Search USGSSearch

Geology topics

Heidi A. Connor

Publications and source records attributed to Heidi A. Connor.

2 recordsLinked to original sources

Challenges of implementing a multi-agency monitoring and adaptive management strategy for federally threatened Chinook salmon and steelhead trout during and after dam removal in the Elwha River

Adaptive management, a process of planning, implementing, and evaluating management strategies, is often recommended for monitoring ecological systems. However, few examples of successful implementation and retrospective case studies exist. We provide a case study of adaptively managing hatchery-assisted protection and recovery for Chinook salmon ( Oncorhynchus tshawytscha ) and winter steelhead trout ( O. mykiss ) during and after the removal of two large mainstem dams in the Elwha River, WA. We summarize key aspects of the monitoring and adaptive management plan over the last decade and highlight successes, challenges, and complications during the plan’s implementation. The Elwha Monitoring and Adaptive Management Guidelines included a trigger-based system for moving through four phases of recovery that included preservation, recolonization, local adaptation, and viable natural population, each with differing levels of hatchery production as the management actions. The monitoring component of the plan has been very successful, providing critical data to guide management actions that otherwise may not have occurred and, opportunistically, provided data for other native species in the Elwha River. Implementing adaptive management provided mixed results and was at times hindered by divergent management goals among project partners, the inflexibility of the Endangered Species Act regulatory requirements as implemented for this project, and conflicting information among guidance documents. We learned that some metrics and triggers in the plan were ill-defined or too difficult to measure in the field. In some cases, the performance indicators and/or triggers were successfully modified to incorporate what was learned; however, in other cases, we were unable to revise the values due to differing opinions among partners. The ability to reach consensus on revised triggers appeared to be influenced by the recovery trajectory of the species involved. The implemented adaptive management strategy resulted in substantial collaboration and learning, which resulted in revised management strategies, but was imperfect. Sufficient long-term funding is necessary to implement a well-designed monitoring program and could benefit from including a defined leadership position to shepherd and facilitate a multi-stakeholder adaptive management program. Additionally, incorporating adaptive management into legally binding conditions under the Endangered Species Act is feasible, but requires substantial pre-planning in close coordination with regulatory agencies.

Washington

Reconnecting the Elwha River: Spatial patterns of fish response to dam removal

The removal of two large dams on the Elwha River was completed in 2014 with a goal of restoring anadromous salmonid populations. Using observations from ongoing field studies, we compiled a timeline of migratory fish passage upstream of each dam. We also used spatially continuous snorkeling surveys in consecutive years before (2007, 2008) and after (2018, 2019) dam removal during summer baseflow to assess changes in fish distribution and density over 65 km of the mainstem Elwha River. Before dam removal, anadromous fishes were limited to the 7.9 km section of river downstream of Elwha Dam, potamodromous species could not migrate throughout the river system, and resident trout were the most abundant species. After dam removal, there was rapid passage into areas upstream of Elwha Dam, with 8 anadromous species (Chinook, Coho, Sockeye, Pink, Chum, Winter Steelhead, Summer Steelhead, Pacific Lamprey, and Bull Trout) observed within 2.5 years. All of these runs except Chum Salmon were also observed in upper Elwha upstream of Glines Canyon Dam within 5 years. The spatial extent of fish passage by adult Chinook Salmon and Summer Steelhead increased by 50 km and 60 km, respectively, after dam removal. Adult Chinook Salmon densities in some previously inaccessible reaches in the middle section of the river exceeded the highest densities observed in the lower section of the river prior to dam removal. The large number (>100) of adult Summer Steelhead in the upper river after dam removal was notable because it was among the rarest anadromous species in the Elwha River prior to dam removal. The spatial extent of trout and Bull Trout remained unchanged after dam removal, but their total abundance increased and their highest densities shifted from the lower 25 km of the river to the upper 40 km. Our results show that reconnecting the Elwha River through dam removal provided fish access to portions of the watershed that had been blocked for nearly a century.

Washington