28 (BRIDTH00440028) on Town Highway 044 crossing Plymouth Brook, Bridgewater, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRIDTH00440028 on town highway 44 crossing Plymouth Brook, Bridgewater, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic division of central Vermont in the town of Bridgewater. The 11.3-mi 2 drainage area is a predominantly rural basin. In the vicinity of the study site, the left and right banks are pasture. In the study area, Plymouth Brook has an incised channel with a slope of approximately 0.0054 ft/ft, an average channel top width of 42 ft and an average channel depth of 3 ft. The predominant channel bed material is gravel (D 50 is 62.3 mm or 0.204 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 9, 1994, indicated that the reach was stable. The town highway 5 crossing of the Black River is a 70-ft-long, two-lane bridge consisting of one 65-foot clear span (Vermont Agency of Transportation, written commun., August 2, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. There is also a retaining wall along the upstream side of the road embankments. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 3.0 ft deeper than the mean thalweg depth was observed along the right abutment. The scour hole was 27 feet long, 15 feet wide, and was 2.5 feet below the abutment footing at the time of the Level I assessment. This right abutment had numerous cracks and had settled. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 6 (IRASTH00050006) on Town Highway 5, crossing the Black River, Irasburg, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure IRASTH00050006 on town highway 5 crossing the Black River, Irasburg, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files were compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the New England Upland physiographic province of north-central Vermont. The 91.1-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left and right banks are forested and a residence is located on the downstream left overbank. In the study area, the Black River has an incised, sinuous channel with a slope of approximately 0.05 ft/ft, an average channel top width of 116 ft and an average bank-full channel depth of 2.8 ft. The predominant channel bed material is cobble (D 50 is 240 mm or 0.789 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 4, 1994, indicated that the reach was stable. The town highway 5 crossing of the Black River is a 70-ft-long, two-lane bridge consisting of one 65-foot clear span (Vermont Agency of Transportation, written commun., August 2, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. There is also a retaining wall along the upstream side of the road embankments. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 3.0 ft deeper than the mean thalweg depth was observed along the right abutment. The scour hole was 27 feet long, 15 feet wide, and was 2.5 feet below the abutment footing at the time of the Level I assessment. This right abutment had numerous cracks and had settled. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 27 (BRIDTH00490027) on Town Highway 049, crossing Broad Brook, Bridgewater, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRIDTH00490027 on town highway 49 crossing Broad Brook, Bridgewater, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bridgewater. The 13.9-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left and right banks are pasture with moderate tree cover on the immediate banks. Upstream of bridge 27, a gravel road runs parallel to the left bank. In the study area, the Broad Brook has an incised channel with a slope of approximately 0.007 ft/ft, an average channel top width of 54 ft and an average channel depth of 4 ft. The predominant channel bed materials are gravel and cobble with a D 50 (median diameter) of 77.9 mm or 0.256 ft. The geomorphic assessment at the time of the Level I and Level II site visit on November 9, 1994, indicated that the reach was stable. The town highway 49 crossing of the Broad Brook is a 32-ft-long, one-lane bridge consisting of one 31-ft steel-beam span (Vermont Agency of Transportation, written commun., August 24, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The left abutment is noted as settled due to previous undermining. Type-2 (less than 3 ft diameter) stone fill protects the upstream left and right wingwalls, the downstream right wingwall, the right abutment, the upstream right road embankment, and the downstream left and right road embankments. Type-3 (less than 4 ft diameter) stone fill protects the downstream left wingwall, but it’s condition was reported as slumping. The channel is skewed approximately 10 degrees to the opening; the opening-skew-to-roadway is also 10 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 57 (BRIDTH00650057) on Town Highway 65, crossing Broad Brook, Bridgewater, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRIDTH00650057 on Town Highway 65 crossing Broad Brook, Bridgewater, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, available from VTAOT files, was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bridgewater. The 26.9-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the US left bank is forested; DS left bank is shrub and brushland; US right bank is lawn and the DS right bank has very little vegetation and is largely coincident with the Ottauquechee River. In the study area, Broad Brook has an incised channel with a slope of approximately 0.0067 ft/ft, an average channel top width of 60 ft and an average channel depth of 3 ft. The predominant channel bed material is gravel (D 50 is 46.2 mm or 0.151 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 25, 1994, indicated that the reach was stable. The Town Highway 65 crossing of Broad Brook is a 47-ft-long, one-lane bridge consisting of one 44-ft steel-beam span with a timber deck, supported by vertical concrete abutments with wingwalls on the upstream and downstream sides (Vermont Agency of Transportation, written commun., August, 1994). The US right wingwall and road approach is protected by stone fill. The US and DS right wingwalls and the right abutment are reported as having 1.0 to 1.5 ft of scour at the time of the Level one assessment on 10/25/94. Erosion from road wash affects all road approach embankments. Broad Brook flows into the Ottauquechee River approximately 30 ft downstream of the bridge. The channel approach to the bridge is straight with the bridge skewed 20 degrees to flow and the opening skew-to-roadway is 0 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term aggradation or degradation; 2) contraction scour (due to reduction in flow area caused by a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute scour depths for contraction and local scour and a summary of the results follows. Contraction scour for all modelled flows ranged from 0.4 ft to 1.5 ft and the worst-case contraction scour occurred at the incipient overtopping discharge. Abutment scour ranged from 6.0 ft to 14.6 ft and the worst-case abutment scour occurred at the 100-year discharge. Scour depths and depths to armoring are summarized on p. 14 in the section titled “Scour Results”. Scour elevations, based on the calculated depths are presented in tables 1 and 2; a graph of the scour elevations is presented in figure 8 Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. For all scour presented in this report, “the scour depths adopted [by VTAOT] may differ from the equation values based on engineering judgement” (Richardson and others, 1993, p. 21, 27). It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results.

Vermont

Level II scour analysis for Bridge 34 (RANDTH00660034) on Town Highway 66, crossing Second Branch White River, Randolph, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure RANDTH00660034 on town highway 66 crossing the Second Branch White River, Randolph, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic division of central Vermont in the town of Randolph. The 51.3-mi 2 drainage area is in a predominantly rural basin. In the vicinity of the study site, the left and right banks are covered by fields with some brush on the upstream left and downstream right banks and with row crops on the downstream left overbank. In the study area, the Second Branch White River has a sinuous channel with a slope of approximately 0.002 ft/ft, an average channel top width of 60 ft and an average channel depth of 7 ft. The predominant channel bed material is sand (D 50 is 1.34 mm or 0.0044 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 11, 1994, indicated that the reach was laterally unstable. Channel scour is evident along the left half of the channel from about 30 feet upstream to about 20 feet downstream of the bridge. There is a cut bank with block failures along the left bank upstream of the bridge further indicating instability of the stream reach. The town highway 66 crossing of the Second Branch White Riveris a 57-ft-long, one-lane covered bridge consisting of one 45-foot span (Vermont Agency of Transportation, written communication, July 29, 1994). The bridge is supported by vertical, concrete abutments with one wingwall on the upstream left side. The base of the left abutment was protected by type-1 stone fill (less than 12 inches diameter). The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 45 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term aggradation or degradation; 2) contraction scour (due to reduction in flow area caused by a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute scour depths for contraction and local scour and a summary of the results follows. Contraction scour for all modelled flows ranged from 6.3 ft to 7.8 ft and the worst-case contraction scour occurred at the 100-year discharge. Abutment scour ranged from 7.9 ft to 20.3 ft and the worst-case abutment scour occurred at the 500-year discharge. Scour depths and depths to armoring are summarized on p. 14 in the section titled “Scour Results”. Scour elevations, based on the calculated depths are presented in tables 1 and 2; a graph of the scour elevations is presented in figure 8 Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. For all scour presented in this report, “the scour depths adopted [by VTAOT] may differ from the equation values based on engineering judgement” (Richardson and others, 1993, p. 21, 27). It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results.

Vermont

Level II scour analysis for Bridge 24 (WODSTH00190024) on Town Highway 19, crossing North Bridgewater Brook, Woodstock, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WODSTH00190024 on Town Highway 19 crossing North Bridgewater Brook, Woodstock, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of east-central Vermont in the town of Woodstock. The 3.6-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left and right banks are covered by moderate tree cover along the immediate banks with some pasture/ grassland beyond. In the study area, the North Bridgewater Brook has a sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 44 ft and an average channel depth of 4 ft. The channel bed materials ranges from sand to boulders with a D 50 (median diameter)of 70.1 mm or 0.229 ft. The geomorphic assessment at the time of the Level I and Level II site visits on August 17, 1994 and December 13, 1994, indicated that the reach was stable. Localized bank cutting existed at the immediate downstream left bank. The Town Highway 19 crossing of the North Bridgewater Brook is a 26-ft-long, one-lane bridge consisting of one 23-ft steel-beam span (Vermont Agency of Transportation, written commun., August 3, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. Type-2 (less than 3 ft diameter) stone fill protects the upstream left wingwall which is impacted by flow. The channel bed under the bridge is constructed of wood. This construction is preventing channel degradation along the impacted left abutment.The channel is skewed approximately 40 degrees to the opening; the opening-skew-to-roadway is 10 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.8 ft. Abutment scour ranged from 6.6 to 14.9 ft. with the worst-case scenario occurring at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection measures, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont

Level II scour analysis for Bridge 35 (BETHTH00190035) on Town Highway 19, crossing Gilead Brook, Bethel, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BETHTH00190035 on town highway 19 crossing Gilead Brook, Bethel, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bethel. The 6.40-mi 2 drainage area is predominantly rural and forested. In the vicinity of the study site, the immediate banks have woody vegetation coverage with pasture beyond. In the study area, Gilead Brook is an incised, sinuous channel with a slope of approximately 0.015 ft/ft, an average channel top width of 31 ft and an average channel depth of 2.5 ft. The predominant channel bed material is gravel and cobble (D 50 is 62.5 mm or 0.205 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 20, 1994, indicated that the reach was stable. The town highway 19 crossing of Gilead Brook is a 30-ft-long, one-lane bridge consisting of one 24-foot steel-beam span with timber deck (Vermont Agency of Transportation, written commun., August 24, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 5 degrees to the opening while the opening-skew-to-roadway is 10 degrees. The scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) at the downstream wingwalls, left abutment, and upstream right road embankment; type-2 stone fill (less than 36 inches diameter) is at the upstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.1 to 2.1 ft. with the worst-case scenario occurring at the 500-year discharge. Abutment scour ranged from 3.9 to 9.5 ft. The worst-case abutment scour also occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection measures, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont

Level II scour analysis for Bridge 51 (RANDTH00SC0051) on School Street, crossing Thayer Brook, Randolph, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure RANDTH00SC0051 on School Street crossing Thayer Brook, Randolph, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic division of central Vermont in the town of Randolph. The 5.30-mi 2 drainage area is a predominantly rural basin. In the vicinity of the study site, the left and right banks are forested with residences on the left overbanks. In the study area, Thayer Brook has a sinuous channel with a slope of approximately 0.03 ft/ ft, an average channel top width of 36 ft and an average channel depth of 3 ft. The predominant channel bed materials are gravel and cobble (D 50 is 58.2 mm or 0.191 ft). The geomorphic assessment at the time of the Level I site visits on August 4, 1994 and December 8, 1994, indicated that the reach was stable. The School Street crossing of Thayer Brook is a 39-ft-long, two-lane bridge consisting of one 35-foot concrete span (Vermont Agency of Transportation, written commun., August 2, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. Type-2 stone fill (less than 36 inches diameter) along the downstream left bank was the only existing protection. The approach channel is skewed approximately 45 degrees to the bridge face; the opening-skew-to-roadway is also 45 degrees. Additional details describing conditions at the site are included in the Level II Summary, Appendix D, and Appendix E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.0 to 2.2 ft. with the worst-case scenario occurring at the 500-year discharge. Abutment scour ranged from 6.2 to 12.0 ft. The worst-case abutment scour also occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection measures, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont

Level II scour analysis for Bridge 51 (BRIDTH00460051) on Town Highway 46, crossing Ottauquechee River, Bridgewater, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRIDTH00460051 on town highway 46 crossing the Ottauquechee River, Bridgewater, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic division of central Vermont in the town of Bridgewater. The 103-mi 2 drainage area is a predominantly rural basin. In the vicinity of the study site, the immediate left and right banks are covered by trees and brush with residences beyond. In the study area, the Ottauquechee River has a straight channel with a slope of approximately 0.008 ft/ft, an average channel top width of 150 ft and an average channel depth of 6 ft. The predominant channel bed materials are gravel and cobble with a median grain size (D 50 ) of 81.8 mm (0.268 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 24, 1994, indicated that the reach was stable. The town highway 46 crossing of the Ottauquechee Riveris a 135-ft-long, two-lane bridge consisting of two 66-ft steel-beam spans, supported by vertical, concrete abutments with upstream wingwalls and one concrete pier (Vermont Agency of Transportation, written commun., August 24, 1994). Type-2 stone fill (less than 36 inches diameter) has been placed along the left abutment and both upstream wingwalls. The upstream side of both road embankments are also protected by type-2 stone fill. Abutments of a previous bridge still exist at the downstream side of the present structure’s abutments. The channel is skewed 10 degrees to the bridge face; the opening-skew-to-roadway is 0 degrees. There are remains of a breached dam 160 feet upstream of the bridge which deflect flow toward the left bank. Additional details describing conditions at the site are included in the Level II Summary, Appendix D, and Appendix E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 2.6 to 5.4 ft. The worst-case contraction scour occurred at the incipient overtopping discharge, which was between the 100- and 500-year discharges. Pier scour ranged from 9.9 to 10.9 ft with the worst-case scenario also occurring at the incipient roadway overtopping discharge. Abutment scour ranged from 25.3 to 33.6 ft. with the worst-case occurring at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection measures, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont

Level II scour analysis for Bridge 49 (BETHTH00790049) on Town Highway 79, crossing Locust Creek, Bethel, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BETHTH00790049 on town highway 79 crossing Locust Creek, Bethel, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bethel. The 24.4-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the banks are forested. In the study area, Locust Creek has an incised, sinuous channel with a slope of approximately 0.015 ft/ft, an average channel top width of 74 ft and an average channel depth of 6 ft. The predominant channel bed material is gravel and cobble (D 50 is 124 mm or 0.407 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 21 & 26, 1994, respectively, with a check on 12/15/94, indicated that the reach was stable. The town Highway 79 crossing of Locust Creek is a 55-ft-long, one-lane bridge consisting of one 50-foot concrete span (Vermont Agency of Transportation, written commun., August 24, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 50 degrees to the opening while the opening-skew-toroadway is 45 degrees. Scour protection measures in place at the site were type-1 stone fill (less than 12 inches diameter) at the upstream right and downstream left road embankment, type-2 stone fill (less than 36 inches diameter) at the upstream left bank, upstream wingwalls, and downstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of these computed results follow. Contraction scour for all modelled flows ranged from 0.0 ft to 1.0 ft. The worst-case contraction scour occurred at the 100-year discharge. Abutment scour ranged from 10.3 ft to 13.3 ft. with the worst-case abutment scour also occurring at the 100-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated depths, are presented in tables 1 and 2. A cross-section of the computed scour at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 22). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont