Risk management in a large-scale CO2 geosequestration pilot project, Illinois, USA

Like most large-scale infrastructure projects, carbon dioxide (CO 2) geological sequestration (GS) projects have multiple success criteria and multiple stakeholders. In this context "risk evaluation" encompasses multiple scales. Yet a risk management program aims to maximize the chance of project success by assessing, monitoring, minimizing all risks in a consistent framework. The 150,000-km2 Illinois Basin underlies much of the state of Illinois, USA, and parts of adjacent Kentucky and Indiana. Its potential for CO2 storage is first-rate among basins in North America, an impression that has been strengthened by early testing of the injection well of the Midwest Geological Sequestration Consortium's (MGSC's) Phase III large scale demonstration project, the Illinois Basin - Decatur Project (IBDP). The IBDP, funded by the U.S. Department of Energy's National Energy Technology Laboratory (NETL), represents a key trial of GS technologies and project-management techniques. Though risks are specific to each site and project, IBDP risk management methodologies provide valuable experience for future GS projects. IBDP views risk as the potential for negative impact to any of these five values: health and safety, environment, financial, advancing the viability and public acceptability of a GS industry, and research. Research goals include monitoring one million metric tonnes of injected CO2 in the subsurface. Risk management responds to the ways in which any values are at risk: for example, monitoring is designed to reduce uncertainties in parameter values that are important for research and system control, and is also designed to provide public assurance. Identified risks are the primary basis for risk-reduction measures: risks linked to uncertainty in geologic parameters guide further characterization work and guide simulations applied to performance evaluation. Formally, industry defines risk (more precisely risk criticality) as the product L*S, the Likelihood multiplied by the Severity of negative impact. L and S are each evaluated on five-point scales, yielding a theoretical spread in risk values of 1 through 25. So defined, these judgment-based values are categorical and ordinal - they do not represent physically measurable quantities, but are nonetheless useful for comparison and therefore decision support. The "risk entities" first evaluated are FEPs - conceptual Features, Events, and Processes based on the list published by Quintessa Ltd. After concrete scenarios are generated based on selected FEPs, scenarios become the critical entities whose associated risks are evaluated and tracked. In IBDP workshops, L and S values for 123 FEPs were generated through expert elicitation. About 30 experts in the project or in GS in general were assigned among six facilitated working groups, and each group was charged to envision risks within a sphere of project operations. Working groups covered FEPs with strong spatial characteristics - such as those related to the injection wellbore and simulated plume footprint - and "nonspatial" FEPs related to finance, regulations, legal, and stakeholder issues. Within these working groups, experts shared information, examined assumptions, refined and extended the FEP list, calibrated responses, and provided initial L and S values by consensus. Individual rankings were collected in a follow-up process via emailed spreadsheets. For each of L and S, three values were collected: Lower Bound, Best Guess, and Upper Bound. The Lower-Upper Bound ranges and the spreads among experts can be interpreted to yield rough confidence measures. Based on experts' responses, FEPs were ranked in terms of their L*S risk levels. FEP rankings were determined from individual (not consensus or averaged) results, thus no high-risk responses were damped out. The higher-risk FEPs were used to generate one or more concrete, well defined risk-bearing scenarios for each FEP. Any FEP scored by any expert as having associated risk of

Conference Paper↗

CO2 plume management in saline reservoir sequestration

A significant difference between injecting CO2 into saline aquifers for sequestration and injecting fluids into oil reservoirs or natural gas into aquifer storage reservoirs is the availability and use of other production and injection wells surrounding the primary injection well(s). Of major concern for CO2 sequestration using a single well is the distribution of pressure and CO2 saturation within the injection zone. Pressure is of concern with regards to caprock integrity and potential migration of brine or CO2 outside of the injection zone, while CO2 saturation is of interest for storage rights and displacement efficiency. For oil reservoirs, the presence of additional wells is intended to maximize oil recovery by injecting CO2 into the same hydraulic flow units from which the producing wells are withdrawing fluids. Completing injectors and producers in the same flow unit increases CO2 throughput, maximizes oil displacement efficiency, and controls pressure buildup. Additional injectors may surround the CO2 injection well and oil production wells in order to provide external pressure to these wells to prevent the injected CO2 from migrating from the pattern between two of the producing wells. Natural gas storage practices are similar in that to reduce the amount of "cushion" gas and increase the amount of cycled or working gas, edge wells may be used for withdrawal of gas and center wells used for gas injection. This reduces loss of gas to the formation via residual trapping far from the injection well. Moreover, this maximizes the natural gas storage efficiency between the injection and production wells and reduces the areal extent of the natural gas plume. Proposed U.S. EPA regulations include monitoring pressure and suggest the "plume" may be defined by pressure in addition to the CO2 saturated area. For pressure monitoring, it seems that this can only be accomplished by injection zone monitoring wells. For pressure, these wells would not need to be very close to the injection well, compared to monitoring wells intended to measure CO2 saturation via fluid sampling or cased-hole well logs. If pressure monitoring wells become mandated, these wells could be used for managing the CO2 saturation and aquifer pressure distribution. To understand the relevance and effectiveness of producing and injecting brine to improve storage efficiency, direct the plume to specific pore space, and redistribute the pressure, numerical models of CO2 injection into aquifers are used. Simulated cases include various aquifer properties at a single well site and varying the number and location of surrounding wells for plume management. Strategies in terms of completion intervals can be developed to effectively contact more vertical pore space in relatively thicker geologic formations. Inter-site plume management (or cooperative) wells for the purpose of pressure monitoring and plume management may become the responsibility of a consortium of operators or a government entity, not individual sequestration site operators. ?? 2011 Published by Elsevier Ltd.

Conference Paper↗

The path to a successful one-million tonne demonstration of geological sequestration: Characterization, cooperation, and collaboration

The development of the Illinois Basin-Decatur USA test site for a 1 million tonne injection of CO 2 into the Mount Simon Sandstone saline reservoir beginning in 2011 has been a multiphase process requiring a wide array of personnel and resources that began in 2003. The process of regional characterization took two years as part of a Phase I effort focused on the entire Illinois Basin, located in Illinois, Indiana, and Kentucky, USA. Seeking the cooperation of an industrial source of CO 2 and site selection within the Basin took place during Phase II while most of the concurrent research emphasis was on a set of small-scale tests of Enhanced Oil Recovery (EOR) and CO 2 injection into a coal seam. Phase III began the commitment to the 1 million-tonne test site development through the collaboration of the Archer Daniels Midland Company (ADM) who is providing a site, the CO 2 , and developing a compression facility, of Schlumberger Carbon Services who is providing expertise for operations, drilling, geophysics, risk assessment, and reservoir modelling, and of the Illinois State Geological Survey (ISGS) whose geologists and engineers lead the Midwest Geological Sequestration Consortium (MGSC). Communications and outreach has been a collaborative effort of ADM, ISGS and Schlumberger Carbon Services. The Consortium is one of the seven Regional Carbon Sequestration Partnerships, a carbon sequestration research program supported by the National Energy Technology Laboratory of the U.S. Department of Energy.

Illinois↗

Real-time monitoring of CO2 storage sites: Application to Illinois Basin-Decatur Project

Optimization of carbon dioxide (CO 2 ) storage operations for efficiency and safety requires use of monitoring techniques and implementation of control protocols. The monitoring techniques consist of permanent sensors and tools deployed for measurement campaigns. Large amounts of data are thus generated. These data must be managed and integrated for interpretation at different time scales. A fast interpretation loop involves combining continuous measurements from permanent sensors as they are collected to enable a rapid response to detected events; a slower loop requires combining large datasets gathered over longer operational periods from all techniques. The purpose of this paper is twofold. First, it presents an analysis of the monitoring objectives to be performed in the slow and fast interpretation loops. Second, it describes the implementation of the fast interpretation loop with a real-time monitoring system at the Illinois Basin–Decatur Project (IBDP) in Illinois, USA.

Energy Procedia↗

Classification of CO 2 Geologic Storage: Resource and Capacity

The use of the term capacity to describe possible geologic storage implies a realistic or likely volume of CO 2 to be sequestered. Poor data quantity and quality may lead to very high uncertainty in the storage estimate. Use of the term "storage resource" alleviates the implied certainty of the term "storage capacity". This is especially important to non- scientists (e.g. policy makers) because "capacity" is commonly used to describe the very specific and more certain quantities such as volume of a gas tank or a hotel's overnight guest limit. Resource is a term used in the classification of oil and gas accumulations to infer lesser certainty in the commercial production of oil and gas. Likewise for CO 2 sequestration, a suspected porous and permeable zone can be classified as a resource, but capacity can only be estimated after a well is drilled into the formation and a relatively higher degree of economic and regulatory certainty is established. Storage capacity estimates are lower risk or higher certainty compared to storage resource estimates. In the oil and gas industry, prospective resource and contingent resource are used for estimates with less data and certainty. Oil and gas reserves are classified as Proved and Unproved, and by analogy, capacity can be classified similarly. The highest degree of certainty for an oil or gas accumulation is Proved, Developed Producing (PDP) Reserves. For CO 2 sequestration this could be Proved Developed Injecting (PDI) Capacity. A geologic sequestration storage classification system is developed by analogy to that used by the oil and gas industry. When a CO 2 sequestration industry emerges, storage resource and capacity estimates will be considered a company asset and consequently regulated by the Securities and Exchange Commission. Additionally, storage accounting and auditing protocols will be required to confirm projected storage estimates and assignment of credits from actual injection. An example illustrates the use of these terms and how storage classification changes as new data become available. ?? 2009 Elsevier Ltd. All rights reserved.

Conference Paper↗

A Multi-Level Approach to Outreach for Geologic Sequestration Projects

Public perception of carbon capture and sequestration (CCS) projects represents a potential barrier to commercialization. Outreach to stakeholders at the local, regional, and national level is needed to create familiarity with and potential acceptance of CCS projects. This paper highlights the Midwest Geological Sequestration Consortium (MGSC) multi-level outreach approach which interacts with multiple stakeholders. The MGSC approach focuses on external and internal communication. External communication has resulted in building regional public understanding of CCS. Internal communication, through a project Risk Assessment process, has resulted in enhanced team communication and preparation of team members for outreach roles. ?? 2009 Elsevier Ltd. All rights reserved.

Conference Paper↗

Sequestering ADM ethanol plant carbon dioxide

Archer Daniels Midland Co. (ADM) and the Illinois State Geological Survey (ISGS) are collaborating on a project in confirming that a rock formation can store carbon dioxide from the plant in its pores. The project aimed to sequester the gas underground permanently to minimize release of the greenhouse gas into the atmosphere. It is also designed to store one million tons of carbon dioxide over a three-year period. The project is worth $84.3M, funded by $66.7M from the US Department Energy, supplemented by co-funding from ADM and other corporate and state resources. The project will start drilling of wells to an expected depth over 6500 feet into the Mount Simon Sandstone formation.

Industrial Bioprocessing↗

An analytical model of the mechanical properties of bulk coal under confined stress

This paper presents the development of an analytical model which can be used to relate the structural parameters of coal to its mechanical properties such as elastic modulus and Poisson's ratio under a confined stress condition. This model is developed primarily to support process modeling of coalbed methane (CBM) or CO2-enhanced CBM (ECBM) recovery from coal seam. It applied an innovative approach by which stresses acting on and strains occurring in coal are successively combined in rectangular coordinates, leading to the aggregated mechanical constants. These mechanical properties represent important information for improving CBM/ECBM simulations and incorporating within these considerations of directional permeability. The model, consisting of constitutive equations which implement a mechanically consistent stress-strains correlation, can be used as a generalized tool to study the mechanical and fluid behaviors of coal composites. An example using the model to predict the stress-strain correlation of coal under triaxial confined stress by accounting for the elastic and brittle (non-elastic) deformations is discussed. The result shows a good agreement between the prediction and the experimental measurement. ?? 2007 Elsevier Ltd. All rights reserved.

Fuel↗

CO2 sequestration: Storage capacity guideline needed

Petroleum reserves are classified for the assessment of available supplies by governmental agencies, management of business processes for achieving exploration and production efficiency, and documentation of the value of reserves and resources in financial statements. Up to the present however, the storage capacity determinations made by some organizations in the initial CO2 resource assessment are incorrect technically. New publications should thus cover differences in mineral adsorption of CO2 and dissolution of CO2 in various brine waters.

Oil & Gas Journal↗