Search USGSSearch

Geology topics

John Hamill

Publications and source records attributed to John Hamill.

2 recordsLinked to original sources

Science Activities Associated with Proposed 2008 High-Flow Experiment at Glen Canyon Dam

Grand Canyon National Park lies approximately 15 miles downriver from Glen Canyon Dam, which was built on the Colorado River just south of the Arizona-Utah border. Because the dam stops most sediment moving downstream, its presence has resulted in erosion and shrinkage of river sandbars in Grand Canyon. Fewer and smaller sandbars mean smaller camping beaches for visitors to use, continued erosion of cultural sites, and possibly less habitat for native fish, including the endangered humpback chub. In an effort to restore sandbars and related habitat and to comply with its responsibilities under the Grand Canyon Protection Act, the Department of the Interior has proposed a high-flow release of water from Glen Canyon Dam in March 2008. The U.S. Geological Survey?s (USGS) Grand Canyon Monitoring and Research Center is responsible for coordinating research associated with the proposed experiment. The proposed studies are designed to evaluate the feasibility of using such high flows to improve a range of Grand Canyon resources.

Fact Sheet

MOSS user's manual

The Map Overlay and Statistical System (MOSS) Users' Manual is specialized document has been designed for trained users of the MOSS interactive graphics software. Those totally unfamiliar with MOSS or Geographic Information Systems are referred elsewhere as described below: -- If you know nothing about MOSS or what it can do for you, and you wish introductory information on MOSS, or you want to deign an application and data entry process compatible with MOSS, or you want "hands-on" training, contact the WELUT Team Leader at the address below for a "hands-on" GIS training session. -- If you have been introduced to MOSS, have your application defined, data entered, and want to know how to use MOSS, start reading at Section 1 of this Manual. --If you are interested in the MOSS data structure, refer to Section 2 of this Manual. --If you have some experience in using MOSS and want to refer to the general types of MOSS commands, read Section 3 of this Manual. --If you are an experience MOSS user and want details on individual MOSS commands, refer to Section 4.3 of this Manual. --If you are interested in the Federation of Rocky Mountain States -- WELUT 02 Project contractual background results, turn to Appendices D and E of this Manual. MOSS has been operation for less than 3 months, and has received limited operational testing at the date of this printing (October 1978). Undiscovered software limitations and bugs may yet appear. All such bugs as well as documentation errors, obscurities, and inadequacies should be reported to: Team Leader Western Energy and Land Use Team (WELUT) U.S. Fish and Wildlife Service Drake Creekside Building 2625 Redwing Road Fort Collins, Colorado 80526

FWS/OBS