Search USGSSearch

Geology topics

Matthew M. Beirne

Publications and source records attributed to Matthew M. Beirne.

8 recordsLinked to original sources

Challenges of implementing a multi-agency monitoring and adaptive management strategy for federally threatened Chinook salmon and steelhead trout during and after dam removal in the Elwha River

Adaptive management, a process of planning, implementing, and evaluating management strategies, is often recommended for monitoring ecological systems. However, few examples of successful implementation and retrospective case studies exist. We provide a case study of adaptively managing hatchery-assisted protection and recovery for Chinook salmon ( Oncorhynchus tshawytscha ) and winter steelhead trout ( O. mykiss ) during and after the removal of two large mainstem dams in the Elwha River, WA. We summarize key aspects of the monitoring and adaptive management plan over the last decade and highlight successes, challenges, and complications during the plan’s implementation. The Elwha Monitoring and Adaptive Management Guidelines included a trigger-based system for moving through four phases of recovery that included preservation, recolonization, local adaptation, and viable natural population, each with differing levels of hatchery production as the management actions. The monitoring component of the plan has been very successful, providing critical data to guide management actions that otherwise may not have occurred and, opportunistically, provided data for other native species in the Elwha River. Implementing adaptive management provided mixed results and was at times hindered by divergent management goals among project partners, the inflexibility of the Endangered Species Act regulatory requirements as implemented for this project, and conflicting information among guidance documents. We learned that some metrics and triggers in the plan were ill-defined or too difficult to measure in the field. In some cases, the performance indicators and/or triggers were successfully modified to incorporate what was learned; however, in other cases, we were unable to revise the values due to differing opinions among partners. The ability to reach consensus on revised triggers appeared to be influenced by the recovery trajectory of the species involved. The implemented adaptive management strategy resulted in substantial collaboration and learning, which resulted in revised management strategies, but was imperfect. Sufficient long-term funding is necessary to implement a well-designed monitoring program and could benefit from including a defined leadership position to shepherd and facilitate a multi-stakeholder adaptive management program. Additionally, incorporating adaptive management into legally binding conditions under the Endangered Species Act is feasible, but requires substantial pre-planning in close coordination with regulatory agencies.

Washington

Nearshore subtidal community response during and after sediment disturbance associated with dam removal

Dam removal is used increasingly to restore aquatic ecosystems and remove unnecessary or high-risk infrastructure. As the number of removals increases, there is a growing understanding about the hydrologic, geomorphic, and ecological responses to these removals. Most dam removal studies, however, focus on river and watershed responses to dam removal. The removal of two dams on the Elwha River provided a unique opportunity to characterize the response of nearshore (coastal) ecosystems. We conducted SCUBA surveys between 2011 and 2022 to quantify trajectories of change in a nearshore ecosystem during and after dam removal. We focused on the degree to which the abundances of kelp, benthic invertebrates, and fish changed in response to patterns of sediment fluxes during and after dam removal. Our findings point to two pathways of response depending on the disturbance mechanism and species type. Sites with persistent sediment deposition were characterized by wholesale community changes that did not recover to a before dam removal condition. Instead, the sites were colonized by new species that were largely absent prior to dam removal. Sites that experienced high turbidity but lacked persistent seafloor deposition were primarily characterized by a reduction in the abundance of kelp and other algae during dam removal and a rapid recovery after sediment flux to the nearshore declined. Dam removal influences on invertebrates and fish at these sites were more variable, benefiting some species and disadvantaging others. In addition to dam removal, sea star wasting syndrome and a marine heatwave exerted distinct controls on subtidal communities during the same period. The loss of the predatory sea star Pycnopodia helianthoides was associated with gains in some of its prey species, and kelp community changes reflected regional trends in ocean temperature and kelp abundance. The results presented here have important implications for understanding the response of marine ecosystems to future dam removals and similar sediment perturbation events.

Washington

Increased sediment load during a large-scale dam removal changes nearshore subtidal communities

The coastal marine ecosystem near the Elwha River was altered by a massive sediment influx—over 10 million tonnes—during the staged three-year removal of two hydropower dams. We used time series of bathymetry, substrate grain size, remotely sensed turbidity, scuba dive surveys, and towed video observations collected before and during dam removal to assess responses of the nearshore subtidal community (3 m to 17 m depth). Biological changes were primarily driven by sediment deposition and elevated suspended sediment concentrations. Macroalgae, predominantly kelp and foliose red algae, were abundant before dam removal with combined cover levels greater than 50%. Where persistent sediment deposits formed, macroalgae decreased greatly or were eliminated. In areas lacking deposition, macroalgae cover decreased inversely to suspended sediment concentration, suggesting impacts from light reduction or scour. Densities of most invertebrate and fish taxa decreased in areas with persistent sediment deposition; however, bivalve densities increased where mud deposited over sand, and flatfish and Pacific sand lance densities increased where sand deposited over gravel. In areas without sediment deposition, most invertebrate and fish taxa were unaffected by increased suspended sediment or the loss of algae cover associated with it; however, densities of tubeworms and flatfish, and primary cover of sessile invertebrates increased suggesting benefits of increased particulate matter or relaxed competition with macroalgae for space. As dam removal neared completion, we saw evidence of macroalgal recovery that likely owed to water column clearing, indicating that long-term recovery from dam removal effects may be starting. Our results are relevant to future dam removal projects in coastal areas and more generally to understanding effects of increased sedimentation on nearshore subtidal benthic communities.

Washington

Coastal habitat and biological community response to dam removal on the Elwha River

Habitat diversity and heterogeneity play a fundamental role in structuring ecological communities. Dam emplacement and removal can fundamentally alter habitat characteristics, which in turn can affect associated biological communities. Beginning in the early 1900s, the Elwha and Glines Canyon dams in Washington, USA, withheld an estimated 30 million tonnes of sediment from river, coastal, and nearshore habitats. During the staged removal of these dams—the largest dam removal project in history—over 14 million tonnes of sediment were released from the former reservoirs. Our interdisciplinary study in coastal habitats—the first of its kind—shows how the physical changes to the river delta and estuary habitats during dam removal were linked to responses in biological communities. Sediment released during dam removal resulted in over a meter of sedimentation in the estuary and over 400 m of expansion of the river mouth delta landform. These changes increased the amount of supratidal and intertidal habitat, but also reduced the influx of seawater into the pre-removal estuary complex. The effects of these geomorphic and hydrologic changes cascaded to biological systems, reducing the abundance of macroinvertebrates and fish in the estuary and shifting community composition from brackish to freshwater-dominated species. Vegetation did not significantly change on the delta, but pioneer vegetation increased during dam removal, coinciding with the addition of newly available habitat. Understanding how coastal habitats respond to large-scale human stressors—and in some cases the removal of those stressors—is increasingly important as human uses and restoration activities increase in these habitats.

Washington

Rapid water quality change in the Elwha River estuary complex during dam removal

Dam removal in the United States is increasing as a result of structural concerns, sedimentation of reservoirs, and declining riverine ecosystem conditions. The removal of the 32 m Elwha and 64 m Glines Canyon dams from the Elwha River in Washington, U.S.A., was the largest dam removal project in North American history. During the 3 yr of dam removal—from September 2011 to August 2014—more than ten million cubic meters of sediment was eroded from the former reservoirs, transported downstream, and deposited throughout the lower river, river delta, and nearshore waters of the Strait of Juan de Fuca. Water quality data collected in the estuary complex at the mouth of the Elwha River document how conditions in the estuary changed as a result of sediment deposition over the 3 yr the dams were removed. Rapid and large-scale changes in estuary conditions—including salinity, depth, and turbidity—occurred 1 yr into the dam removal process. Tidal propagation into the estuary ceased following a large sediment deposition event that began in October 2013, resulting in decreased salinity, and increased depth and turbidity in the estuary complex. These changes have persisted in the system through dam removal, significantly altering the structure and functioning of the Elwha River estuary ecosystem.

Washington

Geomorphology of the Elwha River and its Delta: Chapter 3 in Coastal habitats of the Elwha River, Washington--biological and physical patterns and processes prior to dam removal

The removal of two dams on the Elwha River will introduce massive volumes of sediment to the river, and this increase in sediment supply in the river will likely modify the shapes and forms of the river and coastal landscape downstream of the dams. This chapter provides the geologic and geomorphologic background of the Olympic Peninsula and the Elwha River with emphasis on the present river and shoreline. The Elwha River watershed was formed through the uplift of the Olympic Mountains, erosion and movement of sediment throughout the watershed from glaciers, and downslope movement of sediment from gravitational and hydrologic forces. Recent alterations to the river morphology and sediment movement through the river include the two large dams slated to be removed in 2011, but also include repeated bulldozing of channel boundaries, construction and maintenance of flood plain levees, a weir and diversion channel for water supply purposes, and engineered log jams to help enhance river habitat for salmon. The shoreline of the Elwha River delta has changed in location by several kilometers during the past 14,000 years, in response to variations in the local sea-level of approximately 150 meters. Erosion of the shoreline has accelerated during the past 80 years, resulting in landward movement of the beach by more than 200 meters near the river mouth, net reduction in the area of coastal wetlands, and the development of an armored low-tide terrace of the beach consisting primarily of cobble. Changes to the river and coastal morphology during and following dam removal may be substantial, and consistent, long-term monitoring of these systems will be needed to characterize the effects of the dam removal project.

Washington

Aquatic ecology of the Elwha River estuary prior to dam removal: Chapter 7 in Coastal habitats of the Elwha River, Washington--biological and physical patterns and processes prior to dam removal

The removal of two long-standing dams on the Elwha River in Washington State will initiate a suite of biological and physical changes to the estuary at the river mouth. Estuaries represent a transition between freshwater and saltwater, have unique assemblages of plants and animals, and are a critical habitat for some salmon species as they migrate to the ocean. This chapter summarizes a number of studies in the Elwha River estuary, and focuses on physical and biological aspects of the ecosystem that are expected to change following dam removal. Included are data sets that summarize (1) water chemistry samples collected over a 16 month period; (2) beach seining activities targeted toward describing the fish assemblage of the estuary and migratory patterns of juvenile salmon; (3) descriptions of the aquatic and terrestrial invertebrate communities in the estuary, which represent an important food source for juvenile fish and are important water quality indicators; and (4) the diet and growth patterns of juvenile Chinook salmon in the lower Elwha River and estuary. These data represent baseline conditions of the ecosystem after nearly a century of changes due to the dams and will be useful in monitoring the changes to the river and estuary following dam removal.

Washington

Vegetation of the Elwha River estuary: Chapter 8 in Coastal habitats of the Elwha River, Washington--biological and physical patterns and processes prior to dam removal

The Elwha River estuary supports one of the most diverse coastal wetland complexes yet described in the Salish Sea region, in terms of vegetation types and plant species richness. Using a combination of aerial imagery and vegetation plot sampling, we identified 6 primary vegetation types and 121 plant species in a 39.7 ha area. Most of the estuary is dominated by woody vegetation types, with mixed riparian forest being the most abundant (20 ha), followed by riparian shrub (6.3 ha) and willow-alder forest (3.9 ha). The shrub-emergent marsh transition vegetation type was fourth most abundant (2.2 ha), followed by minor amounts of dunegrass (1.75 ha) and emergent marsh (0.2 ha). This chapter documents the abundance, distribution, and floristics of these six vegetation types, including plant species richness, life form, species origin (native or introduced), and species wetland indicator status. These data will serve as a baseline to which future changes can be compared, following the impending removal of Glines Canyon and Elwha Dams upstream on the Elwha River. Dam removals may alter many of the processes, materials, and biotic interactions that influence the estuary plant communities, including hydrology, salinity, sediment and wood transport, nutrients, and plant-microbe interactions.

Washington