Search USGSSearch

Geology topics

Kurtis Thome

Publications and source records attributed to Kurtis Thome.

3 recordsLinked to original sources

ECCOE Landsat quarterly Calibration and Validation report — Quarter 2, 2021

Executive Summary The U.S. Geological Survey (USGS) Earth Resources Observation and Science (EROS) Calibration and Validation (Cal/Val) Center of Excellence (ECCOE) focuses on improving the accuracy, precision, calibration, and product quality of remote-sensing data, leveraging years of multiscale optical system geometric and radiometric calibration and characterization experience. The ECCOE Landsat Cal/Val Team continually monitors the geometric and radiometric performance of active Landsat missions and makes calibration adjustments, as needed, to maintain data quality at the highest level. This report provides observed geometric and radiometric analysis results for Landsats 7–8 for quarter 2 (April–June), 2021. All data used to compile the Cal/Val analysis results presented in this report are freely available from the USGS EarthExplorer website: https://earthexplorer.usgs.gov . One specific activity that the Cal/Val Team continued to closely monitor this quarter was the Landsat 8 Thermal Infrared Sensor (TIRS) response degradation, which has been observed since the two November 2020 safehold events. Detailed analysis results characterizing this degradation have been included in this report. Additional information about the safehold events is here: https://www.usgs.gov/core-science-systems/nli/landsat/november-19-2020-landsat-8-data-availability-update-recent-safehold .

Open-File Report

Landsat 9 mission update and status

Landsat 9 is currently undergoing testing at the integrated observatory level in preparation for launch from Vandenberg Air Force Base in 2021. Landsat 9 will replace Landsat 7 in orbit, 8 days out of phase with Landsat 8. Landsat 9 is largely a copy of Landsat 8 in terms of instrumentation, with an Operational Land Imager (OLI), model #2 and a Thermal Infrared Sensor (TIRS), model #2. The TIRS-2 is more significantly changed from TIRS with increased redundancy, as well as changes to the telescope baffling to improve stray light control and a revised scene select mirror encoder mechanism. Data quality of the Landsat 9 instruments is comparable to, or better than the Landsat 8 ones, with an increase to 14 bits of data transmitted and more detailed pre-launch characterization for OLI-2, and with more detailed characterization of the TIRS-2 pre-launch, in addition to the improved stray light control. The performance of the two instruments is summarized and compared to that of the Landsat 8 instruments.

Conference Paper

Landsat 9: Ready for Launch

Landsat 9 is in its final preparations for launch from Vandenberg Space Force Base on 16 September 2021. It has completed its environmental testing at Northrop Grumman Space (NGSP) in Gilbert, Arizona and has been transported to its California launch site. It will be launched into a 705 km orbit replacing Landsat 7 to provide 8-day Earth land mass coverage in concert with Landsat 8. Landsat 8 carries the first Operational Land Imager (OLI) and the Thermal Infrared Sensor (TIRS); Landsat 9 carries the second of each: OLI-2 and TIRS-2. Once launched it will undergo a 90-day activation, checkout, characterization and calibration, a.k.a. commissioning phase before transitioning to operations. For a several-day period during this commissioning phase, Landsat 9 will under-fly Landsat 8, allowing near simultaneous data collection by both sensors of common Earth targets. These data will be used to compare the radiometric calibrations of the instruments and allow for adjustments of processing parameters to provide more consistent data products.

Conference Paper