Search USGS⌕ Search

Geology topics

Anthony J. Calandro

Publications and source records attributed to Anthony J. Calandro.

3 recordsLinked to original sources

Time of travel of solutes in the Vermilion River, Louisiana

Dye-tracer studies were made in November 1978 and in June 1979 to define streamflow patterns in the Vermilion River. For the November 1978 study the tracer was injected at two locations, Surrey Street in Lafayette and about 7 miles downstream at State Highway 3073; the discharge at Surrey Street at the time of injection was 218 cubic feet per second. The two dye clouds merged at Broussard Cemetery, about 12.2 miles downstream from Surrey Street, after an elapsed time of about 270 hours. After 438 hours the dye cloud extended form the Abbeville bridge (Louisiana Highway 14 Bypass) upstream about 14.5 miles. In June 1979, a tracer was injected into the river at Surrey Street at Lafayette; the discharge at Surrey Street at the time of injection was 161 cubic feet per second. Forty-two hours after injection the leading edge of the tracer was located at the Milton pumping plant, 14 miles downstream from the injection site. The average pumping rate of the plant during the study was 440 cubic feet per second. Ninety hours after injection, no indication of the tracer was found in the river, but the tracer was found in a rice-irrigation canal at State Highway 14, about 10 miles west of Abbeville.

Louisiana↗

Time-of-travel of solutes for New River near Geismar, Louisianna

A water tracer (2.0 liters of Rhodamine WT, 20 percent) was injected into New River about 1 mile northwest of Geismar (river mile 26.1) at 0900 hours on April 3, 1974. Figure 1 is a location map showing the stream and sampling sites. As the water tracer moved downstream and dispersed, its concentration was measured periodically at State Highway 30 (river mile 24.5) and near Gonzales (river mile 17.7). Time-concentration curves developed for these two sites are shown in figures 2 and 3, respectively. This study was intended to include observations of the travel at the dam at river mile 14.2; hut high rainfall on April 12 disrupted New River and the tracer, and the study was terminated. However, the leading edge of the dispersed tracer was observed at river mile 14.7 before the study was stopped. The lapsed time and the location of the leading edge of the tracer from time of injection are given in table 1. A discharge of 4.9 ft3/s (cubic feet per second) was measured on April 3 at State Highway 30, and 3.7 ft3/s was measured on April 6 at river mile 17.7 near Gonzales. Each measurement was made during the peak concentration.

Louisiana↗