Search USGSSearch

Geology topics

Michael Solt

Publications and source records attributed to Michael Solt.

3 recordsLinked to original sources

Land subsidence along the California Aqueduct in west-central San Joaquin Valley, California, 2003–10

Extensive groundwater withdrawal from the unconsolidated deposits in the San Joaquin Valley caused widespread aquifer-system compaction and resultant land subsidence from 1926 to 1970—locally exceeding 8.5 meters. The importation of surface water beginning in the early 1950s through the Delta-Mendota Canal and in the early 1970s through the California Aqueduct resulted in decreased groundwater pumping, recovery of water levels, and a reduced rate of compaction in some areas of the San Joaquin Valley. However, drought conditions during 1976–77, 1987–92, and drought conditions and operational reductions in surface-water deliveries during 2007–10 decreased surface-water availability, causing pumping to increase, water levels to decline, and renewed compaction. Land subsidence from this compaction has reduced freeboard and flow capacity of the California Aqueduct, Delta-Mendota Canal, and other canals that deliver irrigation water and transport floodwater. The U.S. Geological Survey, in cooperation with the California Department of Water Resources, assessed more recent land subsidence near a 145-kilometer reach of the California Aqueduct in the west-central part of the San Joaquin Valley as part of an effort to minimize future subsidence-related damages to the California Aqueduct. The location, magnitude, and stress regime of land-surface deformation during 2003–10 were determined by using data and analyses associated with extensometers, Global Positioning System surveys, Interferometric Synthetic Aperture Radar, spirit-leveling surveys, and groundwater wells. Comparison of continuous Global Positioning System, shallow-extensometer, and groundwater-level data indicated that most of the compaction in this area took place beneath the Corcoran Clay, the primary regional confining unit. The integration of measurements strengthens confidence in individual measurement methods and provides the information at spatial and temporal scales that water managers need to design and implement groundwater sustainability plans in compliance with California’s Sustainable Groundwater Management Act. Measurements of land-surface deformation during 2003–10 indicated that the parts of the California Aqueduct closest to the Coast Ranges in the west-central part of the San Joaquin Valley were fairly stable or minimally subsiding on an annual basis; some areas show seasonal periods of subsidence and uplift that resulted in little or no longer-term elevation loss. Many groundwater levels in these areas did not reach historical lows during 2003–10, indicating that deformation nearest the Coast Ranges was likely primarily elastic. Land-surface deformation measurements indicated that some parts of the California Aqueduct that traverse farther from the Coast Ranges toward the valley center subsided. Some parts of the California Aqueduct subsided locally, but generally the California Aqueduct is within part of a 12,000-square-kilometer area affected by 25 millimeters or more of subsidence during 2008–10, with maxima in Madera County, south of the town of El Nido near the San Joaquin River and the Eastside Bypass (540 millimeters), and in Tulare County, west of the town of Pixley (345 millimeters). Interferometric Synthetic Aperture Radar-derived subsidence maps for various periods during 2003–10 show that the area of maximum active subsidence (that is, the largest rates of subsidence) shifted from its historical (1926–70) location southwest of the town of Mendota to these areas nearer the valley center. Calculations indicated that the subsidence rate doubled in 2008 in parts of the study area. Water levels declined during 2007–10 in many shallow and deep wells in the most rapidly subsiding areas, where water levels in many deep wells reached their historical lows, indicating that subsidence measured during this period was largely inelastic. Continued groundwater-level and land-subsidence monitoring in the San Joaquin Valley is important because (1) operational- and drought-related reductions in surface-water deliveries since 1976 have resulted in increased groundwater pumping and associated water-level declines and land subsidence, (2) land use and associated pumping continue to change throughout the valley, and (3) subsidence management is stipulated in the Sustainable Groundwater Management Act. The availability of surface water remains uncertain; even during record-setting precipitation years, such as 2010–11, water deliveries fell short of requests and groundwater pumping was required to meet the irrigation demand. In some areas, the infrastructure is not available to supply surface water, and groundwater is the only source of water. Because of the expected continued demand for water and the limitations and uncertainty of surface-water supplies, groundwater pumping and associated land subsidence remains a concern. Spatially detailed information on land subsidence is needed to minimize future subsidence-related damages to the California Aqueduct and other infrastructure in the San Joaquin Valley, as well as alterations to natural resources such as stream gradients, water depths, and water temperatures. The integration of data on land-surface elevation, subsurface deformation, and water levels—particularly continuous measurements—enables the analysis of aquifer-system response to groundwater pumping, which in turn, enables estimation of the preconsolidation head and calculation of aquifer-system storage properties. This information can be used to improve numerical model simulations of groundwater flow and aquifer-system compaction and allow for consideration of land subsidence in the evaluation of water resource management alternatives and compliance with the Sustainable Groundwater Management Act.

California

Geohydrology, geochemistry, and numerical simulation of groundwater flow and land subsidence in the Bicycle Basin, Fort Irwin National Training Center, California

Groundwater pumping from Bicycle Groundwater Basin (referred to as Bicycle Basin) in the Fort Irwin National Training Center, California, began in 1967. From 1967 to December 2010, about 46,000 acre-feet of water had been pumped from the basin and transported to the Irwin Basin. During this time, not only did water levels in the basin decline by as much as 100 feet, the quality of the groundwater pumped from the basin also deteriorated in some wells. The U.S. Geological Survey collected geohydrologic data from existing wells, test holes, and 16 additional monitoring wells installed at 6 sites in Bicycle Basin during 1992–2011 to determine the quantity and quality of groundwater available in the basin. Geophysical surveys, including electrical, gravity, and seismic refraction surveys, were completed to help determine the geometry of the structural basin, delineate depths to the interface between Quaternary and Tertiary rocks, map the depth to the water table, and used to develop a geohydrologic framework and groundwater-flow model for Bicycle Basin. Water samples were used to determine the groundwater quality in the basin and to delineate potential sources of poor-quality groundwater. Analysis of stable isotopes of oxygen and hydrogen in groundwater indicated that presentday precipitation is not a major source of recharge to the basin. Tritium and carbon-14 data indicated that most of the groundwater in the basin was recharged prior to 1952 and had an apparent age of 15,625–39,350 years. Natural recharge to the basin was not sufficient to replenish the groundwater pumped from the basin. Interferograms from synthetic aperture radar data (InSAR), analyzed to evaluate land-surface subsidence between 1993 and 2010, showed 0.23 to 1.1 feet of subsidence during this period near one production well north of Bicycle Lake (dry) playa. A groundwater-flow model of Bicycle Basin was developed and calibrated using groundwater levels for 1964– 2010, and a subsidence model using land-surface deformation data for 1993–2010. Between January 1967 and December 2010, the simulated total recharge from precipitation runoff and underflow from adjacent basins was about 5,100 acre-feet and pumpage from the Bicycle Basin was about 47,000 acrefeet of water. Total outflows exceeded natural recharge during this period, resulting in a net loss of about 42,100 acre-feet of groundwater storage in the basin. The Fort Irwin National Training Center is considering various groundwater-management options in the Bicycle Basin. The groundwater-flow model was used to (1) evaluate changes in groundwater levels and subsidence with the addition of capture and recharge of simulated runoff in retention basins (scenario 1) for predevelopment through 2010; (2) simulate a base case (scenario 2) for reference; and (3) compare projections of alternative future pumping strategies for 2011–60 (scenarios 3–5). Model results from the runoff-capture simulation (scenario 1) indicated that total recharge, including runoff captured using retention basins, locally increased water levels, which partially offset, but did not mitigate, groundwater depletion associated with pumping. Groundwater-storage depletion in scenario 1 was about 14 percent less than without runoff capture. Simulated-drawdown results in model layer 1 in the eastern part of the basin indicated that, because of the captured runoff, simulated heads were as much as 100 feet higher in December 2010 than prior to the onset of development in 1967. In contrast, simulated drawdown for model without runoff capture indicated that, without captured runoff, simulated heads for December 2010 in this area were 80–90 feet lower than during the predevelopment period. Subsidence was mitigated slightly in scenario 1 compared to without runoff capture; the largest decrease in subsidence at observation sites was about 0.07 feet.

California

Lithostratigraphic, borehole-geophysical, hydrogeologic, and hydrochemical data from the East Bay Plain, Alameda County, California

The U.S. Geological Survey, in cooperation with the East Bay Municipal Utility District, carried out an investigation of aquifer-system deformation associated with groundwater-level changes at the Bayside Groundwater Project near the modern San Francisco Bay shore in San Lorenzo, California. As a part of the Bayside Groundwater Project, East Bay Municipal Utility District proposed an aquifer storage and recovery program for 1 million gallons of water per day. The potential for aquifer-system compaction and expansion, and related subsidence, uplift, or both, resulting from aquifer storage and recovery activities were investigated and monitored in the Bayside Groundwater Project. In addition, baseline analysis of groundwater and substrata properties were performed to assess the potential effect of such activities. Chemical and physical data, obtained from the subsurface at four sites on the east side of San Francisco Bay in the San Lorenzo and San Leandro areas of the East Bay Plain, Alameda County, California, were collected during the study. The results of the study were provided to the East Bay Municipal Utility District and other agencies to evaluate the chemical and mechanical responses of aquifers underlying the East Bay Plain to the future injection and recovery of imported water from the Sierra Nevada of California. Among 4 sites, 14 piezometers and 2 extensometers were installed in 6 boreholes, which ranged in depth from 460 to 1,040 feet. The lithology of drill cuttings, collected at 5- or 10-foot intervals, was described for grain size and any other noticeable features, such as wood or shell fragments. Borehole geophysical logging was performed at each site in the deepest borehole, immediately following drilling. Drill-core samples, totaling 284 feet, were collected at the Bayside site. The drill-core sediment was subsampled to determine pore-water chemistry, vertical hydraulic conductivity, and physical and mechanical properties at different depths. Depositional environment and age were determined by luminescence geochronology and fossil identification. The elemental composition of the drill-core sediments was determined by inductively coupled plasma mass spectroscopy and instrumental neutron activation by abbreviated count analysis. Mineral composition was determined by X-ray diffraction and scanning electron microscopy analysis. Groundwater samples were collected from all 14 piezometers as part of either the USGS Groundwater Ambient Monitoring and Assessment or the USGS National Water Quality Assessment program for water-quality analyses. Sample analytes included nutrients, major and minor ions, trace elements, isotopic ratios of hydrogen and oxygen in water, carbon-14, and tritium. Water-level and aquifer-system-compaction measurements, which indicated diurnal and seasonal fluctuations, were made at the Bayside Groundwater Project site. Slug tests were performed at the Bayside piezometers and nine pre-existing wells to estimate hydraulic conductivity.

California