Morphological Analyses and Simulated Flood Elevations in a Watershed with Dredged and Leveed Stream Channels, Wheeling Creek, Eastern Ohio

The USGS, in cooperation with the Ohio Emergency Management Agency, conducted a study in the Wheeling Creek Basin to (1) evaluate and contrast land-cover characteristics from 2001 with characteristics from 1979 and 1992; (2) compare current streambed elevation, slope, and geometry with conditions present in the late 1980s; (3) look for evidence of channel filling and over widening in selected undredged reaches; (4) estimate flood elevations for existing conditions in both undredged and previously dredged reaches; (5) evaluate the height of the levees required to contain floods with selected recurrence intervals in previously dredged reaches; and (6) estimate flood elevations for several hypothetical dredging and streambed aggradation scenarios in undredged reaches. The amount of barren land in the Wheeling Creek watershed has decreased from 20 to 1 percent of the basin area based on land-cover characteristics from 1979 and 2001. Barren lands appear to have been converted primarily to pasture, presumably as a result of surface-mine reclamation. Croplands also decreased from 13 to 8 percent of the basin area. The combined decrease in barren lands and croplands is approximately offset by the increase in pasture. Stream-channel surveys conducted in 1987 and again in 2006 at 21 sites in four previously dredged reaches of Wheeling Creek indicate little change in the elevation, slope, and geometry of the channel at most sites. The mean change in width-averaged bed and thalweg elevations for the 21 cross sections was 0.1 feet. Bankfull widths, mean depths, and cross-sectional areas measured at 12 sites in undredged reaches were compared to estimates determined from regional equations. The mean percentage difference between measured and estimated bankfull widths was -0.2 percent, suggesting that bankfull widths in the Wheeling Creek Basin are generally about the same as regional averages for undisturbed basins of identical drainage area. For bankfull mean depth and cross-sectional area, the mean percentage differences between the measured and estimated values were -16.0 and -11.2, respectively. The predominantly negative bias in differences between the measured and estimated values indicates that bankfull mean depths and cross-sectional areas in studied reaches generally are smaller than the regional trend. This may be an indication of channel filling and over widening or it may reflect insufficient representation in the regional dataset of basins with characteristics like that of Wheeling Creek. Step-backwater models were constructed for four previously dredged reaches to determine the height of levees required to contain floods with recurrence intervals of 2, 10, 50, and 100 years. Existing levees (all of which are uncertified) were found to contain the 100-year flood at only 20 percent of the surveyed cross sections. At the other 80 percent of the surveyed cross sections, levee heights would have to be raised an average of 2.5 feet and as much as 6.3 feet to contain the 100-year flood. Step-backwater models also were constructed for three undredged reaches to assess the impacts of selected dredging and streambed aggradation scenarios on water-surface elevations corresponding to the 2-, 10-, 50-, and 100-year floods. Those models demonstrated that changes in water-surface elevations associated with a given depth of dredging were proportionately smaller for larger floods due to the fact that more of the flood waters are outside of the main channel. For example, 2.0 feet of dredging in the three study reaches would lower the water-surface elevation an average of 1.30 feet for the 2-year flood and 0.64 feet for the 100-year flood.

Scientific Investigations Report

Flood of July 27-31, 2006, on the Grand River near Painesville, Ohio

Two separate weather systems produced storms resulting in more than 11 inches of rain in parts of Lake County, Ohio, on July 27-28, 2006. As a result of the storms and ensuing flooding caused by the weather systems, the counties of Lake, Geauga, and Ashtabula were declared Federal and State disaster areas, with damages estimated at $30 million and one fatality in Lake County. About 600 people were evacuated in Lake County. The U.S. Geological Survey streamflow-gaging station at Grand River near Painesville, Ohio (station 04212100), had a record peak stage of 19.35 feet (elevation, 614.94 feet), with a record peak streamflow of 35,000 cubic feet per second, and an estimated recurrence interval of approximately 500 years. This report describes the meteorological factors that resulted in severe flooding on the Grand River near Painesville from July 27 to July 31, 2006, and addresses the damages caused by the storms and flooding. Peak-stage, peak-streamflow, and recurrence-interval data are reported for the Grand River near Painesville. A plot of high-water marks is also presented for the Grand River in a reach that includes the City of Painesville, Painesville Township, the Village of Fairport Harbor, and the Village of Grand River.

Open-File Report

Flood of June 22-24, 2006, in North-Central Ohio, With Emphasis on the Cuyahoga River Near Independence

Heavy rains caused severe flooding on June 22-24, 2006, and damaged approximately 4,580 homes and 48 businesses in Cuyahoga County. Damage estimates in Cuyahoga County for the two days of flooding exceed $47 million; statewide damage estimates exceed $150 million. Six counties (Cuyahoga, Erie, Huron, Lucas, Sandusky, and Stark) in northeast Ohio were declared Federal disaster areas. One death, in Lorain County, was attributed to the flooding. The peak streamflow of 25,400 cubic feet per second and corresponding peak gage height of 23.29 feet were the highest recorded at the U.S. Geological Survey (USGS) streamflow-gaging station Cuyahoga River at Independence (04208000) since the gaging station began operation in 1922, exceeding the previous peak streamflow of 24,800 cubic feet per second that occurred on January 22, 1959. An indirect calculation of the peak streamflow was made by use of a step-backwater model because all roads leading to the gaging station were inundated during the flood and field crews could not reach the station to make a direct measurement. Because of a statistically significant and persistent positive trend in the annual-peak-streamflow time series for the Cuyahoga River at Independence, a method was developed and applied to detrend the annual-peak-streamflow time series prior to the traditional log-Pearson Type III flood-frequency analysis. Based on this analysis, the recurrence interval of the computed peak streamflow was estimated to be slightly less than 100 years. Peak-gage-height data, peak-streamflow data, and recurrence-interval estimates for the June 22-24, 2006, flood are tabulated for the Cuyahoga River at Independence and 10 other USGS gaging stations in north-central Ohio. Because flooding along the Cuyahoga River near Independence and Valley View was particularly severe, a study was done to document the peak water-surface profile during the flood from approximately 2 miles downstream from the USGS streamflow-gaging station at Independence to approximately 2 miles upstream from the gaging station. High-water marks were identified and flagged in the field. Third-order-accuracy surveys were used to determine elevations of the high-water marks, and the data were tabulated and plotted.

Scientific Investigations Report

Bankfull characteristics of Ohio streams and their relation to peak streamflows

Regional curves, simple-regression equations, and multiple-regression equations were developed to estimate bankfull width, bankfull mean depth, bankfull cross-sectional area, and bankfull discharge of rural, unregulated streams in Ohio. The methods are based on geomorphic, basin, and flood-frequency data collected at 50 study sites on unregulated natural alluvial streams in Ohio, of which 40 sites are near streamflow-gaging stations. The regional curves and simple-regression equations relate the bankfull characteristics to drainage area. The multiple-regression equations relate the bankfull characteristics to drainage area, main-channel slope, main-channel elevation index, median bed-material particle size, bankfull cross-sectional area, and local-channel slope. Average standard errors of prediction for bankfull width equations range from 20.6 to 24.8 percent; for bankfull mean depth, 18.8 to 20.6 percent; for bankfull cross-sectional area, 25.4 to 30.6 percent; and for bankfull discharge, 27.0 to 78.7 percent. The simple-regression (drainage-area only) equations have the highest average standard errors of prediction. The multiple-regression equations in which the explanatory variables included drainage area, main-channel slope, main-channel elevation index, median bed-material particle size, bankfull cross-sectional area, and local-channel slope have the lowest average standard errors of prediction. Field surveys were done at each of the 50 study sites to collect the geomorphic data. Bankfull indicators were identified and evaluated, cross-section and longitudinal profiles were surveyed, and bed- and bank-material were sampled. Field data were analyzed to determine various geomorphic characteristics such as bankfull width, bankfull mean depth, bankfull cross-sectional area, bankfull discharge, streambed slope, and bed- and bank-material particle-size distribution. The various geomorphic characteristics were analyzed by means of a combination of graphical and statistical techniques. The logarithms of the annual peak discharges for the 40 gaged study sites were fit by a Pearson Type III frequency distribution to develop flood-peak discharges associated with recurrence intervals of 2, 5, 10, 25, 50, and 100 years. The peak-frequency data were related to geomorphic, basin, and climatic variables by multiple-regression analysis. Simple-regression equations were developed to estimate 2-, 5-, 10-, 25-, 50-, and 100-year flood-peak discharges of rural, unregulated streams in Ohio from bankfull channel cross-sectional area. The average standard errors of prediction are 31.6, 32.6, 35.9, 41.5, 46.2, and 51.2 percent, respectively. The study and methods developed are intended to improve understanding of the relations between geomorphic, basin, and flood characteristics of streams in Ohio and to aid in the design of hydraulic structures, such as culverts and bridges, where stability of the stream and structure is an important element of the design criteria. The study was done in cooperation with the Ohio Department of Transportation and the U.S. Department of Transportation, Federal Highway Administration.

Scientific Investigations Report

Estimation of peak-frequency relations, flood hydrographs, and volume-duration-frequency relations of ungaged small urban streams in Ohio

Methods and step-by-step examples are presented to estimate (1) peak-frequency relations, (2) flood hydrographs and volumes, and (3) volume-duration frequency relations of small urban streams in Ohio. The methods were developed to assist planners in the design of hydraulic structures for which hydrograph routing is required or where the temporary storage of water is an important element of the design criteria. The data base for the analyses consisted of rainfall-runoff data collected at 62 small drainage basins distributed throughout Ohio.