Search USGSSearch

Geology topics

Christopher S. Magirl

Publications and source records attributed to Christopher S. Magirl.

At least 19 recordsLinked to original sources

Conceptualizing ecological responses to dam removal: If you remove it, what's to come?

One of the desired outcomes of dam decommissioning and removal is the recovery of aquatic and riparian ecosystems. To investigate this common objective, we synthesized information from empirical studies and ecological theory into conceptual models that depict key physical and biological links driving ecological responses to removing dams. We define models for three distinct spatial domains: upstream of the former reservoir, within the reservoir, and downstream of the removed dam. Emerging from these models are response trajectories that clarify potential pathways of ecological transitions in each domain. We illustrate that the responses are controlled by multiple causal pathways and feedback loops among physical and biological components of the ecosystem, creating recovery trajectories that are dynamic and nonlinear. In most cases, short-term effects are typically followed by longer-term responses that bring ecosystems to new and frequently predictable ecological condition, which may or may not be similar to what existed prior to impoundment.

BioScience

Geomorphic evolution of a gravel‐bed river under sediment‐starved vs. sediment‐rich conditions: River response to the world's largest dam removal

Understanding river response to sediment pulses is a fundamental problem in geomorphic process studies, with myriad implications for river management. However, because large sediment pulses are rare and usually unanticipated, they are seldom studied at field scale. We examine fluvial response to a massive (~20 Mt) sediment pulse released by the largest dam removal globally, on the Elwha River, Washington, United States, in an 11‐year before‐after/control‐impact study of channel morphology and grain size. We test the hypothesis that for a given flow magnitude, greater geomorphic change occurs under sediment‐rich conditions than under sediment‐starved conditions. Channel response to flow forcing was significantly different during the sediment‐pulse peak, 1–2 years after dam removal began, than earlier or later. During peak sediment supply our hypothesis was supported; major geomorphic change occurred under low flows and unit stream power ≤60 W/m 2 . However, by 4–6 years after dam removal began, rates of geomorphic change and sensitivity to stream power had decreased substantially such that our hypothesis was no longer unequivocally supported. These findings are consistent with a two‐phase conceptual model of dam‐removal response, involving a transport‐limited state followed by a more supply‐limited state. From comparisons with other dam removals and natural sediment pulses, we infer that the longevity of sediment‐pulse signals in gravel‐bed rivers depends upon gradient, river discharge, valley morphology, and sediment grain size. Stream power associated with substantial geomorphic change varies with sediment supply, such that assigning a general threshold stream power to gravel‐bed rivers may be untenable.

Washington

Morphodynamic evolution following sediment release from the world’s largest dam removal

Sediment pulses can cause widespread, complex changes to rivers and coastal regions. Quantifying landscape response to sediment-supply changes is a long-standing problem in geomorphology, but the unanticipated nature of most sediment pulses rarely allows for detailed measurement of associated landscape processes and evolution. The intentional removal of two large dams on the Elwha River (Washington, USA) exposed ~30 Mt of impounded sediment to fluvial erosion, presenting a unique opportunity to quantify source-to-sink river and coastal responses to a massive sediment-source perturbation. Here we evaluate geomorphic evolution during and after the sediment pulse, presenting a 5-year sediment budget and morphodynamic analysis of the Elwha River and its delta. Approximately 65% of the sediment was eroded, of which only ~10% was deposited in the fluvial system. This restored fluvial supply of sand, gravel, and wood substantially changed the channel morphology. The remaining ~90% of the released sediment was transported to the coast, causing ~60 ha of delta growth. Although metrics of geomorphic change did not follow simple time-coherent paths, many signals peaked 1–2 years after the start of dam removal, indicating combined impulse and step-change disturbance responses.

Washington

Effect of river confinement on depth and spatial extent of bed disturbance affecting salmon redds

Human impacts on rivers threaten the natural function of riverine ecosystems. This paper assesses how channel confinement affects the scour depth and spatial extent of bed disturbance and discusses the implications of these results for salmon-redd disturbance in gravel-bedded rivers. Two-dimensional hydrodynamic models of relatively confined and unconfined reaches of the Cedar River in Washington State, USA, were constructed with surveyed bathymetry and available airborne lidar data then calibrated and verified with field observations of water-surface elevation and streamflow velocity. Simulations showed greater water depths and velocities in the confined reach and greater areas of low-velocity inundation in the unconfined reach at high flows. Data on previously published scour depth of bed disturbance during high flows were compared to simulated bed shear stress to construct a probabilistic logistic-regression model of bed disturbance, which was applied to spatial patterns of simulated bed shear stress to quantify the extent of likely bed disturbance to the burial depth of sockeye and Chinook salmon redds. The disturbance depth was not observed to differ between confined and unconfined reaches; however, results indicated the spatial extent of disturbance to a given depth in the confined reach was roughly twice as large as in the unconfined reach.

Washington

Science partnership between U.S. Geological Survey and the Lower Elwha Klallam Tribe—Understanding the Elwha River Dam Removal Project

After nearly a century of producing power, two large hydroelectric dams on the Elwha River in Washington State were removed during 2011 to 2014 to restore the river ecosystem and recover imperiled salmon populations. Roughly two-thirds of the 21 million cubic meters of sediment—enough to fill nearly 2 million dump trucks—contained behind the dams was released downstream, which restored natural processes and initiated important changes to the river, estuarine, and marine ecosystems. A multidisciplinary team of scientists from the Lower Elwha Klallam Tribe, academia, non-governmental organizations, Federal and state agencies, and the U.S. Geological Survey collected key data before, during, and after dam removal to understand the outcomes of this historic project on the Elwha River ecosystem.

Washington

The geomorphic legacy of water and erosion control structures in a semiarid rangeland watershed

Control over water supply and distribution is critical for agriculture in drylands where manipulating surface runoff often serves the dual purpose of erosion control. However, little is known of the geomorphic impacts and legacy effects of rangeland water manipulation infrastructure, especially if not maintained. This study investigated the geomorphic impacts of structures such as earthen berms, water control gates, and stock tanks, in a semiarid rangeland in the southwestern USA that is responding to both regional channel incision that was initiated over a century ago, and a more recent land use change that involved cattle removal and abandonment of structures. The functional condition of remnant structures was inventoried, mapped, and assessed using aerial imagery and lidar data. Headcut initiation, scour, and channel incision associated with compromised lateral channel berms, concrete water control structures, floodplain water spreader berms, and stock tanks were identified as threats to floodplains and associated habitat. Almost half of 27 identified lateral channel berms (48%) have been breached and 15% have experienced lateral scour; 18% of 218 shorter water spreader berms have been breached and 17% have experienced lateral scour. A relatively small number of 117 stock tanks (6%) are identified as structurally compromised based on analysis of aerial imagery, although many currently do not provide consistent water supplies. In some cases, the onset of localized disturbance is recent enough that opportunities for mitigation can be identified to alter the potentially damaging erosion trajectories that are ultimately driven by regional geomorphic instability. Understanding the effects of prior land use and remnant structures on channel and floodplain morphologic condition is critical because both current land management and future land use options are constrained by inherited land use legacy effects.

Arizona

Streambed scour of salmon spawning habitat in a regulated river influenced by management of peak discharge

In the Pacific Northwest of the United States, salmon eggs incubating within streambed gravels are susceptible to scour during floods. The threat to egg-to-fry survival by streambed scour is mitigated, in part, by the adaptation of salmon to bury their eggs below the typical depth of scour. In regulated rivers globally, we suggest that water managers consider the effect of dam operations on scour and its impacts on species dependent on benthic habitats. We instrumented salmon-spawning habitat with accelerometer scour monitors (ASMs) at 73 locations in 11 reaches of the Cedar River in western Washington State of the United States from Autumn 2013 through the Spring of 2014. The timing of scour was related to the discharge measured at a nearby gage and compared to previously published ASM data at 26 locations in two reaches of the Cedar River collected between Autumn 2010 and Spring 2011. Thirteen percent of the recovered ASMs recorded scour during a peak-discharge event in March 2014 (2-to 3-year recurrence interval) compared to 71% of the recovered ASMs during a higher peak-discharge event in January 2011 (10-year recurrence interval). Of the 23 locations where ASMs recorded scour during the 2011 and 2014 deployments, 35% had scour when the discharge was ≤87.3 m 3 /s (3,082 ft 3 /s) (2-year recurrence interval discharge) with 13% recording scour at or below the 62.3 m 3 /s (2,200 ft 3 /s) operational threshold for peak-discharge management during the incubation of salmon eggs. Scour to the depth of salmon egg pockets was limited during peak discharges with frequent (1.25-year or less) recurrence intervals, which managers can regulate through dam operations on the Cedar River. Pairing novel measurements of the timing of streambed scour with discharge data allows the development of peak-discharge management strategies that protect salmon eggs incubating within streambed gravels during floods.

Washington

Geomorphic response of the North Fork Stillaguamish River to the State Route 530 landslide near Oso, Washington

On March 22, 2014, the State Route 530 Landslide near Oso, Washington mobilized 8 million cubic meters of unconsolidated Pleistocene material, creating a valley‑spanning deposit that fully impounded the North Fork Stillaguamish River. The river overtopped the 8-meter high debris impoundment within 25 hours and began steadily incising a new channel through the center of the deposit. Repeat topographic surveys, sediment transport measurements, bedload transport models, and observations of downstream channel change were used to document the establishment of that new channel through the landslide and assess the potential for downstream aggradation or channel change that might increase downstream flood hazards. Efficient erosion of the landslide deposit, associated with the steep knickzone formed by the downstream edge of the deposit, resulted in the re-establishment of a 20–40 meters wide, deeply inset channel through the entire deposit by May 2014, 2 months after the landslide. The mean water-surface elevation of the channel through the landslide decreased 7 meters during that 2-month period, and was about 1 meter above the pre-landslide profile in July 2014. The 2014–15 flood season, which included flows near the 0.5 annual exceedance probability discharge (2-year flood), widened the channel tens of meters, and further lowered the water-surface profile 0.5 meter. The planform position evolved slowly as a result of 5–20-meter high banks predominantly composed of clay-rich, cohesive lacustrine material. Erosion of the landslide deposit delivered a total of 820 thousand metric tons of sediment to the North Fork Stillaguamish River over the 18 months following the landslide. The sediment delivery from the deposit was predominantly fine grained: 77 percent (by mass) of the eroded material was silt or clay (less than 0.063 millimeter [mm]), 19 percent sand (0.063–2 mm), and 4 percent pebbles and cobbles (greater than 2 mm). Over the 18 months following the landslide, the bedload at a site 5 kilometers downstream of the landslide was estimated to be 310±65 thousand metric tons, and the suspended load at that same site was estimated to be 990±110 thousand metric tons. These loads represent the combined input from the landslide and ambient upstream sources; over the study interval, landslide sediment made up about 20–40 percent of the bedload, and 65–85 percent of the suspended-sediment load at this site. At a site 70 kilometers downstream of the landslide, near the mouth of the main‑stem Stillaguamish River, suspended sediment loads were estimated to be about 1,440 thousand metric tons, of which about 600 thousand metric tons, or 30 percent, likely was derived from the landslide. The mass of landslide sediment in suspension at the mouth of the river, and the timing of arrival of that sediment, indicates that about 70 percent of the landslide sediment eroded during the study period was quickly transported through the entire basin, exiting into Puget Sound within weeks of initial entrainment. Empirical bedload transport equations, in conjunction with surficial grain-size data and output from a one‑dimensional hydraulic model, were used to estimate spatial trends in bedload transport capacity, highlighting areas where reach-scale conditions would be most likely to promote deposition of coarse landslide sediment. Transport capacities decreased sharply over a reach about 5 kilometers downstream of the landslide and remained relatively low over the next 10 kilometers downstream. However, the magnitude of calculated transport capacities are large relative to the coarse sediment input from the landslide, suggesting that substantial deposition of landslide sediment was not likely to occur. These assessments were corroborated by observations of channel change, which indicated that the downstream channel response to the landslide was modest and short-lived. The most pronounced downstream effects included a wedge of aggradation just downstream of the landslide, about 1 meter high and extending a kilometer downstream, and a 0.3-meter pulse of aggradation observed 5 kilometers downstream of the landslide. In both locations, peak aggradation and channel response occurred within about a month of the landslide, and both sites had largely recovered to pre-landslide conditions by July 2014. No substantial channel change clearly linked to the landslide was observed after July 2014 except for a modest fining of surficial gravel size distributions and continued recovery and incision of the reach just downstream of the landslide. The muted downstream response of the North Fork Stillaguamish River to the State Route 530 Landslide primarily can be attributed to the cohesive, silt- and clay-rich material that bounded most of the new channel. Although the river efficiently incised a new channel through the deposit, subsequent rates of lateral erosion were slowed by the tall, cohesive banks, limiting the total volume of sediment delivery. Once entrained, however, most landslide material was rapidly transported downstream in suspension with little geomorphic effect. Landslide material coarse enough to travel as bedload was predominantly sand and fine gravel, and sediment transport models and observations of downstream change indicated that the rate of coarse sediment delivery from the landslide did not exceed the rivers ability to transport that material. The generally muted downstream response to sediment delivery from the State Route 530 Landslide, as well as the mechanics of that delivery and response, were generally consistent with observations made following the intentional removal of constructed dams. The rate and efficiency of erosion from the landslide decreased over the period of analysis, as the new channel approached a quasi-equilibrium form. In the absence of additional hillslope activity, rates of erosion from the landslide are likely to be small compared to those over the first 18 months after the landslide. The modest channel response to the highest rates of sediment delivery, and rapid recovery thereafter, indicate that the river should be able to convey the continued supply of landslide-derived sediment effectively with little effect on the downstream morphology and flood risks.

Washington

Dam removal: Listening in

Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad-scale ecological effects, and gives managers information needed to understand and predict long-term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (< 5 years) and do not adequately represent the diversity of dam types, watershed conditions, and dam-removal methods in the U.S.

Water Resources Research

Geomorphic responses to dam removal in the United States – a two-decade perspective

Recent decades have seen a marked increase in the number of dams removed in the United States. Investigations following a number of removals are beginning to inform how, and how fast, rivers and their ecosystems respond to released sediment. Though only a few tens of studies detail physical responses to removals, common findings have begun to emerge. They include: (1) Rivers are resilient and respond quickly to dam removals, especially when removals are sudden rather than prolonged. Rivers can swiftly evacuate large fractions of reservoir sediment (≥50% within one year), especially when sediment is coarse grained (sand and gravel). The channel downstream typically takes months to years—not decades—to achieve a degree of stability within its range of natural variability. (2) Modest streamflows (<2-year return interval flows) can erode and transport large amounts of reservoir sediment. Greater streamflows commonly are needed to access remnant reservoir sediment and transport it downstream. (3) Dam height, sediment volume, and sediment caliber strongly influence downstream response to dam removal. Removals of large dams (≥10 m tall) have had longer-lasting and more widespread downstream effects than more common removals of small dams. (4) Downstream valley morphology and position of a dam within a watershed influence the distribution of released sediment. Valley confinement, downstream channel gradient, locations and depths of channel pools, locations and geometries of extant channel bars, and locations of other reservoirs all influence the downstream fate of released sediment.

Book chapter

Suspended sediment delivery to Puget Sound from the lower Nisqually River, western Washington, July 2010–November 2011

On average, the Nisqually River delivers about 100,000 metric tons per year (t/yr) of suspended sediment to Puget Sound, western Washington, a small proportion of the estimated 1,200,000 metric tons (t) of sediment reported to flow in the upper Nisqually River that drains the glaciated, recurrently active Mount Rainier stratovolcano. Most of the upper Nisqually River sediment load is trapped in Alder Lake, a reservoir completed in 1945. For water year 2011 (October 1, 2010‒September 30, 2011), daily sediment and continuous turbidity data were used to determine that 106,000 t of suspended sediment were delivered to Puget Sound, and 36 percent of this load occurred in 2 days during a typical winter storm. Of the total suspended-sediment load delivered to Puget Sound in the water year 2011, 47 percent was sand (particle size >0.063 millimeters), and the remainder (53 percent) was silt and clay. A sediment-transport curve developed from suspended-sediment samples collected from July 2010 to November 2011 agreed closely with a curve derived in 1973 using similar data-collection methods, indicating that similar sediment-transport conditions exist. The median annual suspended-sediment load of 73,000 t (water years 1980–2014) is substantially less than the average load, and the correlation (Pearson’s r = 0.80, p = 8.1E-9, n =35) between annual maximum 2-day sediment loads and normalized peak discharges for the period indicates the importance of wet years and associated peak discharges of the lower Nisqually River for sediment delivery to Puget Sound. The magnitude of peak discharges in the lower Nisqually River generally is suppressed by flow regulation, and relative to other free-flowing, glacier-influenced rivers entering Puget Sound, the Nisqually River delivers proportionally less sediment because of upstream sediment trapping from dams.

Washington

Effect of a levee setback on aquatic resources using two-dimensional flow and bioenergetics models

Watershed restoration is the focus of many resource managers and can include a multitude of restoration actions each with specific restoration objectives. For the White River flowing through the cities of Pacific and Sumner, Washington, a levee setback has been proposed to reconnect the river with its historical floodplain to help reduce flood risks, as well as provide increased habitat for federally listed species of salmonids. The study presented here documents the use of a modeling framework that integrates two-dimensional hydraulic modeling with process-based bioenergetics modeling for predicting how changes in flow from reconnecting the river with its floodplain affects invertebrate drift density and the net rate of energy intake of juvenile salmonids. Modeling results were calculated for flows of 25.9 and 49.3 cubic meters per second during the spring, summer, and fall. Predicted hypothetical future mean velocities and depths were significantly lower and more variable when compared to current conditions. The abundance of low energetic cost and positive growth locations for salmonids were predicted to increase significantly in the study reach following floodplain reconnection, particularly during the summer. This modeling framework presents a viable approach for evaluating the potential fisheries benefits of reconnecting a river to its historical floodplain that integrates our understanding of hydraulic, geomorphology, and organismal biology.

Washington

Transport and deposition of asbestos-rich sediment in the Sumas River, Whatcom County, Washington

Heavy sediment loads in the Sumas River of Whatcom County, Washington, increase seasonal turbidity and cause locally acute sedimentation. Most sediment in the Sumas River is derived from a deep-seated landslide of serpentinite that is located on Sumas Mountain and drained by Swift Creek, a tributary to the Sumas River. This mafic sediment contains high amounts of naturally occurring asbestiform chrysotile. A known human-health hazard, asbestiform chrysotile comprises 0.25–37 percent, by mass, of the total suspended sediment sampled from the Sumas River as part of this study, which included part of water year 2011 and all of water years 2012 and 2013. The suspended-sediment load in the Sumas River at South Pass Road, 0.6 kilometers (km) downstream of the confluence with Swift Creek, was 22,000 tonnes (t) in water year 2012 and 49,000 t in water year 2013. The suspended‑sediment load at Telegraph Road, 18.8 km downstream of the Swift Creek confluence, was 22,000 t in water year 2012 and 27,000 t in water year 2013. Although hydrologic conditions during the study were wetter than normal overall, the 2-year flood peak was only modestly exceeded in water years 2011 and 2013; runoff‑driven geomorphic disturbance to the watershed, which might have involved mass wasting from the landslide, seemed unexceptional. In water year 2012, flood peaks were modest, and the annual streamflow was normal. The fact that suspended-sediment loads in water year 2012 were equivalent at sites 0.6 and 18.8 km downstream of the sediment source indicates that the conservation of suspended‑sediment load can occur under normal hydrologic conditions. The substantial decrease in suspended-sediment load in the downstream direction in water year 2013 was attributed to either sedimentation in the intervening river reach, transfer to bedload as an alternate mode of sediment transport, or both. The sediment in the Sumas River is distinct from sediment in most other river systems because of the large percentage of asbestiform chrysotile in suspension. The suspended sediment carried by the Sumas River consists of three major components: (1) a relatively dense, largely non-flocculated material that settles rapidly out of suspension; (2) a lighter component containing relatively high proportions of flocculated material, much of it composed of asbestiform chrysotile; and (3) individual chrysotile fibers that are too small to flocculate or settle out, and remain in suspension as wash load (these fibers are on the order of microns in length and tenths of microns in diameter). Whereas the bulk density of the first (heaviest) component of suspended sediment was between 1.5 and 1.6 grams per cubic centimeter (g/cm3), the bulk density of the flocculated material was an order of magnitude lower (0.16 g/cm3), even after 24 hours of settling. Soon after immersion in water, the fresh chrysotile fibers derived from the Swift Creek landslide seem to flocculate readily into large bundles, or floccules, that exhibit settling velocities characteristic of coarse silts and fine sands (30 and 250 micrometers). In quiescent water within this river system, the floccules settle out quickly, but still leave between 2.4 and 19.5 million chrysotile fibers per liter in the clear overlying water. Consistent with the results from previous laboratory research, the amounts of asbestiform chrysotile in the water column in Swift Creek, as well as in the Sumas River close to and downstream of its confluence with Swift Creek, were determined to be directly correlated with pH. This observation offers a possible alternative to either turbidity or suspended‑sediment concentration as a surrogate for the concentration of fresh asbestiform chrysotile in suspension. Continued movement and associated erosion of the landslide through mass wasting and runoff will maintain large sediment loads in Swift Creek and in the Sumas River for the foreseeable future. Given the present channel morphology of the river system, aggradation (that is, sediment accumulation) in Swift Creek and the Sumas River are also likely to continue.

Washington

Preliminary assessment of aggradation potential in the North Fork Stillaguamish River downstream of the State Route 530 landslide near Oso, Washington

On March 22, 2014, the State Route 530 Landslide near Oso, Washington, traveled almost 2 kilometers (km), destroyed more than 40 structures, and impounded the North Fork Stillaguamish River to a depth of 8 meters (m) and volume of 3.3&times;10 6 cubic meters (m 3 ). The landslide killed 43 people. After overtopping and establishing a new channel through the landslide, the river incised into the landslide deposit over the course of 10 weeks draining the impoundment lake and mobilizing an estimated 280,000&plusmn;56,000 m 3 of predominantly sand-sized and finer sediment. During the first 4 weeks after the landslide, this eroded sediment caused downstream riverbed aggradation of 1&ndash;2 m within 1 km of the landslide and 0.4 m aggradation at Whitman Road Bridge, 3.5 km downstream. Winter high flows in 2014&ndash;15 were anticipated to mobilize an additional 220,000&plusmn;44,000 m 3 of sediment, potentially causing additional aggradation and exacerbating flood risk downstream of the landslide. Analysis of unit stream power and bed-material transport capacity along 35 km of the river corridor indicated that most fine-grained sediment will transport out of the North Fork Stillaguamish River, although some localized additional aggradation was possible. This new aggradation was not likely to exceed 0.1 m except in reaches within a few kilometers downstream of the landslide, where additional aggradation of up to 0.5 m is possible. Alternative river response scenarios, including continued mass wasting from the landslide scarp, major channel migration or avulsion, or the formation of large downstream wood jams, although unlikely, could result in reaches of significant local aggradation or channel change.

Washington

Landslide mobility and hazards: implications of the 2014 Oso disaster

Landslides reflect landscape instability that evolves over meteorological and geological timescales, and they also pose threats to people, property, and the environment. The severity of these threats depends largely on landslide speed and travel distance, which are collectively described as landslide &ldquo;mobility&rdquo;. To investigate causes and effects of mobility, we focus on a disastrous landslide that occurred on 22 March 2014 near Oso, Washington, USA, following a long period of abnormally wet weather. The landslide's impacts were severe because its mobility exceeded that of prior historical landslides at the site, and also exceeded that of comparable landslides elsewhere. The &sim;8&times;10 6 m 3 landslide originated on a gently sloping (<20&deg;) riverside bluff only 180 m high, yet it traveled across the entire &sim;1 km breadth of the adjacent floodplain and spread laterally a similar distance. Seismological evidence indicates that high-speed, flowing motion of the landslide began after about 50 s of preliminary slope movement, and observational evidence supports the hypothesis that the high mobility of the landslide resulted from liquefaction of water-saturated sediment at its base. Numerical simulation of the event using a newly developed model indicates that liquefaction and high mobility can be attributed to compression- and/or shear-induced sediment contraction that was strongly dependent on initial conditions. An alternative numerical simulation indicates that the landslide would have been far less mobile if its initial porosity and water content had been only slightly lower. Sensitive dependence of landslide mobility on initial conditions has broad implications for assessment of landslide hazards.

Washington

Large-scale dam removal on the Elwha River, Washington, USA: river channel and floodplain geomorphic change

A substantial increase in fluvial sediment supply relative to transport capacity causes complex, large-magnitude changes in river and floodplain morphology downstream. Although sedimentary and geomorphic responses to sediment pulses are a fundamental part of landscape evolution, few opportunities exist to quantify those processes over field scales. We investigated the downstream effects of sediment released during the largest dam removal in history, on the Elwha River, Washington, USA, by measuring changes in riverbed elevation and topography, bed sediment grain size, and channel planform as two dams were removed in stages over two years. As 10.5 million t (7.1 million m 3 ) of sediment was released from two former reservoirs, downstream dispersion of a sediment wave caused widespread bed aggradation of ~ 1 m (greater where pools filled), changed the river from pool&ndash;riffle to braided morphology, and decreased the slope of the lowermost river. The newly deposited sediment, which was finer than most of the pre-dam-removal bed, formed new bars (largely pebble, granule, and sand material), prompting aggradational channel avulsion that increased the channel braiding index by almost 50%. As a result of mainstem bed aggradation, floodplain channels received flow and accumulated new sediment even during low to moderate flow conditions. The river system showed a two- to tenfold greater geomorphic response to dam removal (in terms of bed elevation change magnitude) than it had to a 40-year flood event four years before dam removal. Two years after dam removal began, as the river had started to incise through deposits of the initial sediment wave, ~ 1.2 million t of new sediment (~ 10% of the amount released from the two reservoirs) was stored along 18 river km of the mainstem channel and 25 km of floodplain channels. The Elwha River thus was able to transport most of the released sediment to the river mouth. The geomorphic alterations and changing bed sediment grain size along the Elwha River have important ecological implications, affecting aquatic habitat structure, benthic fauna, salmonid fish spawning and rearing potential, and riparian vegetation. The response of the river to dam removal represents a unique opportunity to observe and quantify fundamental geomorphic processes associated with a massive sediment influx, and also provides important lessons for future river-restoration endeavors.

Washington

Large-scale dam removal on the Elwha River, Washington, USA: fluvial sediment load

The Elwha River restoration project, in Washington State, includes the largest dam-removal project in United States history to date. Starting September 2011, two nearly century-old dams that collectively contained 21 &plusmn; 3 million m 3 of sediment were removed over the course of three years with a top-down deconstruction strategy designed to meter the release of a portion of the dam-trapped sediment. Gauging with sediment-surrogate technologies during the first two years downstream from the project measured 8,200,000 &plusmn; 3,400,000 tonnes of transported sediment, with 1,100,000 and 7,100,000 t moving in years 1 and 2, respectively, representing 3 and 20 times the Elwha River annual sediment load of 340,000 &plusmn; 80,000 t/y. During the study period, the discharge in the Elwha River was greater than normal (107% in year 1 and 108% in year 2); however, the magnitudes of the peak-flow events during the study period were relatively benign with the largest discharge of 292 m 3 /s (73% of the 2-year annual peak-flow event) early in the project when both extant reservoirs still retained sediment. Despite the muted peak flows, sediment transport was large, with measured suspended-sediment concentrations during the study period ranging from 44 to 16,300 mg/L and gauged bedload transport as large as 24,700 t/d. Five distinct sediment-release periods were identified when sediment loads were notably increased (when lateral erosion in the former reservoirs was active) or reduced (when reservoir retention or seasonal low flows and cessation of lateral erosion reduced sediment transport). Total suspended-sediment load was 930,000 t in year 1 and 5,400,000 t in year 2. Of the total 6,300,000 &plusmn; 3,200,000 t of suspended-sediment load, 3,400,000 t consisted of silt and clay and 2,900,000 t was sand. Gauged bedload on the lower Elwha River in year 2 of the project was 450,000 &plusmn; 360,000 t. Bedload was not quantified in year 1, but qualitative observations using bedload-surrogate instruments indicated detectable bedload starting just after full removal of the downstream dam. Using comparative studies from other sediment-laden rivers, the total ungauged fraction of < 2-mm bedload was estimated to be on the order of 1.5 Mt.

Washington