Search USGSSearch

Geology topics

George A. Maynard

Publications and source records attributed to George A. Maynard.

4 recordsLinked to original sources

Land-use change and the ecological consequences of personality in small mammals

Many plants rely on animals for seed dispersal, but are all individuals equally effective at dispersing seeds? If not, then the loss of certain individual dispersers from populations could have cascade effects on ecosystems. Despite the importance of seed dispersal for forest ecosystems, variation among individual dispersers and whether land‐use change interferes with this process remains untested. Through a large‐scale field experiment conducted on small mammal seed dispersers, we show that an individual's personality affects its choice of seeds, as well as how distant and where seeds are cached. We also show that anthropogenic habitat modifications shift the distribution of personalities within a population, by increasing the proportion of bold, active, and anxious individuals and in‐turn affecting the potential survival and dispersal of seeds. We demonstrate that preserving diverse personality types within a population is critical for maintaining the key ecosystem function of seed dispersal.

Ecology Letters

Movement and mortality of Atlantic salmonkelts (Salmo salar) released into thePenobscot River, Maine

The Penobscot River is home to the last major run of Atlantic salmon (Salmo salar) in the United States. For over one century, the river has been stocked intensively. Since the late 1970s, most kelts are released to the Penobscot River estuary following spawning in a hatchery. Over that time, the proportion of the run made up of iteroparous individuals has declined to < 1%. These fish may make a disproportionate contribution to the spawning population because they are typically large and produce more eggs than virgin spawners. We radio-tagged 55 kelts that were artificially spawned at the Craig Brook National Fish Hatchery in 2015 and released them in two different locations in the river (head of tide and ~50 km upstream) to assess 1) when hatchery-spawned kelts leave the river, 2) whether release location influences river exit timing, and 3) if kelts from the upper river could successfully outmigrate through the lower Penobscot River’s hydroelectric complex. The kelts were tracked from November 2015 to July 2016. Although some fish from both release groups were documented leaving the system within one month, the majority of fish (84%) overwintered in freshwater habitat. Many (71%) of those kelts that overwintered in the Penobscot River made directed, upstream movements in November and December. However, there was no difference in upstream movement rates, timing of outmigration, or survival between the release groups. Survival to outmigration was 23.6%, which is considerably lower than kelt survival documented in Canadian and European rivers. Low survival to outmigration may have contributed to the disappearance of iteroparous individuals from the Penobscot River run of Atlantic salmon over the last four decades.

Maine

Size selection from fishways and potential evolutionary responses in a threatened Atlantic salmon population

The evolutionary effects of harvest on wild fish populations have been documented around the world; however, sublethal selective pressures can also cause evolutionary changes in phenotypes. For migratory fishes, passage facilities may represent instances of nonlethal selective pressure. Our analysis of 6 years of passage data suggests that certain fish passage facilities on the Penobscot River have been exerting selective pressure against large-bodied, anadromous Atlantic salmon ( Salmo salar ). At the second and third dams in the river, a 91-cm salmon was 21%–27% and 12%–16% less likely to pass than a 45-cm salmon, respectively. Fish size positively influences egg survival and number and is a heritable trait. Therefore, in a wild-reproducing population, exclusion of large fish from spawning areas may have population-level impacts. In the Penobscot River, most returning adults derive from a hatchery program that collects its broodstock after passing the first dam in the river. Analysis of fork lengths of salmon returning to the Penobscot River from 1978 to 2012 provided mixed support for evolution of size at maturity in different age classes in a pattern that may be expected from interactions with conservation hatchery operations. Additionally, slow-maturing and iteroparous individuals that represent the largest salmon size classes were essentially lost from the population during that time, and Penobscot River fish have shorter fork lengths at maturity than Atlantic salmon in undammed systems.

Maine

Upstream movements of Atlantic Salmon in the Lower Penobscot River, Maine following two dam removals and fish passage modifications

The Penobscot River Restoration Project (PRRP), to be completed in 2016, involved an extensive plan of dam removal, increases in hydroelectric capacity, and fish passage modifications to increase habitat access for diadromous species. As part of the PRRP, Great Works and Veazie dams were removed, making Milford Dam the first impediment to federally endangered Atlantic Salmon Salmo salar . Upstream habitat access for Atlantic Salmon is dependent upon successful and timely passage at Milford Dam because nearly all suitable spawning habitat is located upstream. In 2014 and 2015, a total of 73 adult salmon were radio-tagged to track their upstream movements through the Penobscot River to assess potential delays at (1) the dam remnants, (2) the confluence of the Stillwater Branch and the main stem of the Penobscot River below the impassable Orono Dam, and (3) the Milford Dam fish lift (installed in 2014). Movement rates through the dam remnants and the Stillwater confluence were comparable to open river reaches. Passage efficiency of the fish lift was high in both years (95% and 100%). However, fish experienced long delays at Milford Dam, with approximately one-third of fish taking more than a week to pass in each year, well below the Federal Energy Regulatory Commission passage standard of 95% within 48 h. Telemetry indicates most fish locate the fishway entrance within 5 h of arrival and were observed at the entrance at all hours of the day. These data indicate that overall transit times through the lower river were comparable to reported movement rates prior to changes to the Penobscot River due to the substantial delays seen at Milford Dam. The results of this study show that while adult Atlantic Salmon locate the new fish lift entrance quickly, passage of these fish was significantly delayed under 2014–2015 operations.

Maine